  717   Fri Mar 17 08:55:42 2023 IC, VM, VK, ND Shift summaryRing Commissioning RIng commissioning 

8:50 Mise en chauffe

10h Starting the beam

Tuning of the TL

We started from the last Friday setting and the beam storage was not succefull.

Optimization of the storage. The RF freq was set to 500.424 MHz. RF voltage was 40-100 kV

After several optimizations, the good storage was obtained ~15h

The final RF freq 500.4099 MHz

The data was taken concerning the betatron oscillations. Should be analysed offline.

16h40 Shift finished.

 

  718   Thu Mar 23 15:15:56 2023 SCUnder ProcessProblemCC Tests CC apres re-démarrage 

15h16 redémarrage de client 3

Problème avec le commutateur de la baie en salle de controle (celui qui gère les badges), action en cours pour le changer, Nouveau commutateur : thomx baie38-3, RES505

Client 1 ok

Client 2 ok

Client 3 ok

Client 4 ok

Client 5 ok

15h48 : Automate de la baie 5 ne redémarre pas

16h27 : Toujours pas d'automate dans la baie 5

ticket envoyé à CC pour savoir comment on fait quand le ping de automate-b5.thomx.fr donne un Destination Host Unreachable

16h50 Re-démarrage des serveurs pour essayer de relancer l'automate et arret des diags

17h25 Toujours pas d'automate b5, diags à l'arret

A suivre demain

  719   Fri Mar 24 08:52:49 2023 SC/JNC/VCUnder ProcessProblemCC Redémarrage ThomX 

8h53 Serveur DNS et DHCP non redémarré, ping ne fonctionne pas, en attente d'une solution

Re-démarrage automate et cpci (JNC)

14h13 ping sur automate ok

15H

er/sy/rac.17-elr.01-rdp.03    dans IHM healthckeck remarrage impossible .. dans astor

Remise en route synchro et camera (ND)

Re-démarrage de tout dans astor

Reste à regarder : er/sy/rac.14-elr.01-rdp.03 en server off qui refuse de se mettre on

Allumer le laser photocathode.

pompage vide pompe ionique prévu pour lundi, pas de faisceau lundi.

  720   Mon Mar 27 13:55:41 2023 Entered by Super Team from 134.158.195.141 on Mon Mar 27 13:55:24 2023Under ProcessInfoLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Etat ThomX  

Cavité FP a terminé son intervention

Mise sous vide possible cette après-midi

14h Intervention IHM cavité RF

14h04 Fermeture casemate

Interruption possible pour mettre demi-anneau sous vide

Etude IHM cavité RF en cours (PG, ME)

14h45 Mise sous vide demi anneau, ouverture casemate

16h Fin d'intervention du vide, pompage turbo en cours

 

 

 

 

  721   Wed Mar 29 13:35:25 2023 MJ ProblemLinac Commissionning ICT1 ?? 

demarrage vers 13h

Pb de vide depuis une demi-heure (MV-1 rouge sur le pss) Bruno est venu + Nourredine tel

pb resolu

ICT 1 ne fonctionne pas

ICT1 re fonctionne , par contre pB moyennaage et std   DS mean std ne fonctionne pas bien? 

 

  722   Thu Mar 30 09:34:24 2023 Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 09:34:11 2023 Shift summaryLinac Commissionning Nouvelle position laser/cathode (du 29 mars) 

Nouvelle position laser/cathode du 29 mars : x=4.91mm / y=2.40mm

  723   Thu Mar 30 13:35:13 2023 Entered by SC from 134.158.195.141 on Thu Mar 30 13:34:57 2023Under ProcessLinacLinac Commissionning Faisceau Linac 

14h38 : Démarrage faisceau linac

Modulateur 1090V, Position laser horizontale 4.910 mm et verticale 2.40 mm

Iris 1.3 mm

Attenuation laser = 344

Attenuation canon RF = 0.0 dB et Attenuation section = 1.50 dB

temperature consigne canon = 31.50° et temperature consigne section = 29°

Sans solénoide, Phase de charge max = 204 donnée par le scan charge phase du DS, on ne voit pas le faisceau à cette phase, en focalisant le faisceau pour le voir sur l'écran on est dans une gamme de phase allant de 209 à 216

