| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
|
124
|
Wed Oct 27 16:48:50 2021 |
Entered by Super Team from 134.158.195.141 on Wed Oct 27 16:48:32 2021 | Not Fixed | Urgent | CC | Linac Commissionning |
|
DS calc en défaut | |
Les DS CALC sont en défaut et impossible de les relancer sur client3. Ils n'apparaissement pas dans astor.
Quelqu'un peut il résoudre le problème ?
|
|
991
|
Thu Jan 9 10:31:11 2025 |
Entered by Nicolas Delerue from 134.158.195.144 on Thu Jan 9 10:30:34 2025 | Not Fixed | Problem | CC |
|
DS ThomX_PhotoCathode using a lot of CPU | |
The load on client5 is 29 making all operations slow.
Appently the DS ThomX_PhotoCathode is using a lot of CPU, slowing the rest.
|
| Attachment 1: Screenshot_2025-01-09_10-30-03.png
|
 |
| Attachment 2: Screenshot_from_2025-01-09_10-32-26.png
|
 |
|
177
|
Tue Nov 23 13:12:37 2021 |
Entered by Iryna Chaikovska from 134.158.89.93 on Tue Nov 23 13:12:22 2021 | Under Process | Other | Aimants | Linac Commissionning |
|
Cyclage quadrupoles | |
23/11/2021
We would like to cycle the quadrupoles in the linac. The procedure of the cycling was provided by Cynhia (attached).
The magnet current should be ramped from 0 to IMAX , decreased down 0 and ramped back to IMAX three more times. Measurement current will be finally reached going to nominal current ISet. (IMAX = 12 A).
Total cycling time is ~8 min [so ~1 min for 0 to IMAX, and the same for IMAX to 0). Waiting time at IMAX & I=0 is ~10 sec.
More probably this procedure is driven by the fact that the B(I) curves were provided for the positve values of I only I = 0..+12
As it was discussed with Cynthia: In order to set the negative current (defocusing quadrupole magnets), the cycling procedure should be reversed.
When the calibration curves [-12 A +12 A] will be available, the procedure has to be the following. The magnet current should be ramped from 0 to IMAX , decreased down to -IMAX and then ramped again up to IMAX.
Measurement current will be finally reached going to nominal current ISet. (IMAX = 12 A). Total cycling time is ~6 min [so ~1 min for 0 to IMAX, and the same for IMAX to - IMAX). Waiting time at IMAX & I=0 is ~10 sec.
Figure attached: Quadrupole cycling layout given by Cynthia.
Figure attached: Quadrupole cycling layout in case of bipolar power supplies and corresponding calibration curves.
For the linac, to set the quadrupoles to 0, we can use the last procedure involving the + I max and -Imax (figures attached) and for later, we should discuss with Fabrice Marteau how we procceed.
We made the cycling for the QUAD qnd still we have 5-10 G of the remaining field. To be understood....
|
| Attachment 1: Screenshot_2021-11-23_at_13.14.26.png
|
 |
| Attachment 2: Screenshot_from_2021-11-23_14-09-27.png
|
 |
| Attachment 3: Screenshot_from_2021-11-23_14-10-15.png
|
 |
| Attachment 4: cylage_quad.png
|
 |
| Attachment 5: cylage_quad2A.png
|
 |
|
175
|
Tue Nov 23 10:56:50 2021 |
Entered by Iryna Chaikovska from 134.158.195.143 on Tue Nov 23 10:56:34 2021 | Fixed | Other | Aimants | Linac Commissionning |
|
Cyclage dipole | |
For 22/11/2021
There is the remaining field from the dipoles in the TL. In order to go straight to the dump, the idea was to cycle the dipole to have 0 field. We have tried the cyclage given by the ALBA peopel/Cynthia. Total time ~ 17 min. After two cycling, the remaining filed alwayd stays at ~20 G.
After discussion of Jean-Noel with Fabrice Marteau, this turned out normal situation given the unipolar PS of the dipoles. The remaining filed is kind in agreement with B(I) found in excel files provided long time ago by Cynthia.
The information concerning the dipole cycling from Cynthia is attached. |
| Attachment 1: cylage_dipole.png
|
 |
| Attachment 2: Screenshot_from_2021-11-23_12-16-04.png
|
 |
| Attachment 3: Screenshot_2021-11-23_at_14.40.52.png
|
 |
|
407
|
Mon Mar 21 09:53:11 2022 |
Entered by Iryna Chaikovska from 134.158.195.144 on Mon Mar 21 09:52:37 2022 | | Info | Aimants |
|
Cyclage QUAD (TL) | |
The cycling of the following quads ( to zero current) were tested. The corresponding cycling cuves were loaded in the DS (checked).
