HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Diagnostiques
  elog des diags., Page 2 of 8  Not logged in ThomX    logo
Entry   Entered by ND/VC/SC from 134.158.195.144 on Thu Mar 24 17:12:56 2022; Mesures de charges Screenshot_from_2022-03-24_16-41-08.pngScreenshot_from_2022-03-24_16-57-54.pngScreenshot_from_2022-03-24_17-03-39.pngScreenshot_from_2022-03-24_17-11-19.pngScreenshot_from_2022-03-24_17-16-17-avg10.png
Entry   ND/VC/AM/SC/HG; Mesures de charge charge_plot_25.pngcharge_plot_26.png
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Wed Mar 30 10:01:48 2022; Tests en cours sur WAC 01 
   +  Reply   Entered by Nicolas Delerue from 80.119.21.73 on Wed Mar 30 10:01:48 2022; RE: Tests en cours sur WAC 01 
   +  Reply   Entered by Nicolas Delerue from 80.119.21.73 on Wed Mar 30 10:01:48 2022; RE: RE: Tests en cours sur WAC 01 
Entry   Entered by Super Team from 134.158.195.141 on Mon Aug 22 15:38:17 2022; Verification cablage BPM (VC, IC, LP, AM) 
Entry   Entered by Super Team from 134.158.195.141 on Mon Aug 22 18:15:58 2022; Travaille sur station SST 
Entry   ND AM VK VM;  
Entry   ND HG IC AM VK V.; Saturation des cameras 
Entry   ND AM; Control intensité caméras SST 
Entry   ND AM; TL/DG/SST.02 
Entry   ND; Desinstallation EL/DG/SST 
Entry   ND; Installation MRSV 
   +  Reply   ND; RE: Installation MRSV 
Entry   ND; Intervention du 15/11 
Entry   ND, Mateo Fanet, Francois Belcourt; Etudes sur les BPM 
Entry   ND, Mateo Fanet, Francois Belcourt; Etudes sur les BPM 
Entry   ND, VC; Etude calibration BPMs 
   +  Reply   ND; RE: Câblage 
Entry   Entered by Nicolas Delerue from 134.158.195.142 on Thu Feb 16 10:13:43 2023; Test temps reponse IHM SST 
ELOG V3.1.4-395e101