Charge 124 pC

Arret faisceau

Détection de fuite pour le vide en cours

 

  724   Thu Mar 30 17:20:43 2023 Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 17:20:29 2023 Shift summaryLinac Commissionning   

Shift ce matin

** YagTL1 vs soleno avec alignement a la Kev ou a la Hayg (mais chaque fois aligne dans Q1-Q3). --> trajet dans la LIL differents - Mesures avec soustraction courant obscurite (df la pj)

** pour Sol=180A, taille sur YAG 1 pour plusieurs str1 ---> taille horix sur YAGTL1 varie de 0.2 a 0.8 (cf la pj)

Meme si le passage dans la LIL avec des desalignement differents a un effet, ca n'explique toujours pas le desaccord data/simul ASTRA ...

Fin de shift vers 13h

  725   Fri Mar 31 10:11:40 2023 Entered by Super Team from 134.158.195.141 on Fri Mar 31 10:11:25 2023 LinacLinac Commissionning Faisceau Linac 

10h12 Démarrage modulateur et refroidissement

Lancement de l'archivage

11h05 Fermeture casemate

Config linac sur le MPS, pas possible la config LI-TL-LE manque le volume vide V6 du MPS pour cette configuration

11h17 Fermeture casemate et Démarrage faisceau

Scan charge phase phase charge max donnée par script = 219 degres, charge max = 112 pC

Position laser PosX = 4.910 et PosY = 2.400 sur feedback position

Modulateur HV = 1090V, attenuation canon = 0.0 dB et attenuation section = 1.50 dB

Le faisceau est plutot instable en intensité, il disparait et ré-apparait

Max de foc à phi = 223 degres, zone de faisceau visible entre 217 et 223 degres

Mesure phase - énergie canon avec soleno foc en cours.

13h00 Arret du faisceau - pause repas

14h20 Reprise

Mesure phase energie section

17h Arret machine

  726   Fri Mar 31 10:44:31 2023 Entered by Super Team from 134.158.195.141 on Fri Mar 31 10:11:25 2023 LinacLinac Commissionning Faisceau Linac 

Qui me pique internet ?

Et m'éfface le elog ?

  727   Tue Apr 4 12:13:18 2023 MJ KDUnder ProcessShift summaryLI | TL | LE | Linac Commissionning shift du 04 avril 2023 

12h10: Mise en chauffe modulateur, laser et chiller + PA

14h30: mesure phase relative sortie pilote/ sortie PA  Vrms pilote, Vrms PA   Sans HT dans le Klystron

s'il vous plait,  Indiquez l'heure du passage  sous haute  tension (pour voir si cela change quelque chose à aux mesures RF) MERCI

15h03 modulateur trig

Wave catchers arretes soft - Vincent les a redemarre (c'etait pareil la semaine derniere, Y-a-t-il qqun qui les arretent ?

 

 

 

 

  Draft   Tue Apr 4 15:21:51 2023      , entered from 134.158.195.141 
<p>12h10: Mise en chauffe modulateur, laser et chiller + PA</p>

<p>14h30: mesure phase relative sortie pilote/ sortie PA&nbsp; Vrms pilote, Vrms PA&nbsp; &nbsp;<strong>Sans HT dans le Klystron</strong></p>

<p>s&#39;il vous plait,&nbsp; Indiquez l&#39;heure du passage&nbsp;&nbsp;sous haute&nbsp; tension (pour voir si cela change quelque chose &agrave; aux mesures RF) MERCI</p>

<p>15h03 modulateur trig</p>

<p>Wave catchers arretes soft - Vincent les a redemarre (c&#39;est la 2eme fois) Est-vr</p>

<p>&nbsp;</p>

<p>&nbsp;</p>
  729   Thu Apr 6 12:57:29 2023 Entered by Super Team from 134.158.195.141 on Thu Apr 6 12:57:15 2023 LinacLinac Commissionning Faisceau Linac 

12h57 Mise en chauffe modulateur et refroiddissement canon et section

Vide dans l'anneau de l'ordre de 10-8

Mise en route faisceau

Phase charge max = 66, charge = 103 pC, iris 1.3mm, HT = 1090V, attenuation laser = 330, Attenuation canon = 0 dB, attenuation section = 1.5 dB

17h34 Arret faisceau

 

 

 

 