TL/PS/cycleQP.01
TL/PS/cycleQP.02
TL/PS/cycleQP.03 |
|
270
|
Thu Jan 20 16:01:14 2022 |
Emmanuel Goutierre | Fixed | Linac | Aimants |
|
Conversion valeur moteur rotation solénoďde | |
Conversion des valeurs des moteurs de rotation du solénoïde
axmo_z
Diamètre de rotation : 552mm
| Coup encodeur (= microstep moteur) |
Tour encodeur |
Pas moteur |
Tour moteur |
Déplacement moteur (um) |
Angle (°) |
Angle (mrad) |
| 1 |
0.0005 |
0.4 |
0.002 |
0.5 |
0.00010 |
0.0018 |
| 2000 |
1 |
800 |
4 |
1000 |
0.21 |
3.62 |
| 2.5 |
0.00125 |
1 |
0.005 |
1.25 |
0.00026 |
0.0045 |
| 500 |
0.25 |
200 |
1 |
250 |
0.052 |
0.91 |
| 2 |
0.001 |
0.8 |
0.004 |
1 |
0.00021 |
0.0036 |
| 9635.2 |
4.82 |
3854.08 |
19.27 |
4817.6 |
1 |
17.45 |
| 552 |
0.28 |
220.8 |
1.1 |
276 |
0.057 |
1 |
axmo_x
Diamètre de rotation : 672m
| Pas encodeur (= microstep moteur) |
Tour encodeur |
Pas moteur |
Tour moteur |
Déplacement moteur (um) |
Angle (°) |
Angle (mrad) |
| 1 |
0.0005 |
0.05 |
0.000125 |
0.125 |
0.000021 |
0.00037 |
| 2000 |
1 |
1000 |
0.25 |
250 |
0.043 |
0.74 |
| 20 |
0.01 |
1 |
0.0025 |
2.5 |
0.00043 |
0.0074 |
| 8000 |
4 |
400 |
1 |
1000 |
0.17 |
2.98 |
| 8 |
0.004 |
0.4 |
0.001 |
1 |
0.00017 |
0.00298 |
| 46919.21 |
23.46 |
2345.96 |
5.86 |
5864.9 |
1 |
17.45 |
| 2688 |
1.344 |
134.4 |
0.34 |
336 |
0.057 |
1 |
|
| Attachment 1: Conversion_mm_avec_angle_de_rotation_solenoide.pdf
|
|
188
|
Thu Nov 25 17:07:29 2021 |
Entered by Super Team from 134.158.195.142 on Thu Nov 25 17:07:16 2021 | Fixed | Linac | Linac Commissionning |
|
Contrôle terminé | |
|
|
185
|
Thu Nov 25 15:01:54 2021 |
Entered by Super Team from 134.158.195.142 on Thu Nov 25 15:01:41 2021 | Under Process | Linac | Linac Commissionning |
|
Contrôle Radioprotection | |
Les controles radioprotection ont commencé vers 14h50
Paramètres faisceau : 100 - 110 pC de charge, E=50 MeV et 10 Hz |
|
893
|
Tue Jul 30 10:17:06 2024 |
M.O, M ELK, Hayg, Slava | Under Process | Shift summary | LI | RF D1 |
|
Conditionnement section SC/ME/MO/VK/HG | |
signaux RF mesurés :
avec Oscillo :
orange : reflechi section Prs
violet: incident section Pis
vert: refléchi Klystron Prk
jaune : incident Klystron Pik
avec la carte Redpitaya:
vert : puissance transmise dans la charge fin de section Pchargesection
rouge : puissance reflechi section Prs
blue: puissance incidente section Pis
NB: Pression SF6 2.4 bar à reajuster
Le passage de 10Hz à 25 Hz => Puissance moyenne (25Hz) = puissance moyenne (10Hz) X 2.5
*** Passage à 25Hz & 1µs
Au Demmarage Mettre att. sec 10 dB et faire augmenter la HT en douceur de 1000 V jusqu'à (Alim 1215 V & 289 kV ==> Pik=33 MW)
Puis Faire baisser att. sec en douceur : ci-dessous quelques points de mesures
11h16 : att. sec 3 dB (Pis=12 MW) 1µs & 25 Hz ==> vide in sec 4 10-9 mbar out section 1.5 10-9 mbar
11h20 : att. sec 2.5 dB (Pis=14 MW) 1µs & 25 Hz ==> vide in sec 3.7 10-9 mbar out section 1.4 10-9 mbar
11h25 : att. sec 2 dB (Pis=15 MW) 1µs & 25 Hz ==> vide in sec 3.7 10-9 mbar out section 1.4 10-9 mbar
11h30 : att. sec 1.5 dB (Pis=17 MW) 1µs & 25 Hz ==> vide in sec 3.7 10-9 mbar out section 1.4 10-9 mbar
11h35 : att. sec 1 dB (Pis=19 MW) 1µs & 25 Hz ==> vide in sec 6.9 10-9 mbar--> ? ca ne baisse pas out section 2.7 10-9 mbar --> ? ca ne baisse pas
12h 04 : att. sec 0.9 dB (Pis=20 MW) 1µs & 25 Hz ==> vide in sec 7.910-9 mbar--> ? ca ne baisse pas out section 3.8 10-9 mbar --> ?ca ne baisse pas
NB: la pompe en amont de la section passe de 1.2 10-9 mbar à 3.5 10-9 mbar
12h 12: att. sec 0.8 dB (Pis=20.5 MW) 1µs & 25 Hz ==> vide in sec 7.910-9 mbar--> ? out section 4.3 10-9 mbar --> ?
12h 20: att. sec 0.7 dB (Pis=21MW) 1µs & 25 Hz ==> vide in sec 7.9 10-9 mbar--> ? ca ne baisse pas out section 5 10-9 mbar-->? ca ne baisse pas
12h 30: att. sec 0.6 dB (Pis=21.5MW) 1µs & 25 Hz ==> vide in sec 7.7 10-9 mbar--> ? /out section 5.110-9 mbar --> ?
12h 35 : att. sec 0.5 dB (Pis=22 MW) 1µs & 25 Hz ==> vide in sec 7.3 10-9 mbar--> ? /out section 6.2 10-9 mbar --> ?
12h45 : att. sec 0.4 dB (Pis=22.5 MW) 1µs & 25 Hz ==> vide in sec 6.9 10-9 mbar--> ? /out section 5.9 10-9 mbar --> ?
13h00: att. sec 0.3 dB (Pis=23 MW) 1µs & 25 Hz ==> vide in sec 6.6 10-9 mbar--> ? /out section 7.4 10-9 mbar --> ?
13h10: att. sec 0.2 dB (Pis=23.5 MW) 1µs & 25 Hz ==> vide in sec 6 10-9 mbar --> ? /out section 6.7 10-9 mbar --> ?
13h30: att. sec 0.1 dB (Pis=24 MW) 1µs & 25 Hz ==> vide in sec 5.4 10-9 mbar-->4.9 10-9 mbar ? /out section 6 10-9 mbar --> 5.6 10-9 mbar ?
