| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
|
717
|
Fri Mar 17 08:55:42 2023 |
IC, VM, VK, ND | | Shift summary | Ring Commissioning |
|
RIng commissioning | |
8:50 Mise en chauffe
10h Starting the beam
Tuning of the TL
We started from the last Friday setting and the beam storage was not succefull.
Optimization of the storage. The RF freq was set to 500.424 MHz. RF voltage was 40-100 kV
After several optimizations, the good storage was obtained ~15h
The final RF freq 500.4099 MHz
The data was taken concerning the betatron oscillations. Should be analysed offline.
16h40 Shift finished.
|
|
718
|
Thu Mar 23 15:15:56 2023 |
SC | Under Process | Problem | CC |
|
Tests CC apres re-démarrage | |
15h16 redémarrage de client 3
Problème avec le commutateur de la baie en salle de controle (celui qui gère les badges), action en cours pour le changer, Nouveau commutateur : thomx baie38-3, RES505
Client 1 ok
Client 2 ok
Client 3 ok
Client 4 ok
Client 5 ok
15h48 : Automate de la baie 5 ne redémarre pas
16h27 : Toujours pas d'automate dans la baie 5
ticket envoyé à CC pour savoir comment on fait quand le ping de automate-b5.thomx.fr donne un Destination Host Unreachable
16h50 Re-démarrage des serveurs pour essayer de relancer l'automate et arret des diags
17h25 Toujours pas d'automate b5, diags à l'arret
A suivre demain |
|
719
|
Fri Mar 24 08:52:49 2023 |
SC/JNC/VC | Under Process | Problem | CC |
|
Redémarrage ThomX | |
8h53 Serveur DNS et DHCP non redémarré, ping ne fonctionne pas, en attente d'une solution
Re-démarrage automate et cpci (JNC)
14h13 ping sur automate ok
15H
er/sy/rac.17-elr.01-rdp.03 dans IHM healthckeck remarrage impossible .. dans astor
Remise en route synchro et camera (ND)
Re-démarrage de tout dans astor
Reste à regarder : er/sy/rac.14-elr.01-rdp.03 en server off qui refuse de se mettre on
Allumer le laser photocathode.
pompage vide pompe ionique prévu pour lundi, pas de faisceau lundi. |
|
720
|
Mon Mar 27 13:55:41 2023 |
Entered by Super Team from 134.158.195.141 on Mon Mar 27 13:55:24 2023 | Under Process | Info | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Etat ThomX | |
Cavité FP a terminé son intervention
Mise sous vide possible cette après-midi
14h Intervention IHM cavité RF
14h04 Fermeture casemate
Interruption possible pour mettre demi-anneau sous vide
Etude IHM cavité RF en cours (PG, ME)
14h45 Mise sous vide demi anneau, ouverture casemate
16h Fin d'intervention du vide, pompage turbo en cours
|
|
721
|
Wed Mar 29 13:35:25 2023 |
MJ | | Problem | Linac Commissionning |
|
ICT1 ?? | |
demarrage vers 13h
Pb de vide depuis une demi-heure (MV-1 rouge sur le pss) Bruno est venu + Nourredine tel
pb resolu
ICT 1 ne fonctionne pas
ICT1 re fonctionne , par contre pB moyennaage et std DS mean std ne fonctionne pas bien?
