682
|
Thu Feb 16 14:57:54 2023 |
MJ SC | | Shift summary | Linac Commissionning |
|
| | Pour phase section 110, pour etre aligne sur l'axe des 3 quads Q1 Q2 Q3 : str1H -1.3 str1V +0.8 str3H -5 str3V +1
avec cet alignement : bpmtl1 x=0.1 y= 0.1 avec quad a zero
bpmtl1 x=-0.2 y= 0 avec quad1 -3 quad2 +4 quad3 -3
On passe ds TL dip=159.3 quads a zero sol 210
on se met a 1.48 db pour etre a peu pres au centre phase 100 (mesure energie 49 MeV)
le faisceau saute sans arret cf. Screenshot_from_2023-02-16_15-48-39.png et Screenshot_from_2023-02-16_16-01-46.png
position sur bpmtl 1 et 2 : cf Screenshot_from_2023-02-16_16-18-55.png - On voit un saut sur bpmtl1 soudainement. ce type de saut 2 ou 3 fois observe en 1h ...
|
|
683
|
Thu Feb 16 19:25:09 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Feb 16 19:24:54 2023 | Not Fixed | Urgent | Diag |
|
| | Voila en pj le status de cette semaine sur les calib LINAC BPM et Yag
Calib BPM LI BPMTL1 YAGTL1 : not OK
Calib YAGLI : ~ ok |
|
724
|
Thu Mar 30 17:20:43 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 17:20:29 2023 | | Shift summary | Linac Commissionning |
|
| | Shift ce matin
** YagTL1 vs soleno avec alignement a la Kev ou a la Hayg (mais chaque fois aligne dans Q1-Q3). --> trajet dans la LIL differents - Mesures avec soustraction courant obscurite (df la pj)
** pour Sol=180A, taille sur YAG 1 pour plusieurs str1 ---> taille horix sur YAGTL1 varie de 0.2 a 0.8 (cf la pj)
Meme si le passage dans la LIL avec des desalignement differents a un effet, ca n'explique toujours pas le desaccord data/simul ASTRA ...
Fin de shift vers 13h |
|
733
|
Tue Apr 11 22:34:19 2023 |
Marie Vincent Noureddine Jean-Noel | | Shift summary | Linac Commissionning |
|
| | Debut vers 16h
Passage section avec Isol=200, 1.7 db, ph=110
Avec script alignement QUADS de Kevin
Alignement Q1 avec strLI1 ---> H = -1.29 V= 0.52
Alignement Q3 avec StrTL1 (et Q1 = 1A) ---> H = -2.44 V = -0.33
" " " " (et Q1 = 0) ---> H = -3.64 V = 0.12
Alignement Q3 avec StrLI2 (et Q1 = 0) ---> H = -0.06 V = 0.01 (ca semble pas fonctionner correctement ... a reverifier)
" " " " (et Q1 = 1) ---> H = -0.1 V = 0.01 (ca semble pas fonctionner correctement ... a reverifier)
On continue SANS StrTL1, i.e. :
StrLI1H = -1.29 StrLI1V = 0.52 StrLI2H = -0.1 StrLI2V = 0.01
Passage dipole 153.9 A, Q1=-1.2 Q2=3.1 Q3=-1.2 Idip=180 - Min dispersion pour ph_LIL=106
Images dans SST_TL2_sol180_min_disp
Sans toucher aux quads, dipole=0, image sur SST_TL1 dans SST_TL1_sol180_min_disp
Idip = 190 (toujours sans toucher aux quads)
Images dans SST_TL2_sol190_min_disp
dipole=0, image sur SST_TL1 dans SST_TL1_sol190_min_disp
Intention de Quad scan de Q3 (avec Q1=-1.2 Q2=3.1) pour I_dip=180 puis I_dip= 190
---> scan de -8 a +2 faisceau ok dans cette gamme (le faisceau se deplace beaucoup beaucoup sur SST_TL1 lorsque Q3=-8 a +2 , l'alignement avec STRLI 1 et 2 n'est pas bon je pense)
script Quad scan de Christelle ne marche pas (erreur en rouge, je ne sais plus ce que dit cette erreur)
Parallelement : Prises de donnees oscillo
1) Pilote - Klystron - Phase pilote/Klystron
2) Pilote - PA - Phase pilote/PA
et PiS + BPMs en meme temps.