** 14h00 : passage à 3 µs et 25 Hz
Mettre att. sec 6 dB et passer à 3 µs
14h20: att. sec 5.5 dB (Pis=5.5 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8
14h25: att. sec 5.0 dB (Pis=7.8 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8
14h35: att. sec 4.5 dB (Pis=8.8 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8
14h49: att. sec 4.0 dB (Pis=9.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8
14h55: att. sec 3.5 dB (Pis=11.6 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8
15h11: att. sec 3.0 dB (Pis=12.4 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V5 jump)
15h37: att. sec 2.5 dB (Pis=13.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V4, V5 decrease. Out MP ? )
15h44: att. sec 2.0 dB (Pis=15.6 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V4, V5 small jump )
15h50: att. sec 1.5 dB (Pis=17.5 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V5 jump, V4 nothing )
15h56: att. sec 1.0 dB (Pis=19.7 MW) 3µs & 25 Hz ==> vide in sec V4 >= V5 > 10⁻8 (V4, V5 strong jump )
16:30 : interlock section
16h34: att. sec 1.2 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 (V4, V5 strong jump )
16h37 : Standby --> Acces casemate JN/GM pour recuperer watmetre
16h48: att. sec 1.1 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 (V4, V5 strong jump )
16h52 : Interlock machine
16h55: att. sec 1.0 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 > 10⁻8 (V4, V5 mieux que 15h56 )
17h : Interlock reseau
17:02 att. sec 0.9 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V5>V4 (V4, V5 stable)
petits tests :
17:04 att. sec 0.8 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V5>V4 (V4 : activités, V5 jump puis stable)
17:06 att. sec 0.7 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V5>V4 (idem )
17h10 : End apres un interlock machine
|
| Attachment 1: Vide_Screenshot_2024-07-30_17-13-24.png
|
 |
|
876
|
Thu Jun 6 08:29:19 2024 |
M EK, SC, ND, VC | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section 6/06 | |
8h20 : mise en chauffe de modulateur
start frigo et chiller section
Pression SF6 2.6 bar
3µs & 10 Hz att. section 16 dB claquages à différents alimentations :
10h claquage 3us 10 Hz 1150 V (Pik= 26 MW)
10h02 passage à 1100 V (Pik=20 Mw) 3 µs & 10 Hz
10h06 passage à 1120 V (Pik 22 MW) 3us &10Hz
claquage 10h08 remise à 1120 V 10h09
Remise en route 10h10 1120V
10h12 1120V reprise claquage
10h13 reprise 1120V
10h13 claquage
10h14 reprise
10h17 claquage
10h18 reprise
10h22 claquage
10h22 reprise
10h23 claquage
10h23 reprise
10h24 claquage
10h24 reprise
10h33 claquage
10h34 reprise
10h34 claquage
10h35 reprise
10h35 claquage
10h36 reprise
10h39 claquage
10h42 passage à 1090V (Pik=19 Mw), 3us_10Hz
10h43 claquage, attenauteur à 20dB
10h44 reprise à 1090V, 3us, 10Hz
10h50 passage à 12dB; 10dB, 9dB,
10h51 8dB, 7dB,
10h52 6dB,
10h53 claquage
10h54 reprise
11h00 4.5 dB
11h01 4dB
11h04 3.5 dB, 3dB
11h10 2.8dB, 2.7dB, 2.6dB, 2.1dB
11h14 1.8dB
11h15 1.5dB le vide augmente progressivement en entrée et en sortie
11h16 1 dB
11h19 0.4dB
11h20 0.2dB claquage
11h22 reprise 0.5dB
12:54 : On arrete : on est repassé à 35 MW, 1 µs, 10Hz Att atour de 1 ... 1.4 pour Habituer les guides à la puissance. en Moyenne on est autour de 20 MW de puissance pis dans la section.
ça claque à nouveau au alentours de 1.2 dB.
Operateurs: ND, MEK, VK
13:30 Redemarrage.
13:40 On atteint 1.4dB (apres un claquage a 1.6dB).
13:42Claquage. On remonte a 1.5dB puis 1.6dB (13h45)
14:04 Pik =35 MW att sec 1.7 dB 1us & 10 Hz (vide <4.e-9 mbar)
Ca claque...
14:30 On est a 2.1dB
14h38 On redescend...
passage progressif à 1.6dB
15h42 1.6dB
15h52 1.5dB
15H55 claquage ça repart
15h58 ca repart apres plusieurs claquages
16h01 ca repart après 1mn
17h arret machine
|
| Attachment 1: 1100V_3us_10Hz_attsec_16dB.png
|
 |
| Attachment 2: 1120V_3us_10Hz_attsec_16dB.png
|
 |
|
894
|
Wed Jul 31 09:58:14 2024 |
M.O, M ELK, Slava , Iryna | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section 31/07 | |
signaux RF mesurés :
avec Oscillo :
orange : reflechi section Prs
violet: incident section Pis
vert: refléchi Klystron Prk
jaune : incident Klystron Pik
avec la carte Redpitaya:
vert : puissance transmise dans la charge fin de section Pchargesection
rouge : puissance reflechi section Prs
blue: puissance incidente section Pis
Pression SF6 = 2.35 bar => JN a completer le remplissage pour réajuster la pression de SF6 pour la mettre à 2.5 bar
NB: vide sans HF @ 30 °C : in section 1.1 10-9 mbar & out section 1.2 10-9 mbar ==> vide milieu section devrait etre plus ( facteur 8 à 10) qu à l'entrée et sortie section
Suggestion: le splitter de puissance de la section est équipé en plus de deux ports de pompage additionnels DN40CF (voir image jointe ) ==> pour améliorer le pompage il va falloir rajouter au moins une pompe additionnelle à l'entrée de la section
**** reprise de conditionnement @ 3µs & 25 Hz
Mettre att. Sec à 10 dB et augmenter la HT progressivement et en douceur jusqu'à Alim 1215 V & HT=288 kV (Pik =33 MW)
Puis faire baisser att. sec en douceur
10h30 : att.sec 6 dB (Pis=6MW) ==> vide in section 5.5 10-9 mbar & vide out section 1.3 10-9 mbar
10h45: att. sec 5.5 dB (Pis=7 MW) ==> vide in section 5.5 10-9 mbar & vide out section 1.3 10-9 mbar
10h50: att. sec 5 dB (Pis=7.8 MW) ==> vide in section 5.5 10-9 mbar & vide out section 1.3 10-9 mbar
11h00: att. sec 4.5 dB (Pis=8.7 MW) ==> vide in section 5.5 10-9 mbar & vide out section 1.3 10-9 mbar
11h05: att. sec 4 dB (Pis=9.8 MW) ==> vide in section 5.6 10-9 mbar & vide out section 1.3 10-9 mbar
11h10: att. sec 3.5 dB (Pis=11 MW) ==> vide in section 5.7 10-9 mbar & vide out section 1.3 10-9 mbar
11h15: att. sec 3 dB (Pis=12.4 MW) ==> vide in section 7.4 10-9 mbar & vide out section 2.3 10-9 mbar