 

  730   Fri Apr 7 13:48:55 2023 Entered by Super Team from 134.158.195.141 on Fri Apr 7 13:42:08 2023 LinacLinac Commissionning Faisceau Linac 

Programme :

 - Mesure Energie apres section en fonction de la phase avec steerer sur TL/SST.01

 - Mesure Energie apres section en fonction de la phase avec dipole sur TL/SST2

Mise en route laser + RF

Scan Charge Phase , phase charge max = 60 degres, Charge max = 98 pC

LI/PS/STR.01-H.01 = -2A

LI/PS/STR.01-V.01 = 0.5A

Attenuation section = 1.5 dB et HT modulateur = 1090V

15h40 le faisceau a changé de forme sur écran YAG TL/DG/SST.01 pendant la mesure au steerer

17h02 Arret faisceau

 

 

 

 

 

  731   Tue Apr 11 12:59:18 2023 Entered by Super Team from 134.158.195.141 on Tue Apr 11 12:59:03 2023 LinacLinac Commissionning Faisceau Linac 

13h : Mise en chauffe modulateur et refroidissement

14h34 Faisceau, HT = 1090V, HoPoslaser = 5.039, vertposlaser = 2.291, attenuation canon = 0.0 dB et attenuation section = 1.77 dB

Phaes charge max = 53 degres, Qmax = 74 pC

 

 

  732   Tue Apr 11 15:38:34 2023 Entered by Super Team from 134.158.195.141 on Tue Apr 11 15:38:15 2023 UrgentDiag probleme camera TL1  

camera TL1 senble de pas trigger correctement

Nicolas peux tu appeler la sdc stp

Plus besoin desole pb resolu

  733   Tue Apr 11 22:34:19 2023 Marie Vincent Noureddine Jean-Noel Shift summaryLinac Commissionning   

Debut vers 16h

Passage section avec Isol=200, 1.7 db, ph=110

Avec script alignement QUADS de Kevin

Alignement Q1 avec strLI1                        ---> H = -1.29  V= 0.52

Alignement Q3 avec StrTL1 (et Q1 = 1A)   ---> H = -2.44   V = -0.33

       "          "     "       "        (et Q1 = 0)     ---> H = -3.64    V = 0.12

Alignement Q3 avec StrLI2   (et Q1 = 0)      ---> H = -0.06   V = 0.01    (ca semble pas fonctionner correctement ... a reverifier)

     "            "    "         "        (et Q1 = 1)      --->  H = -0.1  V = 0.01     (ca semble pas fonctionner correctement ... a reverifier)

 

On continue SANS StrTL1, i.e. :

StrLI1H = -1.29   StrLI1V = 0.52 StrLI2H = -0.1 StrLI2V = 0.01

Passage dipole 153.9 A, Q1=-1.2   Q2=3.1   Q3=-1.2  Idip=180  -  Min dispersion pour ph_LIL=106

Images dans SST_TL2_sol180_min_disp

Sans toucher aux quads, dipole=0, image sur SST_TL1 dans SST_TL1_sol180_min_disp

Idip = 190 (toujours sans toucher aux quads)

Images dans SST_TL2_sol190_min_disp

dipole=0, image sur SST_TL1 dans SST_TL1_sol190_min_disp

 

Intention de Quad scan de Q3 (avec Q1=-1.2  Q2=3.1) pour I_dip=180 puis I_dip= 190

--->  scan de -8 a +2 faisceau ok dans cette gamme (le faisceau se deplace beaucoup beaucoup sur SST_TL1 lorsque Q3=-8 a +2 , l'alignement avec STRLI 1 et 2 n'est pas bon je pense)

script Quad scan de Christelle ne marche pas (erreur en rouge, je ne sais plus ce que dit cette erreur)

 

Parallelement : Prises de donnees oscillo

1)  Pilote   -  Klystron  -  Phase pilote/Klystron

2)  Pilote   - PA   -   Phase pilote/PA

et PiS + BPMs en meme temps.

---> A traiter (le faisceau sur BPMTL2 etait hyper bruite et "sautait" pendant toute cette prise de donnees)

Fin vers 20h30

  734   Thu Apr 13 08:16:42 2023 KD, ND, LisaUnder ProcessShift summaryLI | TL | LE | Diag shift du 13 avril 2023 

8h20 : mise en chauffe chiller/Frigo, Modulateur, Laser et PA.