|
|
722
|
Thu Mar 30 09:34:24 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 09:34:11 2023 | | Shift summary | Linac Commissionning |
|
Nouvelle position laser/cathode (du 29 mars) | |
Nouvelle position laser/cathode du 29 mars : x=4.91mm / y=2.40mm |
|
723
|
Thu Mar 30 13:35:13 2023 |
Entered by SC from 134.158.195.141 on Thu Mar 30 13:34:57 2023 | Under Process | Linac | Linac Commissionning |
|
Faisceau Linac | |
14h38 : Démarrage faisceau linac
Modulateur 1090V, Position laser horizontale 4.910 mm et verticale 2.40 mm
Iris 1.3 mm
Attenuation laser = 344
Attenuation canon RF = 0.0 dB et Attenuation section = 1.50 dB
temperature consigne canon = 31.50° et temperature consigne section = 29°
Sans solénoide, Phase de charge max = 204 donnée par le scan charge phase du DS, on ne voit pas le faisceau à cette phase, en focalisant le faisceau pour le voir sur l'écran on est dans une gamme de phase allant de 209 à 216
Charge 124 pC
Arret faisceau
Détection de fuite pour le vide en cours
|
|
724
|
Thu Mar 30 17:20:43 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 17:20:29 2023 | | Shift summary | Linac Commissionning |
|
| |
Shift ce matin
** YagTL1 vs soleno avec alignement a la Kev ou a la Hayg (mais chaque fois aligne dans Q1-Q3). --> trajet dans la LIL differents - Mesures avec soustraction courant obscurite (df la pj)
** pour Sol=180A, taille sur YAG 1 pour plusieurs str1 ---> taille horix sur YAGTL1 varie de 0.2 a 0.8 (cf la pj)
Meme si le passage dans la LIL avec des desalignement differents a un effet, ca n'explique toujours pas le desaccord data/simul ASTRA ...
Fin de shift vers 13h |
|
725
|
Fri Mar 31 10:11:40 2023 |
Entered by Super Team from 134.158.195.141 on Fri Mar 31 10:11:25 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | |
10h12 Démarrage modulateur et refroidissement
Lancement de l'archivage
11h05 Fermeture casemate
Config linac sur le MPS, pas possible la config LI-TL-LE manque le volume vide V6 du MPS pour cette configuration
11h17 Fermeture casemate et Démarrage faisceau
Scan charge phase phase charge max donnée par script = 219 degres, charge max = 112 pC
Position laser PosX = 4.910 et PosY = 2.400 sur feedback position
Modulateur HV = 1090V, attenuation canon = 0.0 dB et attenuation section = 1.50 dB
Le faisceau est plutot instable en intensité, il disparait et ré-apparait
Max de foc à phi = 223 degres, zone de faisceau visible entre 217 et 223 degres
Mesure phase - énergie canon avec soleno foc en cours.
13h00 Arret du faisceau - pause repas
14h20 Reprise
Mesure phase energie section
17h Arret machine |
|
726
|
Fri Mar 31 10:44:31 2023 |
Entered by Super Team from 134.158.195.141 on Fri Mar 31 10:11:25 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | |
Qui me pique internet ?
Et m'éfface le elog ? |
|
727
|
Tue Apr 4 12:13:18 2023 |
MJ KD | Under Process | Shift summary | LI | TL | LE | Linac Commissionning |
|
shift du 04 avril 2023 | |
12h10: Mise en chauffe modulateur, laser et chiller + PA
14h30: mesure phase relative sortie pilote/ sortie PA Vrms pilote, Vrms PA Sans HT dans le Klystron
s'il vous plait, Indiquez l'heure du passage sous haute tension (pour voir si cela change quelque chose à aux mesures RF) MERCI
15h03 modulateur trig
Wave catchers arretes soft - Vincent les a redemarre (c'etait pareil la semaine derniere, Y-a-t-il qqun qui les arretent ?
|
|
Draft
|
Tue Apr 4 15:21:51 2023 |
| | | |
|
, entered from 134.158.195.141 | |
<p>12h10: Mise en chauffe modulateur, laser et chiller + PA</p>
<p>14h30: mesure phase relative sortie pilote/ sortie PA Vrms pilote, Vrms PA <strong>Sans HT dans le Klystron</strong></p>
<p>s'il vous plait, Indiquez l'heure du passage sous haute tension (pour voir si cela change quelque chose à aux mesures RF) MERCI</p>