11h 25: att. sec 2.5 dB (Pis=13.9 MW) ==> vide in section 6.2 10-9 mbar & vide out section 1.8 10-9 mbar
11h 35: att. sec 2 dB (Pis=15.6 MW) ==> vide in section 6.2 10-9 mbar & vide out section 1.8 10-9 mbar
11h 45: att. sec 1.5 dB (Pis=17.5 MW) ==> vide in section 6 10-9 mbar & vide out section 1.5 10-9 mbar
11h 50: att. sec 1 dB (Pis=19.6 MW) : au début le vide monte ==> @ 13H15 vide in section 1.3 10-8 mbar & vide out section 1 10-8 mbar
13h20: coupure HF sans aucun reflechi visible sur le scope (interlock machine)
@ 14h00 vide in section 1.2 10-8 mbar & vide out section 9 10-9 mbar
* Faire durer le conditionnement entre att. sec 1 dB (Pis=19.6 MW) et 0.1 dB (Pis=24 MW) pour voir l'évolution du vide vs time
* faire baisser l'attenuation de 0.1 dB
14h00 : att. sec 0.9 dB (Pis=20 MW) ==> Vide démarre : in section à 1.3 10-8 mbar & vide out section à 1.3 10-8 mbar ==> @15h00: vide in section 1.3-1.4 10-8 mbar & vide out section 1.3 10-8 mbar
14h52 : att. sec 0.9 dB (Pis=20 MW) Breakdown in the section (screenshot)
15h07 : Interlock machine
15h10 : att. sec 0.8 dB (Pis=20.6 MW) ==> Vide démarre : in section à 1.3-1.4 10-8 mbar & vide out section 1.3 10-8 mbar ==> @16h10 : vide in section 1.4 10-8 mbar & vide out section 1.5 10-8 mbar
16h10 : att. sec 0.7 dB (Pis= 21MW) ==> Vide démarre : in section à 1.4 10-8 mbar & vide out section 1.6 10-8 mbar ==> @17h00 : vide in section 1.310-8 mbar mbar & vide out section 1.6 10-8 mbar
17h30 Stop the shift |
| Attachment 1: image_de_splitter_.png
|
 |
| Attachment 2: breakdown_25Hz_3us_09dB_14h52.png
|
 |
|
871
|
Thu May 30 08:36:04 2024 |
MEK, ND, VC, | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section 30/05 |
|
08h30: set to stanby modulator
start frigo & chiller section
start cond. @ 2 dB ( Pis= 16 MW) @ 2µs & 5 Hz.
Baisse progressive de l'atténuation ( NB: claquages dans le réseau HF à partir de 1.5 dB ):
- Att. section @1.5 dB (Pis=18 MW) : claquage dans le réseau avant coupleur de mesure section: arrivée de signal incident Pis (vert) perturbé dans la section==> cohérence entre deux signaux Pis(vert) et Pcharge (violet) ==> pas de refelechi section (orange), voir image ci_jointe)
- Att. section @1.1 dB (Pis=20 MW) ==> RF breakdown réseau HF avant coupleur mesure ( pas de réflechi section "orange" voir image jointe ==> niveau de vide 1.5 e-8 mbar
11:59 Cela claque des que l'on redemarre... Petite attente... Puis cela repars
passage du témoin
12h55 1.9dB 5Hz 2µs on attend un peu car ça claque à 0.9dB
12h57 1dB
13h02 claquage ça repart
13H08 claquage ça repart
13h10 claquage repasse à 2dB
13h10 claquage ça repart
13h14 claquage ça repart
13h26 claquage ça repart
13h29 claquage ça repart
13h33 passage à 1.5dB
13h40 passage à 1dB
13h42 claquage ça repart
13h44 claquage passage à 1.5dB
13h55 passage à 1dB
14h02 claquage ça repart
14h08 claquage passage à 1.5dB
14h11 claquage ça repart
14h12 claquage ça repart
14h22 claquage passage à 2dB
14h25 passage à 1.5dB
14h34 passage à 1dB
14h37 claquage passage à 1.5dB
14h41 claquage ça repart
14h47 claquage ça repart
14h49 claquage passage à 2dB
14h49 claquage ça repart
15h07 claquage ça repart
15h09 claquage ça repart
15h22 claquage ça repart
15h24 claquage ça repart
15h32 claquage ça repart
15h35 claquage ça repart (vide < 1e8mbar)
15h41 claquage ça repart
15h44 claquage ça repart
15h49 claquage ça repart
15h51 claquage ça repart
16h00 passage à 1.5dB*
16h20 essai à 1dB (Kevin requierement) claquage retour à 2dB
divers tests.... (mesure à l'oeil du réfléchi klystron)
16h44 passage à 1.7dB
16h48 claquage ça repart (difficilement)
17h11 claquage ça repart
17h19 claquage ça repart
17h24 claquage ça repart
|
| Attachment 1: 1.5_dB_2µs_5Hz_RF_breakdown.png
|
 |
| Attachment 2: 1.1dB_2µs_5Hz_RF_breakdown_réseau_HF.png
|
 |
|
892
|
Mon Jul 29 09:34:57 2024 |
M ELK, Slava, Iryna, Hayg | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section 29/07 | |
signaux RF mesurés :
avec Oscillo :
orange : reflechi section Prs
violet: incident section Pis
vert: refléchi Klystron Prk
jaune : incident Klystron Pik
avec la carte Redpitaya:
vert : puissance transmise dans la charge fin de section Pchargesection
rouge : puissance reflechi section Prs
blue: puissance incidente section Pis
Reprise de conditionnement à 3µs & 10Hz entre 1dB (Pis=19.6 MW ) et 0.1 dB (Pis=24 MW)
NB: intervention de groupe de vide : pour faire un test fermeture de la vanne de sortie par exemple . sa fermeture n'a aucun impact sur le pompage ==> on a décidé de laisser les vannes ouvertes.Selon Bruno il faut du temps pour le pompage
12h13: att sec 0.8 dB (20.5MW)
12h20: att sec 0.7 dB (21MW) ==> niveau de vide entrée 1.2 10-8 mbar, niveau de videsortie 1.3 10-8 mbar
12h 30: att sec 0.6 dB (21.5MW) ==> niveau de vide entrée section 1.1 10-8 mbar niveau vide sortie section 1.4 10-8 mbar
12h 37: att sec 0.6dB (21.5MW) claquage section (reflechi section signal orange) voir image saved
mettre att. sec à 1dB puis trig et faire baisser l'attenuation de 0.05dB (0.25 MW)
12h40: att. sec 0.6dB (21.5MW)
12h50: att. sec 0.55dB (21.8MW)
13h00: att. sec 0.5dB (22MW)
Due to the internet problem lost the information written between 13h and 15h. In summary, stable operation for 0.5 dB -> 0.3 dB
15:15 : 0.3 dB -> 0.2 dB idem
15:19 : 0.2 dB several breakdowns (see screenshot)
15:23 : 0.2 dB -> 0.5 dB
15:30 : Starting to decrease the attenuation towards 0.1 dB: -> 0.4 dB -> 0.3 dB-> 0.2 dB
15:35 : 0.2 dB 2 breakdowns (see screenshot) -> 0.3 dB
15:50 : 0.2 dB one breakdown
15:57 : 0.2 dB one breakdown
15:58 : 0.3 dB
16:08 : 0.3 dB two breakdowns
16:10 : 0.3 dB breakdown section
16:13 : several breakdowns section 0.3 dB: -> 1 dB
Waiting until vacuum will stabilize
NB: pb de pompage : pompage est lent. Le pompage le section RI n'est pas efficace à des niveaux de haute puissances.
