| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
Text |
 |
|
132
|
Mon May 22 15:59:33 2023 |
ND, LS | | Info | Other |
|
Alignement OBL | | - Certains connecteurs du MRSV etaient
deconnectes.
- Alignement de la ligne Cerenkov: |
|
|
134
|
Tue Sep 19 09:25:53 2023 |
ND, LS, Marie Labat | Under Process | Info | Other |
|
Alignement Cerenkov 19/9 | | 9:20 Fuite d'eau constatee en salle
de controle. Ticket 13095 mis.
10:00 Mise en chauffe du modulateur |
  |
|
135
|
Tue Nov 7 17:15:53 2023 |
Marie Labat, ND | | Info | Other |
|
Tests camera a balayage | | Des mesures ont ete faites sur la camera
a balayage a differentes frequence.
Le probleme a ete identifie (un |
|
|
Draft
|
Thu Jan 11 14:47:03 2024 |
ND | | Info | Other |
|
Redémarrage diagnostics | | |
|
|
138
|
Wed Jan 17 01:44:41 2024 |
Entered by Nicolas Delerue from 80.119.21.73 on Wed Jan 17 01:44:26 2024 | | Info | Other |
|
WAC remis en déclenchement externe | | ER/CA/RAC.05-WAC.02 était en déclenchement
interne avec déclenchement sur ch0
alors qu'il avait été configuré |
|
|
145
|
Tue Oct 22 11:32:26 2024 |
Entered by Nicolas Delerue from 134.158.196.122 on Tue Oct 22 11:32:11 2024 | Fixed | Fix | Other |
|
MRSV is aligned | | A preliminary alignment of the MRSV has
been done this morning.
There were difficulties with the |
|
|
147
|
Fri Nov 15 12:22:02 2024 |
IC, VM, VK, ND | Under Process | Info | Other |
|
MRSV studies | | Beam position observed on the MRSV when
changing RI-C1/STR.06-H01 (3 images) and
then RI-C1/STR.06-V01 (3 images). |
6x |
|
Draft
|
Thu Feb 13 09:21:16 2025 |
Sc, ND | | Info | Other |
|
SR in ring alignement | | Laser aligned on MRSV.
|
|
|
151
|
Mon Sep 22 14:27:09 2025 |
ND | Fixed | Info | Other |
|
Mise en securité BPM, RDP, WAC et SST avant coupure électrique | | Les liberas, red-pitaya (diags), wavecatcher
et cameras ont été eteints
en prévision de la coupure électrique |
|
|
152
|
Tue Sep 23 14:20:10 2025 |
ND | Fixed | Info | Other |
|
RE: Mise en securité BPM, RDP, WAC et SST avant coupure électrique | | Redémarrage effectué.
|
|
|
10
|
Fri Jan 17 15:25:02 2020 |
Hayg | Fixed | Info | Material |
|
Link to material MAC address and network properties |
| https://atrium.in2p3.fr/c8fc130b-c7e5-4200-ba00-95e5f6921828 |
|
|
28
|
Tue Jul 20 14:38:24 2021 |
Entered by Nicolas Delerue from 134.158.195.145 on Tue Jul 20 14:38:00 2021 | Fixed | Fix | Material |
|
Changements config WAC | | Sur WAC1:
Polling
ch0: 10=> 50 |
|
|
55
|
Fri Jan 14 12:33:03 2022 |
Entered by Nicolas Delerue from 193.55.29.170 on Fri Jan 14 12:32:43 2022 | | Info | Material |
|
Delay change on WAC2 | | We are investigating the charge difference
between LI/ICT.01 and FC.01.
There are big oscillations on FC.01. |
|
|
67
|
Tue Feb 15 08:56:03 2022 |
Entered by Super Team from 134.158.195.141 on Tue Feb 15 08:55:49 2022 | Fixed | Info | Material |
|
Pilotage de l'oscilloscope Lecroy 760zi | | L'oscilloscope est maintenant pilotable
à travers le réseau ThomX:
parametrage oscillocope |
|
|
73
|
Thu Mar 24 17:13:11 2022 |
Entered by ND/VC/SC from 134.158.195.144 on Thu Mar 24 17:12:56 2022 | Under Process | Info | Material |
|
Mesures de charges | | Mesures de charges:
16h41 moyenne sur 50 tirs
16h57 moyenne sur 1000 tirs |
    |
|
75
|
Wed Mar 30 10:02:07 2022 |
Entered by Nicolas Delerue from 80.119.21.73 on Wed Mar 30 10:01:48 2022 | Under Process | Info | Material |
|
Tests en cours sur WAC 01 | | Attention, tests de config pour comprendre
le bruit sur er/ca/rac.05-elr.01-wac.01
La config en place n'est pas |
|
|
76
|
Wed Mar 30 19:09:13 2022 |
Entered by Nicolas Delerue from 80.119.21.73 on Wed Mar 30 10:01:48 2022 | Under Process | Info | Material |
|
RE: Tests en cours sur WAC 01 | | Observation:
Toujours s'assurer que EnableDynamicCharge
est sur False |
|
|
77
|
Thu Mar 31 00:26:59 2022 |
Entered by Nicolas Delerue from 80.119.21.73 on Wed Mar 30 10:01:48 2022 | Under Process | Info | Material |
|
RE: RE: Tests en cours sur WAC 01 | | Fin des tests. er/ca/rac.05-elr.01-wac.01
est de retour sur sa config habituelle.
|
|
|
88
|
Mon Sep 5 16:10:59 2022 |
ND/AM/VK | | Problem | Material |
|
Permutation cables reseau WAC2 et WAC3 | | Suite a un probleme de fonctionnement des
WAC, nous avons permutter les cables reseau
des WAC2 et WAC3. |
|
|
90
|
Fri Sep 9 13:48:46 2022 |
ND IC AM HG | Not Fixed | Problem | Material |
|
Obstruction par les fentes | | Verification de l'obstruction du faisceau
par les fentes.
Le mors cote mur obstrue legerement |
|