9:30 Verification health check

- er/sy/rac.17-elr.01-rdp.03 ne demarre pas

9:50 Cyclage des aimants

10:30 Temperature chiller section > 31

11:00 Intervention vide:

- LI/VA/PEG.04 Tout semble normal malgr'e l' alarme sur l'atkpanel

- pour CFP: acces anneau, pas de fuite trouvee

11:17 Intervention MO+JNC pour probleme frigo => resolu.

11:45 Demarrage faisceau.

Charge 120pC => attenuation laser de 360 a 345 => charge 100pC

14:00 Transport faisceau.

Pb reglage en temps TL/DG/SST.01. Nouveau retard: 50e3us. Exposure: 0.04s

Phase section: 109

15:20 Sur EL/DG/SST.01 on voit que le faisceau est coupe pendant le transport... (cf copie d'ecran)

15:30 Reglage coupelle de Faraday EL/DG/FC.01.

Retard de ER/CA/WAC.03: -6.29us. Adaptation 50 ohm a faire.

Verifier qu'il ne se declenche que sur le canal exterieur et pas sur toutes les voies (par exemple apres coupure electrique).

16:15 Recette de transport jusqu'a EL/DG/FC sauvee dans TL+LE:Test recipes

16:30 Observation Cerenkov: Cf video sur https://photos.app.goo.gl/42HKzkkWm84QKhhEA

Passage a 5Hz.

Alignement OBL. Il reste du travail à faire (1/2 journée) pour atteindre la salle laser.

17:20 Arret ThomX

  735   Wed Apr 19 12:41:18 2023 CB/HG ProblemLinac Commissionning urgent : Pb IHM phase 

Bonjour,

nous ne pouvons pas piloter la phase depuis l'IHM, elle est en boucle et ne s'arrete pas.

Est ce qu'il y a eu des modifications sur l'IHM ?

A+

Christelle

  736   Wed Apr 19 14:47:58 2023 KD/CB Shift summaryLinac Commissionning run du 19 avril 2023 

NB de Christelle : pendant toute la durée de la manipe, l'atténuateur section a été repris à plusieurs reprises. A noter que selon l'origine de la fluctuation puissance incidente section, ou phase section, ou effet thermique dans les guides, l'effet n'est pas le même sur la dynamique, et un rattrapage de l'atténuation ne semble pas suffisant pour recouvrir les paramètres faisceaux twiss, dispersion en énergie. En conséquence, le transport est modifié, le paramètre k des quads aussi....  On ne sait pas ce qu'on fait

Déroulement de la manipe :

modulateur 1090V, iris  1.3 mm, position laser initiale 4.90/2.42 mm

Dimensions laser 0.34/0.29mm

Moteur solenoides à ces valeurs : Z 3.3mm/-4.9mrad, et en X : 0.8mm/ 10,201mrad

Pb delay TLSST2

Objectif : test nouvelles position laser 4.4/2.1 mm afin de trouver un meilleure orbite globale à la machine, puisque aucun axe EM ne correspond (canon/section/ premier triplet)

réalignement du solénoide pour cette valeur : Translation X=0.543mm, Z 4.185 mm, rotation : 5.8288 mrad, -6.57mrad

Phase Qmax 337°, énergie mesurée 5MeV@285°, charge phase enregistré (ci-joint)

Solenoide à 238 pour reproduire la focalisation à LI SST1 (image enregistrée dans image ref)

Energie mesurée avec le steerer 48.5 MeV (avec 1.24 dB) , NB : ajouter mise à zero des quad en début de script

alignement avec steerer linac sur les quad 1 & 3

QP1 2 3 =[-3,4 5,2 -1,1] A, image enregistrée dans le dossier ref image pour chaque station LI SST1, TLSST1, TL SST2, Idip= 159,3A

quad 3 scan @238A, QP12=[-3.07 +3,16], image sauvée sur TL SST2 avec QP3 = 0.8A. Les conditions ont encore changées Idip = 158,6A.....

l'analyse indique que l'espread a varié entre deux mesures, impossible de joindre les images png sur le elog....

 

 

 

mesures sur TL SST1 et TL SST2

a remplir avec les notes