---> A traiter (le faisceau sur BPMTL2 etait hyper bruite et "sautait" pendant toute cette prise de donnees)
Fin vers 20h30 |
|
757
|
Thu May 25 15:08:18 2023 |
NC,IC, VM,lS | | Shift summary | Ring |
|
| | 9:10 warm up modulator
10:30: cycling of magnets
10:20 : scan charge phase
11:00 beam in the ring
Attempt to store at 500.02 MHz
Scan RF cavity phase at frequency 500,0117Mhz for different power in cavity
Optimization of dipole current to improve storage after ramping the cavity
Scan RF cavity frequency but results are difficult to interpret
Ccl: we kill the storage (50turns) for 50kV in the RF cavity
|
|
Draft
|
Tue Oct 10 13:46:06 2023 |
KD MJ | | Shift summary | |
|
| | |
|
829
|
Tue Jan 16 09:00:27 2024 |
MJ et SC | | Shift summary | Linac Commissionning |
|
| | 9h Mise en chauffe modulateur et refroidissements
Démarrage ampli laser
9h07 fermeture casemate
faisceau sur yag
bpmLI1 sature (screenshot) + mesure charge marche pas - Intervention nicolas et vincent :
Mesure de charge ictLI remarche decalage du linac trigger laser gun de -8 us à -8.20 us en retard
bpmLI1 redevenu OK
charge 100 pC (attenuateur laser 310)
-50 pour phase pour energie max - soleno 210 - phase canon 316
steerer LI ne s'allument pas (appel Jean noel ) - probleme regle par JN
mesure energie : 5.2 MeV
passage section --> faisceau sur yagtl1
mesure energie section :
53 MeV pour 1.75 db phase 110
50.7 MeV pour 2 db phase 110
ictTL01 MARCHE PAS (screenshot) --> demande a Nicolas
Dipole on : 159.3
faisceau sur bpmTL2 (screenshot) - RIEN sur YAGTL2 impossible de visualiser ni faisceau ni courant obscurite --> appel Nicolas
Plus aucune camera ne peut etre mises sur ON - Comme il n' y a personne pour m'aider j'essaye "restart all camera server " - YagTL1 refonctionne apres ca -
mais YAGTL2 ne marche toujours pas, ni ictTL01 (ni sans doute ictTL2 ni yagtl03) - signaux RF ne sont plus visibles sur RF_plot (alors qu'il y a du faisceau)
donc : FIN de shift
Bon finalement on essaye de continuer quand meme ...
On a reussi a avoir du signal sur BPMTL4 en mettant l'attenuateur section a 1.6. Au dessus pas de signal dans BPMTL4 (voir screenshot)
Remesure d'energie a 1.6 attenuateur section : 52.5 MeV (Au debut de shift on avait 50.7 MeV pour 2 db)
Incomprehensible : pourquoi le faisceau passe dans la TL a 1.6 db et PAS a 2 db
Bilan : pas de faisceau sur TL/DG/SST.02 apres dipole
|
|
872
|
Fri May 31 08:08:56 2024 |
M EK, IC, DN, SC | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
| | 8h10 : Impossible de mettre en chauffe le modulateur via IHM
En local également impossible
Redémarrage de PC du modulateur ==> mise en standby ok à 8H30
start cond. 2dB @ 2µs et 5 Hz ==> baisse progressive de l'atténuation @ 1.7 dB (Pis=17MW) ==> niveau de vide < 8 e-9 mbar (voir image)
claquage dans le réseau HF ( pas de reflechi section "orange") @ 1 dB (Pis=20 MW) voir image==> claquage dans le réseau HF impossible de franchir 1 dB
11h: passage à 3 µs et 5 Hz
start cond. 6 dB et baisse progressive de l'atténuation==> niveau de vide < 1e-8 mbar
@ 5.3 dB 3µs & 5Hz ==> claquage dans le réseau HF voir image
12h 2.8dB 3µs & 5Hz (dephaseur linac 360 deg.) ==> niveau de vide baisse
12h07 @ 2.7 dB 3µs & 5Hz ==> claquage dans le réseau HF voir image
12h25 @ 2.5 dB 3µs & 5Hz ==> plusieurs claquages dans le réseau HF voir image
12h32; 12h34; 12h36 @ 2.5 dB 3µs & 5Hz ==> plusieurs claquages dans le réseau HF
12h42 @ 2.3 dB 3µs & 5Hz
12h46 @ 2 dB 3µs & 5Hz
12h50 @ 1.8 dB 3µs & 5Hz
12h50 @ 1.8 dB 3µs & 5Hz => plusieurs claquages dans le réseau HF
reviens a 2.5 dB ; 2.3 dB
=> plusieurs claquages dans le réseau HF
reviens a 2.5 dB; 2.3 dB ; 2.1 dB
13h20 => plusieurs claquages dans le réseau HF
@ 2.5 dB en changeant la position du déphaseur section ==> claquage donc c'est bien dans le réseau (image), vide < 6.10-9 mbar dans la section.