17 h27 passage à 25Hz & 3us pour voir le dégasage
att. sec 4 dB (Pis=10MW)
|
| Attachment 1: Interlock_Sec_0.2dB_10Hz_3µs_15_19.png
|
 |
| Attachment 2: Interlock_Sec_0.2dB_10Hz_3µs_15_35.png
|
 |
|
870
|
Wed May 29 08:47:44 2024 |
M EK, KD, DN, HG | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section 29/05 | |
8h45: set to standby Modulateur
start Frigo et chiller section
start cond. @ 1.4 dB ( Pis=18 MW) @1µs & 5Hz vide <1.3 e-8 mbar
baisse de l'atténuation progressive jusqu'à 1 dB ==>interlock en amont de la section càd avant coupleur ( déformation signal Pis)
@ 0.7 dB (Pis=21 Mw) 1µs & 5Hz interlock avant coupleur
Problème de réflechis (pas de signal)
11h: intervention dans la casemate ==> le cable du réfléchis est défectueux au niveau du connecteur. ==> Changement du connecteur du réfléchis
11h40: reprise du conditionnement le signal réfléchis est OK sur l'oscilloscope
12h: On descend pour eliminer le réfléchis (claquage à 0.3dB)
12h14: 0.6dB, 1us, 5Hz, ça tiens, toujours le refléchis assez haut, mais pas d'effet sur le vide.
12h16: pas d'intelock depuis 2min, on descend 0.5dB
12h26: pas d'intelock depuis 2min, on descend 0.4dB
12h28 : pas d'intelock depuis 2min, on descend 0.3dB, ca claque un peu mais la tension se rétablis bien
12h45: passage à 0.15dB pour finir de nettoyer
12h47: retour à 0.3dB
12h49: pas d'intelock depuis 2min, on descend 0.2dB, 1us, 5Hz
13h15 passage @ 2µs & 5Hz ==> start cond. à 4 dB et baisse progressive de l'atténuation
14h05 passage @ 1.8dB
14h25 passage @ 1.7dB : jump vide, et trop d'interlocks
14h35 passage @ 1.9dB
15h05 passage @ 1.8dB
15h25 passage @ 1.7dB : jump vide
16h05 diminue attenuation par pas de 0.1 jusqu'à 1.2dB : jump vide par step mais ok
16h10 passage @ 1.1dB : vide à l'arriere dépasse celui a l'avant, plusieurs claquages aussi
16h45 passage @ 1.0dB : souvent des réfléchis, ce qui donne à réfléchir ... on passe d'ailleurs à 1.1dB
17:30 fin
|
| Attachment 1: 1dB_1us_5Hz_interlock.png
|
 |
|
869
|
Tue May 28 09:30:48 2024 |
MEC,SC, MO, RC | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section 28/05 | |
8h30 : Set to standby modulator
Vérification des cables de chaines de mesures : constat un pb au niveau de masse de cable de la charge fin section => connecteur de cable à reparer dans la casemate
Changement de l'atténuation du signal réfléchis 5dB ==> 6dB
Démarrage cond. @ 2 dB @ 3 µs & 1Hz ==> baisse progressive de l'atténuation
reflechi section bruité 1.3 dB puis d'un coup redevient plat (signal orange).
@ 0.9 dB ( Pis=21 MW) c'est stable .
12h: repise (KD)
0.9dB mais claque, donc aller retour entre 0.9dB et 1.1dB
passage rapide à 5Hz, 1dB, 3us, ca tiens et ça vie. Bon conditionnement, plus de réfléchi !
12h13 : 0.8dB, 1Hz, 3us, quelques claquage, mais pas d'évolution des signaux réfléchis et vide (le réfléchis s'améliore de plus en plus).
12h20 : 0.7dB
12h22 : 0.6dB, quelques claquage mais la tension peut être rétablis tout de suite
12h40 : 0.5dB, ca tiens, ca travail au niveau de la charge
13h01 : passage à 0.4dB car pas de progrès, il y a un point qui fait claquer, comme avant : ca claque mais la tension se rétablis bien
beaucoup d'activité sur le réfléchis on patiente à 0.4dB
13h26 : ça tiens et les signaux réfléchis sont de nouveau ~OK
13h40: cond. 1µs & 5Hz ==> démarrage à 4 dB baisse de l'atténuation de 0.5 dB au début jusquà 1.5 dB (18 MW) .