<p>15h03 modulateur trig</p>
<p>Wave catchers arretes soft - Vincent les a redemarre (c'est la 2eme fois) Est-vr</p>
<p> </p>
<p> </p> |
|
729
|
Thu Apr 6 12:57:29 2023 |
Entered by Super Team from 134.158.195.141 on Thu Apr 6 12:57:15 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | |
12h57 Mise en chauffe modulateur et refroiddissement canon et section
Vide dans l'anneau de l'ordre de 10-8
Mise en route faisceau
Phase charge max = 66, charge = 103 pC, iris 1.3mm, HT = 1090V, attenuation laser = 330, Attenuation canon = 0 dB, attenuation section = 1.5 dB
17h34 Arret faisceau
|
|
730
|
Fri Apr 7 13:48:55 2023 |
Entered by Super Team from 134.158.195.141 on Fri Apr 7 13:42:08 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | |
Programme :
- Mesure Energie apres section en fonction de la phase avec steerer sur TL/SST.01
- Mesure Energie apres section en fonction de la phase avec dipole sur TL/SST2
Mise en route laser + RF
Scan Charge Phase , phase charge max = 60 degres, Charge max = 98 pC
LI/PS/STR.01-H.01 = -2A
LI/PS/STR.01-V.01 = 0.5A
Attenuation section = 1.5 dB et HT modulateur = 1090V
15h40 le faisceau a changé de forme sur écran YAG TL/DG/SST.01 pendant la mesure au steerer
17h02 Arret faisceau
|
|
731
|
Tue Apr 11 12:59:18 2023 |
Entered by Super Team from 134.158.195.141 on Tue Apr 11 12:59:03 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | |
13h : Mise en chauffe modulateur et refroidissement
14h34 Faisceau, HT = 1090V, HoPoslaser = 5.039, vertposlaser = 2.291, attenuation canon = 0.0 dB et attenuation section = 1.77 dB
Phaes charge max = 53 degres, Qmax = 74 pC
|
|
732
|
Tue Apr 11 15:38:34 2023 |
Entered by Super Team from 134.158.195.141 on Tue Apr 11 15:38:15 2023 | | Urgent | Diag |
|
probleme camera TL1 | |
camera TL1 senble de pas trigger correctement
Nicolas peux tu appeler la sdc stp
Plus besoin desole pb resolu |
|
733
|
Tue Apr 11 22:34:19 2023 |
Marie Vincent Noureddine Jean-Noel | | Shift summary | Linac Commissionning |
|
| |
Debut vers 16h
Passage section avec Isol=200, 1.7 db, ph=110
Avec script alignement QUADS de Kevin
Alignement Q1 avec strLI1 ---> H = -1.29 V= 0.52
Alignement Q3 avec StrTL1 (et Q1 = 1A) ---> H = -2.44 V = -0.33
" " " " (et Q1 = 0) ---> H = -3.64 V = 0.12
Alignement Q3 avec StrLI2 (et Q1 = 0) ---> H = -0.06 V = 0.01 (ca semble pas fonctionner correctement ... a reverifier)
" " " " (et Q1 = 1) ---> H = -0.1 V = 0.01 (ca semble pas fonctionner correctement ... a reverifier)
On continue SANS StrTL1, i.e. :
StrLI1H = -1.29 StrLI1V = 0.52 StrLI2H = -0.1 StrLI2V = 0.01
Passage dipole 153.9 A, Q1=-1.2 Q2=3.1 Q3=-1.2 Idip=180 - Min dispersion pour ph_LIL=106
Images dans SST_TL2_sol180_min_disp
Sans toucher aux quads, dipole=0, image sur SST_TL1 dans SST_TL1_sol180_min_disp
Idip = 190 (toujours sans toucher aux quads)
Images dans SST_TL2_sol190_min_disp
dipole=0, image sur SST_TL1 dans SST_TL1_sol190_min_disp
Intention de Quad scan de Q3 (avec Q1=-1.2 Q2=3.1) pour I_dip=180 puis I_dip= 190
---> scan de -8 a +2 faisceau ok dans cette gamme (le faisceau se deplace beaucoup beaucoup sur SST_TL1 lorsque Q3=-8 a +2 , l'alignement avec STRLI 1 et 2 n'est pas bon je pense)
script Quad scan de Christelle ne marche pas (erreur en rouge, je ne sais plus ce que dit cette erreur)
Parallelement : Prises de donnees oscillo
1) Pilote - Klystron - Phase pilote/Klystron
2) Pilote - PA - Phase pilote/PA
et PiS + BPMs en meme temps.
---> A traiter (le faisceau sur BPMTL2 etait hyper bruite et "sautait" pendant toute cette prise de donnees)
Fin vers 20h30 |
|
734
|
Thu Apr 13 08:16:42 2023 |
KD, ND, Lisa | Under Process | Shift summary | LI | TL | LE | Diag |
|
shift du 13 avril 2023 | |
8h20 : mise en chauffe chiller/Frigo, Modulateur, Laser et PA.