14h; 2.3 dB Passage à 2µs et 1 Hz pour voir si ça claque et ça claque à 1 dB. Du coup on remonte à 1.5 dB. Vide < 5.E-9 mbar.
0.8 dB (Pis=21 MW) @ 2µs et 1Hz ca claque dans le réseau HF
15h30; on reviens à 3µs et 5 Hz @2,5 dB.
17h16 Descente jusqu'à 1.5 dB au mieux à 3us et 5Hz
17h17 Arret conditionnement, ouverture casemate pour cavité FP
|
|
Draft
|
Fri Sep 27 10:44:50 2024 |
MJ VC | | | Linac Commissionning |
|
| | |
|
936
|
Mon Oct 7 09:31:13 2024 |
Entered by Super Team from 134.158.195.141 on Mon Oct 7 09:30:50 2024 | Fixed | Info | Linac Commissionning |
|
| | pression SF6: 2.3 bar
(nb: redémarrage pc modulateur demain mardi 8/10 à 9h00) |
|
942
|
Wed Oct 23 17:30:58 2024 |
Entered by Super Team from 134.158.195.141 on Wed Oct 23 17:27:14 2024 | Under Process | Shift summary | Linac Commissionning |
|
| | Gun phase 50 dg., At 0.5 dB; Sect phase 230 dg. At 2.65 dB; Sol. 220 A, Gun charge -131 pC, Linac -112 pC, TL -120 pC.
Linac steerers: H [2.2 -3.83], V [-1.46 2.1].
It was atempt to measure dispersion xith TL/BPM2 and the section attenuator. See figure.
It was atempt to measure dispersion xith TL/BPM2 and the section attenuator. See figure. It is unpossible to check TL/BPM2 with the TL/SST.02 camera because a lot of bright spots on the image.
17h50 end of the shift. |
|
950
|
Wed Oct 30 11:33:04 2024 |
VM, IC, VK | Under Process | Info | LI | TL | LE | Ring |
|
| | 9h25 Start ThomX
11h20 HV on, linac RF OK, but there is no laser on the cathode. Trying to fix.
The problem was with the M4 position. initial positions now are: M4 mot.01 2855.00, M4 mot.02 4631.00,
15h25 HV is on.
problems with changing Ring RF frequency. Kevin helped.
With frequency chnge, the trigger stability changes. The rigole phase should be adjusted.
Problem with steerer in the TL TL/PS/STR.03-H.O1 Impossible to set the current. It goes to error.
Looking for solution to compensate its effect. Email to jeabn Noel is sent
Search for non dispersive orbit and frequency. F =500.059 looks good. With RF and without RF orbit is the same.
Further studies ongoing.
End of shift. 1906
|
|
955
|
Thu Nov 7 08:53:22 2024 |
IC, VK, VM, JN | Under Process | Shift summary | Ring |
|
| | 8h50 Start of the modumator and all subsystems
PC client 1 was frozen => we restarted
10h20 HV on 1215 V
RF gun phase 28 dg., Att. 0.0 dB, Charge -106 pC
The beam shape at screen TL/DG/SST.01 is very strange. Big change. Try to allign the QP1 QP3
Steerers: H [2.48 -4.46]; V [-1.86 2.29]
Section Att. 2.77 dB, Phase 208, TL/BPM2 X= 0.1
11h45 Ring injection. Ri-c2/ps/str.06-h.01 and Ri-c2/ps/str.06-v.01 tango servers were off
12h59 Measure Beem energy with TL Steerer: 53.2 MeV (screenshot), TL/BPPM2 X about zero.
