HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant les differentes pannes, Page 1 of 3  Not logged in ThomX    logo
Entry   dupraz; Panne synchroLock 
    Reply   dupraz; RE: Panne synchroLock 
Entry   Viktor Soskov; Laser status 
Entry   VK; alims steerers anneau 
Entry   VK; alims steerers anneau, entered from 134.158.195.143 
Entry   SC,MO,SP; Problème CTA 
Entry   OD/JNC; inversion polarité LE 
Entry   Nicolas Delerue; Impossible de lancer IHM_RF 
Entry   ND HG KD; Probleme station air comprime 
    Reply   ND HG KD; RE: Probleme station air comprime 
    Reply   ND HG KD; RE: RE: Probleme station air comprime 
    Reply   ND HG KD; RE: RE: RE: Probleme station air comprime 
Entry   ND; Local error sur EL/PS/DP et sur RI-C1/PS/DP. 
Entry   ND; Health check: probleme vide Screenshot_from_2022-11-03_09-42-44.png
    Reply   ND; RE: Health check: probleme vide 
Entry   ND; Resolution pb shift check + amelioration 
Entry   ND; Cyclage EL/PS/DP.01 
Entry   ND; Erreur sur TL/PS/DPi.01 
Entry   ND; Erreur sur TL/PS/DPi.01, entered from 134.158.88.175 
    Reply   ND; RE: Erreur sur TL/PS/DPi.01, entered from 134.158.88.175 
ELOG V3.1.4-395e101