14h30: clacquage à 1.5 dB on reconditionne à 2 dB
15h15: cond. difficile de franchir 1.5 dB ( Pis= 18 MW ) à 1 uS et 5 Hz passage à 0.5 uS/ 5Hz à 1.5 dB
Modulateur prend probablement en compte le réflechi de la section avec ses pics transitoires ==> possible que ces pics transitoires à des hautes puissances induisent une coupure HF==> absence de circulateur coté section
Solution :
option1 : utiliser un switch avec un temps de montée et descente plus long ( autour de 100 ns)
option 2: envoyer un signal filtré au modulateur pour atténuer les pics transitoires
on arrive à 0.2 dB (Pis=25 MW) @0.5 µs & 5Hz
repassage à 1µs & 5Hz @1.4 dB avec un niveau de vide 1.3 e-8 mbar
|
| Attachment 1: scope_0.9dB_3us_1Hz_11h28.png
|
 |
| Attachment 2: capture_zoom_vide_0.9dB_3us_1Hz.png
|
 |
| Attachment 3: 1dB_3us_1Hz.png
|
 |
| Attachment 4: 0_6dB_3us_1Hz.png
|
 |
|
891
|
Fri Jul 26 10:12:42 2024 |
M.O, M ELK , Iryna, Hayg | Not Fixed | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section 26/07 | |
signaux RF mesurés :
avec Oscillo :
orange : reflechi section Prs
violet: incident section Pis
vert: refléchi Klystron Prk
jaune : incident Klystron Pik
avec la carte Redpitaya:
vert : puissance transmise dans la charge fin de section Pchargesection
rouge : puissance reflechi section Prs
blue: puissance incidente section Pis
Reprise de conditionnement autour de att sec = 0.1 dB @ 3 µs et 10 Hz
* Mettre attenuation section @ 10 dB et faire augmenter la HT progressievement et en douceur jusqu à (alim 1215 V & HT 288 kV correspondant à Pik=33 MW)
pb de pompage probabalement volume trés grand (pompage outside section):
mise en standby 10h55 : intervention de groupe vide pour voir si on peut améliorer le pompage en faisant le réglage de paramètre de la pompe ou fermer les deux vannes entrée et sortie section.
MPS interdit la fermeture des deux vannes ===> contacter Noureddine par émail et téléphone ( télétravail) pour une intervention
11:05 redemarrage HF
att section 1dB ==> vide <1.2 10-8 mbar
11h33 att sec 0.8 dB (Pis=20.5 MW) ==>vide in section =1.3 10-8 mbar , vide out section 1.2 10-8 mbar
11h38 att sec 0.7 dB (Pis=21 MW) ==>11h41 : claquage section avec pic vide
11h45 att sec 0.5 dB (Pis=22 MW) ==> vide <1.3 10-8
11h51 att sec 0.4 dB (Pis=22.5 MW) ==> vide <1.4 10-8
11h56 att sec 0.3 dB (Pis=23 MW) ==> claquage section ==> pic vide @11h57 (image saved)
12h05 att sec 0.1 dB (Pis=24 MW) ==> claquage dans section à 3µs revenir à 1µs , 2µs pour att. sec 0.1 dB voir si ca tient
13h10 intervention groupe vide dans la casemate ==>standby
14:30 : Beaucoup d'interlock au démarrage
14:30 : 3µs --> 1 µs
14:40 : 1µs --> 2 µs interlocks
14:40 : 2µs --> 1 µs -
15:06 : 1µs --> 2 µs.==> vide < 8.10-9 mbar
15:32 :coupure HF sans aucun signal réfléchi visible sur le scope , vide OK,
15h33 : 2 µs
16h34 : breakdown screenshot
16h41 : breakdown screenshot
16h56 : coupure HF sans aucun signal réfléchi visible sur le scope
17h15 : breakdown screenshot
17h15 : Stop for today
|
| Attachment 1: 0.1dB_2us_10Hz_16-41-51.png
|
 |
| Attachment 2: 0.1dB_2us_10Hz_16-34-07.pn
|
| Attachment 3: 0.1dB_2us_10Hz_17-15.png
|
 |
|
890
|
Thu Jul 25 09:15:25 2024 |
M ELK, SC, MO | Fixed | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section 25/07 | |
9h00 Mise en route modulateur
signaux RF mesurés :
avec Oscillo :
orange : reflechi section Prs
violet: incident section Pis
vert: refléchi Klystron Prk
jaune : incident Klystron Pik
avec la carte Redpitaya:
vert : puissance transmise dans la charge fin de section Pchargesection
rouge : puissance reflechi section Prs
blue: puissance incidente section Pis
*Reprise de conditionnement à 2 µs & 10 Hz autour de la puissance Pis=24 MW ( attenuation sect 0.1 dB)
- mettre attenuateur section @ 3 dB puis augmenter Pik progressivement et en douceur ( Alim de 1000V à 1215 V) pour atteindre Pik= 33 MW (Alim 1215V & HT 288 kV)
Faire baisser att sec de 3 dB à 0.1 dB
- 10h30 att sec 0.1 dB (Pis=24 MW) claquage dans sec @ 10h45 ==> pic vide
* Passage à 3 µs & 10 Hz @11H
-mettre att sec à 4 dB puis passer 3µs
- faire baisser att sec progressivement
- 11 h03 :att sec 3 dB ( Pis= 12 MW)
- 11h05: att sec 2.5 dB (Pis=14 MW ) ==> vide out sec 6.10-9 mbar & vide in sec 8.10-9 mbar
- 11h08 : att sec 2 dB (Pis=15.5MW ) ==> vide out sec 6.10-9 mbar & vide in sec 8.10-9 mbar
- 11h11 : att sec 1.5dB (Pis=17.5MW ) ==> vide out sec 6.10-9 mbar & vide in sec 8.10-9 mbar
- 11h15 : att sec 1 dB (Pis=19.5MW ) ==> vide 1.6 10-8 mbar
- 11h20 claquage in section à att sec 0.5 dB (Pis=22 MW)
- 11h 29 retour à att sec 1dB
- 11h45 att.sec 0.8 dB (Pis =20 MW) ==> vide <2.1 10-8 mbar
- 11h58 att.sec 0.7dB (Pis =21 MW) ==> vide <2.2 10-8 mbar
- 12h10 att.sec 0.6dB (Pis =21.5MW) ==> vide <2.2 10-8 mbar : claquage @12h11
- 12h32 att sec 0.7 dB (Pis=21 MW) ==> claquage et pic vide voir images saved
- 12h35 faire un sweep entre 1dB (Pis=19.5 MW) et 0.1 dB (Pis=24 MW) avec un pas de 0.05 dB ( automated conditionning) :
*claquage dans section @ 0.3 dB ==> pic vide
*claquage réseau HF @ 0.7 dB : reflechi Klystron uniquement voir image jointe
Arrêt à 13h23 pour vérifier SF6 ==> SF6 ok Pression 2.6 bar
14h00 att sec 0.6 dB claquage dans réseau (signal reflechi Klystron)
NB: Att sec 1.6 dB coupure HF modulateur se met en stand by ==>Intervention de Maher, message Klystron : defaut pompe ionique Klystron a entrainé le filament klystron à sa limite basse
Aprés redémarrage de klystron à 2 dB le filament est à la bonne valeur et ca recoupe HF toute de suite aprés ==>diagnostic: le courant de la pompe pompe ionique de klystron a passé à la limite haute (>4µA) . impossible de la redemarrer instantanément à la HT nominale (Alim 1215V & HT 288 kV).