12h53 Start ring RF
14h0 Section chiller 'off' (unknown reason), Energy start to drop . Switch to 'on'.
15h27 Modulator on Standby
16h30 HV on.
16h37 Modulator 'off' voluntary. Unknown reason.
17h55 HV 'on' 1215 V, Section Phase 217, -125 pC
18h30 'access controle' to install shunt resistances of 33 Ohm at four magnets (close placed).
18h55 HV 'on' 1215 V, Section Phase 217, -125 pC
Orbit at straight sections goes down on 2 mm.
19h13 Stop ThomX
|
|
960
|
Thu Nov 14 08:33:34 2024 |
Entered by Super Team from 134.158.195.141 on Thu Nov 14 08:33:03 2024 | Under Process | Info | Linac Commissionning |
|
| | 08h30 Start ThomX
10h00 HV is 'ON'
11h03 RF Gun phase 230 dg. Att. 0.0 dB, Laser Att. 360.00, Charge -145 pC, Section Att. 2.59 dB, Phase 207 dg.
Linac steerers: H [2.69 -4.45]; V [-2.14 2.32],
11h20 Ring injection, Orbit studies
11h25 RF gun breakdowns, HV is 'OFF'
11h28 Restart HV, Problems with the Shutter,
11h36 Fixed
Frequent interlocks on V1
Set RF Gun temperature to 31.7 dg. (Clarinette temperature 31.5 -31.6)
11h40 Ring RF is 'ON'
15h43 Freaq. RF=500.1003
16h20 RF GUN Phase 229 dg., Charge -88 pC, Sect. Phase 213 dg. TL/BPM2 X=-2, Att. 2.703
17h00 Trying BBA
QP02 Ri-C2 BPM.01-Lib.04, 0.4 mm on X
QP02 Ri-C1 BPM.01-Lib.03, 1.8 mm on X
QP03 Ri-C1 BPM.02-Lib.03, 0.4 mm on X
QP03 Ri-C2 BPM.02-Lib.04, 0.2 mm on X
17h50 Stop ThomX |
|
965
|
Thu Nov 21 08:27:15 2024 |
VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024 | Under Process | Info | Ring Commissioning |
|
| | 08H25 Start ThomX
09H45 HV is 'ON'
09h49 Breakdown in the RF Gun
09h45 Restart HV
Linac steerers H [2. 66 -4.45]; V [-2.00 2.31]
RF Gun Phase is 223 dg. Att. is 0.0, Charge is -84 pC, Sect. Phase 193 dg., Att. is 2.6 dB TL/BPM02 X 1mm
10h35 Ring Injection
11h00 Change RF to 500.0913
Tune 0.17
11h35 RF Gun Phase is 228 dg. Att. is 0.0, Charge is -50 pC, Sect. Phase 196 dg., Att. is 2.65 dB TL/BPM02 X 1mm
There was problem with section temperature. Fixed, Phases adjusted.
12h40 RF Gun Phase is 227 dg. Att. is 0.0, Charge is -40 pC, Sect. Phase 201 dg., Att. is 2.70 dB TL/BPM02 X =0 mm
17h15 STOP THOMX |
|
Draft
|
Thu Nov 28 08:19:05 2024 |
VM, IC, VK | Under Process | Info | Ring Commissioning |
|
| | 08h18 Start ThomX
10h00 HV is 'ON'
10h35 RF Gun phase is 174 dg. Section Phase is 209 dg. Sect. Att. is 2.70 dB TL/BPM2 X=0, Charge is -127 pC
Linac steerers H [2.66 -4.46], V [-2.00 2.41]
10h40 Start Ring RF 100 kV, TL/BPM2 X=0,5 mm
Ring Studies
12h30 Stop HV and ring RF
12h40 Access: JN went to exchange the shunt resistors
13h26 HV iand ring RF are 'ON'
15h18 RF Gun phasee is 178 dg., Sect. phase is 215 dg.
