Entry   Entered by Super Team from 134.158.195.141 on Mon Oct 7 09:30:50 2024;  
Entry   Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 5 17:29:48 2024; Laser-cathode 
Entry   Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 12 10:36:24 2024; Salle laser ThomX 
Entry   Entered by Viktor Soskov from 134.158.195.153 on Thu Nov 14 09:21:36 2024; Etat laser 
Entry   VC; Frequence anneau et systeme de synchro 
Entry   VC MJ; Installation du PM dans la X-hucth 
Entry   Entered by Marie Jacquet from 134.158.205.16 on Tue Dec 17 23:26:26 2024; shift 17/12 - scan vert FPC - 50 MeV 6x
Entry   Entered by Viktor Soskov from 134.158.195.153 on Wed Dec 18 11:59:34 2024; Laser-cathode 
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Jan 16 11:57:39 2025; Resultats Tour de cle Q1-Q3 - Shift 15/01 Tour_de_cle_Q1Q3.png
Entry   MJ KD; align Q1Q3 et pt fonctionnement 61.5 MeV sst03_61_5MeV_2025-01-21_16-50-30.pngtbtsum_sansRF_61_5MeV.png
Entry   MJ HG;  Q_vs_SolenoScan_at_17-21-28.png
Entry   Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:25:13 2025; Etat laser 
Entry   Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:57:03 2025; Etat laser Avant.pngApres.png
Entry   VM, IC, ND; Measurements 18/4 Screenshot_from_2025-04-18_09-42-24.pnginjection_sequence_blank2ms_009.pnginjection_sequence_blank2ms_003.pnginjection_sequence_blank2ms_002.pnginjection_sequence_blank2ms_036.png
Entry   Entered by Marie Jacquet from 134.158.205.21 on Tue Sep 9 15:19:28 2025; X-rays - Recherche on-axis avec script fwhm - Prise de qq spectres - Mesure taille source 
Entry   HG, MJ; Quads scans Q3 et Q7 + Courbe energie vs Phase section 2025-09-17-Energie_vs_PhaseSection.pdf
Entry   KD, M2 GI; shift du 10 novembre 2025 
Entry   KD MJ VM HG; shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X 
Entry   KD, HG, VM; Laser PC status Screenshot_from_2026-02-05_17-11-35.png
Entry   VM, MJ, DN, RC; Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir 7x