HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant les differentes pannes, Page 3 of 3  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   ND; Cyclage EL/PS/DP.01 
    Reply   ND; RE: Erreur sur TL/PS/DPi.01, entered from 134.158.88.175 
Entry   Viktor Soskov; Laser status 
Entry   Entered by Kevin Cassou from 134.158.90.231 on Thu Sep 5 10:16:49 2019; Coupure de courant salle laser thomx  
Entry   Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:43:18 2020; , entered from 134.158.195.145 
Entry   Nicolas Delerue; Impossible de lancer IHM_RF 
Entry   C. Bruni / H. Guler; modification du MPS necessaire 
Entry   OD/JNC; inversion polarité LE 
Entry   CB/JNC; clim salle de controle 
icon2.gif   MO; pb frigo/chillers D1 
Entry   MO;  
Entry   MO; puissance RF sortie klystron 
Entry   SC,MO,SP; Problème CTA 
ELOG V3.1.4-395e101