539
|
Tue Sep 6 08:28:09 2022 |
AM ND LP KD et al | | Shift summary | Aimants |
|
Démarrage de la machine | | 8h20 : EXTINCTION DE TOUTES LES INTERFACES
LAISSÉ EN PLAN !!!
Certaine interface avait même |
| |
Draft
|
Wed Apr 8 07:29:51 2026 |
7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage) | | | |
|
, entered from 127.0.0.1 | | 7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)
8h30 HV is ON |
| |
772
|
Fri Jun 16 09:36:07 2023 |
VK, IC. VM, AL, ND, LS | | Shift summary | Ring Commissioning |
|
Orbit correction, optimization of the storage, study of the RF frequency | | 9h30 Start of the modulator and lasser
(GATE is closed).
9h46 Data is taken as background. |
8x | |
901
|
Tue Aug 13 10:28:30 2024 |
M ELK | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Suite conditionnement section 13/08 pour validation | | Vérification Pression SF6
=2.45 bar
Vérification Températeure |
 | |
Draft
|
Tue Apr 4 15:21:51 2023 |
| | | |
|
, entered from 134.158.195.141 | | <p>12h10: Mise en chauffe modulateur, laser
et chiller + PA</p>
|
|
|