En baissant la HT à 1000V le courant de la pompe baisse et faire augmenter HT progressivement jusquà la valeur nominale .
15h29 att sect 0.7 dB coupure HF sans aucun signal reflechi visisble sur le scope
15h30 redemarrage HF @ att sec 0.7 dB 15h42 coupure HF sans aucun signal reflechi visisble sur le scope
15h45 redémarrage HF ca coupe à 0.7 dB 15h48 sans aucun signal reflechi visisble sur le scope
15h50 redémarrage HF at 16h05 claquage dans section att. sec 0.3 dB (Pis= 23 MW) avec un pic de vide
16h07 redemarrage HF : att sec 0.4 dB ==> vide < 1.6 10-8 mbar
16h19 att sec 0.2 dB claquage section 16h21 avec pic vide
16h22 redémarrage HF claqauge @ att. sec 0.1 dB (Pis=24 MW) 16H30 avec pic vide
16h35 claquage dans réseau HF @ att . sec 0.3 dB (reflechi klystron uniquement "vert") voir image jointe
16h38 @ att . sec 1 dB ==> Klystron se met en off (aucun réflechi voir image jointe)
Arret de conditionnement 16h38
Intervention de Maher
L'interlock qui a mis off le modulateur c'est le courant filament klystron, limite basse, nous avons redémarré et nous avons eu interlock pompe ionique >4 uA
J'ai envoyé à SCANDINOVA pour prévenir ( 2 fois ) (Maher)
plusieurs claquage section, pb de pompage section ( il faut attendre un temps pour pouvoir remettre la HF ) conditionnement ( 3 us, 1200 V et att 0.1 dB ) |
| Attachment 1: 0.7_dB_3µs_10Hz__13h04__claquage_réseau_HF.png
|
 |
| Attachment 2: 0.3dB_3us_10Hz_16h35.png
|
 |
| Attachment 3: 1dB_3us_10Hz_16h38.png
|
 |
|
867
|
Fri May 24 08:21:49 2024 |
MEK , SC, Victor, Vincent | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Ring Commissioning |
|
Conditionnement section 24/05 | |
8h10: set to standby Modulateur
Démarrage Frigo et Chiller
8h30 - 9h : intervention de Kevin pour la remise de la chaussette de la clim avec Mohamed, remise en route de la clim à l'initial.
Démarrage cond. à att.section 2dB (Pis = 16 MW) 2µs et 1Hz et faire baisser progressivement l'atténuation à 0.65 dB (Pis=22 MW), niveau de vide autour de 1.2 e-8 mbar
13h: Changement opérateur Nicolas --> Kevin
Nicolas a mis une alarme sur l'état du modulateur pour avertir des changements (interlock, passage en trig, etc).
13h10: pas d'avancement, on descend doucement jusqu'à 0.2dB où ca commence à claquer (avant aucun changement sur les signaux, vide et RF). On travail un peu à 1us puis on repasse à 2us
13h13: essaie de passer à 2us, mais ne tiens pas, on repasse à 1us
13h18: le vide s'améliore, essaie de repasser à 2us, mais ne tiens pas, on repasse à 1us
13h20: après que le vide s'est amélioré, passage à 2us, 0.4dB (Pis=23MW), ca tient et ca travaille au niveau du vide
de 14H à 16H decsente de 0.55 à 0.45dB stable pendant plus de 5 min (sans breakdown)
de 16H à 17H30 passage à 3µs
de 10dB à 1.3dB (sans breack down pendant 5mn)
17h55 : 1.2 dB
18h01: 1.1dB, on vient de récupérer sur le signal réfléchi (sans interlock modulateur ^^)
18h06: claquage, RAZ du compteur
18h10: claquage, RAZ du compteur
18h14: gros claquage, on a reperdu le signal réfléchi :(, il est revenu après une second gros claquage à 18h20
18h25: le signal réfléchi est repartis et ca claque pas mal
18h40: on passe à 1dB ca claque pas mal. On récupère le réfléchis vers 18h48, comme précédemment claque toutes les 5 minutes ou presque
18h54: passage à 5Hz pour voir si la réccurence des 5minutes diminue, le vide à augmenté d'un facteur 3, après quelques claquage au début ça tiens environs 1 minute.
19h: On repasse à 1Hz après pas mal de claquage on retrouve la réccurence des 5minute
19h11: gros claquage, on retrouve de "belles" courbes de réfléchis :), mais ne dure pas à cause du claquage à 19h13
19h18: claquage, on essaye de descendre pour explorer la zone (~1min par point sans claquage).
Ca claque un peu, mais pas d'effet notable sur les niveau de vide ou l'activité.