18h10 Stop ThomX
|
|
974
|
Thu Dec 5 08:31:34 2024 |
VM Entered by Super Team from 134.158.195.141 on Thu Dec 5 08:31:12 2024 | Under Process | Shift summary | Ring Commissioning |
|
| | 08h28 Start ThomX
08h40 Some magnets remain switched off. Cycling was not performed
10h20 V is 'ON'
10h55 RF Gun Phase is 165 dg., Sect. Phase is 236 dg., Att. is 0.2 dB. Chargges: -105 pC, -108 pC, -114 pC I TL/DP =255.8 A (70 MeV)
12h40 Ring optic scaled to 70 MeV, there are two turns, start RCDS on injection
12h50 about 2000 turns without steerers and without RF at the Ring
14h13 Start ring RF
RF is killing beam at 70 MeV. No phase and energy compatible found. Studies ongoing.
15h57 Return to 50 MeV
16h20 Receipt from 28/11/2024 17h51 There is storage
18.05 Stop THOMX.
|
|
975
|
Fri Dec 6 08:24:36 2024 |
VM, IC, VK, HG | Under Process | Shift summary | Ring Commissioning |
|
| | 08h25 Start ThomX
09h55 HV is 'ON'
10h18 RF Gun Phase is 159 dg. Sect. Phase is 208 dg. Att. 2.66 TL/BPM2 X=-2mm, Isol =230 A, Charges: -115 pC, -95.7 pC, -100 pC
Beam injected to the Ring. There is storage there.
10h25 Ring RF is 'On', 100 kV. Storage OK
10h35 Extraction kicker is 'ON' del. is -12.4 us
10h37 TL/BPMé X=+1 mm to minimize synchrotron oscillations. Tune is 0.17
Response matrix measuring
11h45 70 MeV Receipt for 70 MeV with storage: Sect. Att is 0.204, Phase Sect is 237 dg.
12h00 RF 50 kV Beam is killed by RF
12h10 Change frequency to 500.08095 MHz
Many scans in Frequency- slow no result. Tune optics.
17h30 Hayg by scanning RF found correct frequency : 500.0325 . Recipie : Hayg 70.
Good storage!
|
|
980
|
Fri Dec 13 08:22:36 2024 |
VM, IC, VK | Under Process | Shift summary | Ring Commissioning |
|
| | 08h23 Start ThomX
09h40 HV is 'On'
10h24 RF Gun Phase 183 dg. Sect. Att. is 2.533, Phase 212 dg. Charges; -100.0 pC, -93.0 pC, -109.0 pC, Linac steerers H [2.68 -4.4], V [-2.0 2.19]
10h35 Loading receipt from 06/12/2024 11h30, Thereis storage at freq. 500.10045 MHz, 100 kV
12h34 RF Gun Phase 181 dg. Sect. Att. is 2.553, Phase 219 dg. Charges; -106.0 pC, -100.0 pC, -112.0 pC, Linac steerers H [2.68 -4.4], V [-2.0 2.19]
Adjusting the vertical orbit to BPM1 and BPM2 (-1 mm and -1.5 mm respectively) reduces the vertical spot size on the MSRV camera
Checking BBA
14h00 Controlled access to the bunker to check the X-line shutter
15h00 HV is 'ON'
17h15 Stop ThomX
|
|
Draft
|
Thu Dec 19 11:10:03 2024 |
IC, VK, VM | Under Process | Shift summary | Ring Commissioning |
|
| | 11h05 Start ThomX
11h50 BPM02-Libera04 wiring has been checked: 'OK'
12h20 HV is 'ON' 1215 V
12h31 RF Gun phase is 179 dg.
12h48 RF Gun phase is 181 dg. Sect. Att. 2.534 dB, Phase is 213 dg. Linac Steerers H [2.98 -4.66], V [-1.8 2.15]
14h50 HV on Standby. Controlled access
15h20 HV is 'ON'
17h50 Reajust linac transport: linac steerers H [2.38 -4.18], V [-1.9 2.05] Charge -121 pC, -114 pC, -123 pC
18h55 Stop ThomX |
|