Entry   KD, M2 GI; shift du 10 novembre 2025 
Entry   KD MJ VM HG; shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X 
Entry   KD, HG, VM; Laser PC status Screenshot_from_2026-02-05_17-11-35.png
Entry   VM, MJ, DN, RC; Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir 7x
Entry   MJ, KD; MONOCHROMATEUR - 12 mars 2026 
Entry   MJ HG VK; Etudes de points MATCHING - 13 mars 2026 
Entry   MJ KD IC VM DN RC; ENERGY-ANGLE 70 MeV - 27 mars 2026 droma_70_MeV.png
Entry   KD MJ; shift du 31 mars 2026 : MONO 70 MeV + spectres 61.5 MeV Droma_61p5_MeV_2026-03-31_17-41-07.pngDectris_centre_faisceau_2026-03-31_17-19-05.png
Entry   Entered by Moutardier from 134.158.76.123 on Tue Dec 1 09:56:35 2020; Verrification pour le démarrage a blanc 
Entry   Entered by Maher OMEICH from 134.158.91.212 on Fri Jul 16 14:31:16 2021;  
Entry   Entered by Maher OMEICH from 134.158.91.212 on Wed Jul 21 17:51:56 2021; fonctionnement modulateur / HF 
Entry   Entered by mohamed el khaldi from 134.158.76.146 on Tue Jul 27 09:58:14 2021; tests non effectués à cause de modulateur qui se met off tout seul  
Entry   Entered by Maher OMEICH from 134.158.91.212 on Tue Jul 27 10:15:11 2021;  
Entry   Entered by Maher OMEICH from 134.158.91.212 on Tue Jul 27 10:20:02 2021;  
Entry   Entered by Maher OMEICH from 134.158.91.212 on Fri Jul 30 14:13:07 2021;  
Entry   Entered by Maher OMEICH from 134.158.91.212 on Tue Sep 7 12:08:31 2021;  
Entry   Entered by Maher OMEICH from 134.158.91.212 on Thu Sep 9 09:23:03 2021; intervention Scandinova 
Entry   Entered by Maher OMEICH from 134.158.91.212 on Mon Sep 20 10:55:19 2021; panne modulateur 
Entry   Entered by Alexandre Moutardier from 134.158.195.144 on Fri Oct 1 16:42:28 2021; Réglage timing RF/Laser 
Entry   Entered by Super Team from 134.158.195.142 on Mon Oct 18 11:26:41 2021; Shift condionnement RF : passage à 5Hz 