19h40: à 0.4dB ca claque trop, arret de la phase et retour à 1dB pour voir si on a gagné
c'est bon ça tiens les 5minutes,
19h45: on arrête à 0.9dB
arrêt machine
|
| Attachment 1: 1_1dB_3us_1Hz.png
|
 |
| Attachment 2: Screenshot_1.6dB_3us_2024-05-24_17-05-27.png
|
 |
| Attachment 3: claquage_1_1dB_3us_1Hz.pdf
|
| Attachment 4: passage_5Hz_3us_1dB.pdf
|
|
888
|
Tue Jul 23 11:55:42 2024 |
MO, MELK, MJ | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section 23/07 | |
Reprise de conditionnement section 23/07 @ 10H30: largeur impulsion 0.5 µs @10 Hz ( voir images )
signaux RF mesurés :
avec Oscillo :
orange : reflechi section Prs
violet: incident section Pis
vert: refléchi Klystron Prk
jaune : incident Klystron Pik
avec la carte Redpitaya:
vert : puissance transmise dans la charge fin de section Pchargesection
rouge : puissance reflechi section Prs
blue: puissance incidente section Pis
* Mettre attenuation section 10 dB
* Augmenter Pik progressivement et en douceur jusqu'à sa valeur nominale Pik=33 MW ( Alim 1215 V & HT 288 kV)
* Puis faire baisser attenuation section de 10 dB progressivement et en douceur
*attenuation section 0.25 dB==> puissance incidente section Pis =23 MW ==> vide section <3.10-9 mbar
* attenuation 0.1 dB (24 MW)==> vide sortie section 2.5 .10-9 mbar et entrée section 4.6 10-9 mbar
12h00 : largeur 1µs @ 10 Hz
* augmenter attenuation section de 0.1 dB jusquà 10 dB progressivement puis on change la largeur de 0.5 à 1 µs ( Pik =33 MW)
* faire baisser attenuation section de 10 dB à 0.1 dB progressivement et en douceur
* 14h00 attenuation 0.1 dB (Pis= 24 MW)==> vide sortie section 7 .10-9 mbar et entrée section 6.10-9 mbar. A 14h03 ( 1 claquage dans la section ==>pic de vide ) voir image RF plots et Vide plots
* 14h13 attenuation 5 dB puis la faire baisser progressivement .
* 0.1 dB (Pis=24 MW) de 14h20 à 14h51 il ya un claquage dans la section aprés 30min==> pic vide entrée section (voir images) .
* 14H53 trig @ 0.1 dB . A 15H15 claquage dans la section (Pis=24 MW)==> pic de vide entrée section (voir images )
* Passage att sec @ 2 dB et trig à 15h16, Puis faire baisser l'atténuation progressivement jusquà 0.5 dB (Pis= 22 MW) 15H30.
* 16H att sec 0.25 dB (Pis=23 MW)
* 16H 22 att sec 0.1 dB (Pis=24 MW) jusqu à 16h 35 pas de claquage
NB: signal Pis anomale (amplitude et forme visualisé avec Oscillo ==> vers 16H15 changement de cable BNC défectueux => la forme et l'amplitude du signal Pis mesuré avec oscillo redevient correct et similaire à celui mesuré avec carte redpitaya (voir images jointes)
** Passage à la largeur d'impulsion 2µs_10Hz @16H35
*mettre attenuation à 10 dB puis passage à 2 µs & 10Hz
* faire baisser l'atténuation de 10 dB
* 16H45 att.sec 1.5 dB (Pis=17 MW)==>vide < 7.10-9 mbar
* 16h53 att. sec 1.3 dB (Pis=18 MW)==> vide < 8.10-9 mbar
* 17h00 att.sec 1 dB (Pis= 19.5 MW)===> vide entrée et sortie section monte à 1.4 10-8 mbar
*17h12 att.sec 0.8 dB ( Pis= 20.5 MW) ==> vide monte à (sortie sec à 1.6 10-8 mbar et entrée sec à 1.4 10-8 mbar )
* 17h17 att.sec 0.5 dB ( Pis= 22 MW) ==> vide monte à( sortie sec à 1.7 10-8 mbar et entrée sec à 1.3 10-8 mbar )
* 17h21 att.sec 0.3dB ( Pis= 23MW) ==> vide monte à (sortie sec à 1.6 10-8 mbar et entrée sec à 1.2 10-8 mbar)
* 17h 24 att.sec 0.1dB ( Pis= 24MW) ==> claquage dans la section à 17h28 ==> pic vide (voir images saved )
Arret de conditionnement à 17h30 et à reprendre jeudi
|
| Attachment 1: signaux_rf_scope.png
|
 |
| Attachment 2: signaux_RF_redpitaya_.png
|
 |
|
866
|
Thu May 23 08:19:19 2024 |
M EK, ND, Iryna, Victor | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section 23/05 | |
8h15: set to standby Modulateur
démarrage frigo et chiller section
la veille difficile de franchir 0.7 dB (Pis= 22 MW ) @2µs & 1Hz
retour à 1µs & 1Hz descente jusquà 0.2 dB correspondant à 25 MW ( pour éviter le bloquage du moteur de l'atténuateur)
démarrage cond. 2 dB @ 2µs & 1 Hz et redescente progressive de l'atténuation
interlock reflechi Klystron sachant au niveau de la section les puissances RF sont correctes
mise de l'atténuateur section à 12 dB et vérifier si interlock Klystron persite ==> confirmation de coupure HF ( renvoi Trig Off) à plusieurs niveaux d'alimentation de 1220 V jusqu'à 1000 V
intervention de Maher pour identifier le problème ==> pb software . Maher mise en marche en local ok et puis repassage en mode remote c'est ok à nouveau
12:56 Pause repas
13:30 resstart
We work @ 2µs & 1 Hz Goal: to go from 3 dB to 0.2 dB
Several interlocks at 1.5dB, 0.9dB, 0.6dB. Going up to 1.5 dB and then again to 0.6 dB
Breakdowns were originated probably in the RF network. Only few in the RF section.
Setting up the wawecatcher to monitor the charge with the ICT after the RF structure. During the shift, no signal was observed.
@0.6dB several breakdowns. Coming back to 1dB, still there are breakdowns. Set 1.5dB, then 2dB.
Reached 0.6dB for short time.
17:35 We stop at 1 dB. To be continued tomorrow. |