9:30 Verification health check
- er/sy/rac.17-elr.01-rdp.03 ne demarre pas
9:50 Cyclage des aimants
10:30 Temperature chiller section > 31
11:00 Intervention vide:
- LI/VA/PEG.04 Tout semble normal malgr'e l' alarme sur l'atkpanel
- pour CFP: acces anneau, pas de fuite trouvee
11:17 Intervention MO+JNC pour probleme frigo => resolu.
11:45 Demarrage faisceau.
Charge 120pC => attenuation laser de 360 a 345 => charge 100pC
14:00 Transport faisceau.
Pb reglage en temps TL/DG/SST.01. Nouveau retard: 50e3us. Exposure: 0.04s
Phase section: 109
15:20 Sur EL/DG/SST.01 on voit que le faisceau est coupe pendant le transport... (cf copie d'ecran)
15:30 Reglage coupelle de Faraday EL/DG/FC.01.
Retard de ER/CA/WAC.03: -6.29us. Adaptation 50 ohm a faire.
Verifier qu'il ne se declenche que sur le canal exterieur et pas sur toutes les voies (par exemple apres coupure electrique).
16:15 Recette de transport jusqu'a EL/DG/FC sauvee dans TL+LE:Test recipes
16:30 Observation Cerenkov: Cf video sur https://photos.app.goo.gl/42HKzkkWm84QKhhEA
Passage a 5Hz.
Alignement OBL. Il reste du travail à faire (1/2 journée) pour atteindre la salle laser.
17:20 Arret ThomX |
|
735
|
Wed Apr 19 12:41:18 2023 |
CB/HG | | Problem | Linac Commissionning |
|
urgent : Pb IHM phase | |
Bonjour,
nous ne pouvons pas piloter la phase depuis l'IHM, elle est en boucle et ne s'arrete pas.
Est ce qu'il y a eu des modifications sur l'IHM ?
A+
Christelle |
|
736
|
Wed Apr 19 14:47:58 2023 |
KD/CB | | Shift summary | Linac Commissionning |
|
run du 19 avril 2023 | |
NB de Christelle : pendant toute la durée de la manipe, l'atténuateur section a été repris à plusieurs reprises. A noter que selon l'origine de la fluctuation puissance incidente section, ou phase section, ou effet thermique dans les guides, l'effet n'est pas le même sur la dynamique, et un rattrapage de l'atténuation ne semble pas suffisant pour recouvrir les paramètres faisceaux twiss, dispersion en énergie. En conséquence, le transport est modifié, le paramètre k des quads aussi.... On ne sait pas ce qu'on fait
Déroulement de la manipe :
modulateur 1090V, iris 1.3 mm, position laser initiale 4.90/2.42 mm
Dimensions laser 0.34/0.29mm
Moteur solenoides à ces valeurs : Z 3.3mm/-4.9mrad, et en X : 0.8mm/ 10,201mrad
Pb delay TLSST2
Objectif : test nouvelles position laser 4.4/2.1 mm afin de trouver un meilleure orbite globale à la machine, puisque aucun axe EM ne correspond (canon/section/ premier triplet)
réalignement du solénoide pour cette valeur : Translation X=0.543mm, Z 4.185 mm, rotation : 5.8288 mrad, -6.57mrad
Phase Qmax 337°, énergie mesurée 5MeV@285°, charge phase enregistré (ci-joint)
Solenoide à 238 pour reproduire la focalisation à LI SST1 (image enregistrée dans image ref)
Energie mesurée avec le steerer 48.5 MeV (avec 1.24 dB) , NB : ajouter mise à zero des quad en début de script
alignement avec steerer linac sur les quad 1 & 3
QP1 2 3 =[-3,4 5,2 -1,1] A, image enregistrée dans le dossier ref image pour chaque station LI SST1, TLSST1, TL SST2, Idip= 159,3A
quad 3 scan @238A, QP12=[-3.07 +3,16], image sauvée sur TL SST2 avec QP3 = 0.8A. Les conditions ont encore changées Idip = 158,6A.....
l'analyse indique que l'espread a varié entre deux mesures, impossible de joindre les images png sur le elog....
mesures sur TL SST1 et TL SST2
a remplir avec les notes |