ID Date Author Status Type Category Important Subjectdown Icon Text Attachments
  1203   Thu Mar 5 13:19:22 2026 MJ VM DN RC HG Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Etudes matching icon1.gif Mesures : Spectres et taille source
X + Quads scans associées, @
  
  1212   Sun Mar 15 18:42:53 2026 MJ HG VKFixedShift summaryLinac Commissionning | Ring Commissioning Etudes de points MATCHING - 13 mars 2026 Programme :
Etudes points Matching
==============================
  
  948   Tue Oct 29 10:31:45 2024 HG, SCUnder ProcessInfoLinac Commissionning Etude faisceau linac 9h30 : Mise en chauffe

10h31 : mise en route faisceau

On se place à 0 dB,
 Soleno_Align_noCol1.png 
  961   Thu Nov 14 09:21:51 2024 Entered by Viktor Soskov from 134.158.195.153 on Thu Nov 14 09:21:36 2024FixedInfoLaser Etat laser Bonjour, rien n'a change au faisceau
laser (distribution reste le meme,l'energie
sur la cathode =60mkJ, Iris = 1.3mm, Att
  
  1036   Thu Mar 13 11:25:29 2025 Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:25:13 2025FixedLinacLaser Etat laser Bonjour, le parcours optique a ete realigne.

L'enegie UV sur la cathode
= 48uJ , Iris = 1.3mm, Att = 410
  
  1037   Thu Mar 13 11:57:19 2025 Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:57:03 2025FixedInfoLaser Etat laser Voici les distibutions UV laser sur lacathode
avant et apres l'alignement
 Avant.pngApres.png 
  151   Mon Nov 8 09:21:48 2021 Entered by sophie chance from 134.158.195.141 on Mon Nov 8 09:21:32 2021Under ProcessInfoDiag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning Etat des lieux  SC et AM

Fermeture des sous-sols et de la
crinoline
  
  472   Tue Jun 7 09:53:01 2022 Entered by ND/JNC/VC/VS/MO/SC from 134.158.195.141 on Tue Jun 7 09:52:47 2022Under ProcessLinacLinac Commissionning Etat des lieux Presents: SC, ND, JNC, VS, MO

Fermeture casemate

Tests des DSs en cours
  
  720   Mon Mar 27 13:55:41 2023 Entered by Super Team from 134.158.195.141 on Mon Mar 27 13:55:24 2023Under ProcessInfoLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Etat ThomX  Cavité FP a terminé son intervention

Mise sous vide possible cette après-midi

14h Intervention IHM cavité
  
  804   Tue Oct 10 13:47:16 2023 MJ KD Shift summaryLinac Commissionning | Ring Commissioning Essai de validation synchro electron / laserFPC ** 500.25 MHz anneau

** laser locke tres instable

** Vers 13h : IP retrouvee
 2023-10-10_14-21-43.png2023-10-10_17-38-46.png 
  148   Fri Oct 29 15:58:58 2021 Entered by Super Team from 134.158.195.142 on Fri Oct 29 15:58:45 2021Not FixedLinacLinac Commissionning Erreur DS CALC sur terminal Message apparu dans un terminal après
avoir lancé ipython create_DS_Att_Deph_write.py


Le moteur sur l'IHM
  
  Draft   Fri Oct 29 15:56:01 2021 Entered by Super Team from 134.158.195.142 on Fri Oct 29 15:55:48 2021Under ProcessQuestion  Erreur DS CALC 

 

alexandre.moutardier@client3:~/git/panneaux/PlateformeIHMThomX$
  
  171   Thu Nov 18 18:39:18 2021 Entered by Hayg Guler from 134.158.195.141 on Thu Nov 18 18:39:04 2021Under ProcessShift summaryLinac Commissionning Energies avant section pour différents gradients  Methode : 

on utilise le steerer LI/PS/STR01-V01
et les mesures sont faites sur le Yag de
  
  1208   Wed Mar 11 18:12:23 2026 Entered by Super Team from 127.0.0.1 on Wed Mar 11 18:12:09 2026Under ProcessShift summaryLI Emittance vs Iris Some Quad scans with variying the Iris
opening.

Data :
  
  1136   Mon Oct 13 13:40:05 2025 HaygUnder ProcessInfoLinac Commissionning Emittance QP3  QP3 scan

vary Soleno
Iris 1mm ATT 400 (150 pC)
  
  1085   Tue Jun 10 18:39:54 2025 SC, HGUnder ProcessShift summaryLI | TL Emittance + data taking  phi max :  220 deg Qmax = 120 pC

Laser new position : 4.714
/ 3.524
 Emittance_QP7_phiS_222.pngEmittance_QP7_phiS_220.pngEmittance_QP7.pngEmittance_QP3.png 
  768   Tue Jun 13 15:27:35 2023 ND, RCNew SolutionInfoLaser Effet eclairage sur detecteurs RX Effet de l'eclairage dans la casemate
sur les detecteurs a RX (lumiere eteinte
a 15:26:40) => il faut fonctionner avec
 Screenshot_from_2023-06-13_15-27-06.png 
  764   Tue Jun 13 13:51:05 2023 SC, NDNew SolutionInfoLI Effet changement de phase RF Canon sur TL/BPM.02 Quelques changements de phase canon. On
voit que quand l'orbite derive vers des
valeurs negatives sur Tl/BPM.02/SpX le fait
 Screenshot_from_2023-06-13_13-50-23.png 
  1231   Wed Apr 15 08:04:29 2026 KD MJ RC DN VKUnder ProcessShift summaryLinac Commissionning | Ring Commissioning ENERGY/ANGLE 40 MeV - 15 avril 2026 8h05: mise en chauffe à distance
(frigo/chillers, modulateur, laser, cyclage)

***
  
  1220   Fri Mar 27 07:41:15 2026 MJ KD IC VM DN RCFixedShift summaryOpt | Linac Commissionning | Ring Commissioning ENERGY-ANGLE 70 MeV - 27 mars 2026 **
Programme : Energy-Angle 70 MeV

7h40 : mise en chauffe en
 droma_70_MeV.png 