778
|
Mon Jun 26 09:27:46 2023 |
ND, LS | New Solution | Shift summary | Diag |
|
ThomX operations 26/6 | |
9:26 Mise en chauffe
9:40 Cycling the magnets
11:45 Beam ON
12:23 Study signal in FC
WAC2 delay: -6.15us
WAC3 delay: -6.45us
12:30 Prise image TL/FC.01
12:45 Difficultés allumage kicker extraction
13h45 Trasnport dans EL jusqu'à l'écran
14h33 Visualisation du signal dans EL/FC.01 => changement retard synchro sur WAC3
17h15 Arret Machine |
|
Draft
|
Thu Jun 29 13:09:57 2023 |
LS, ND | New Solution | Shift summary | Ring |
|
shift du 29 juin 2023 | |
9:45 Git pull
Test des interfaces... OK
Probleme sur les ecrans du compte operateur ThomX (4x1 ecran) meme apres redemarrage => reconfiguration
10:10 Mise en chauffe
Interlock sur les aimants vu pendant le cyclage. Resolu.
11:30 Faisceau
12:05 Allumage cavite anneau (MEK)
12:15 Perte faisceau...
Apparement le PA avait disjoncte. Intervention MO.
13:00 Retour faisceau
Prise de données TL/FC01
13:30 Transport dans EL, essaie d'amélioration du transport : on a réussi à transporter environ 1/3 de la charge
Prise de données dans EL/FC01
15:00 Stockage dans anneau, optimisation
16:00 Prise de données pour étudier les pertes dans les fibres.
Prise de données des pertes:
-sans faisceau, avec juste kicker d'injection, septum, ou kicker d'extraction
-sans faisceau, avec tous les EP : obtenir bruit de fond
-avec faisceau, avec juste kicker d'injection, septum, ou kicker d'extraction
-avec faisceau: prise de données avec différents timing pour le kicker d'extraction => extraire le faisceau pour comprendre le timing de l'acquisition et observer les pertes avec différents timing de d'extraction |
|
841
|
Mon Feb 5 09:13:15 2024 |
ND, Anna K, Elene K, Marie L | New Solution | Shift summary | LI |
|
Prise de donneees 5/02 | |
Coordinator: ND
9h12: Modulator start
PSS: Default centrale SSI
10h30 Beam
Load recipe: LI_TL_straight_test_20231027_11_21_15
12:15 Lunch break
Strange message left on one of the computer screens.
14:15: The shutter was moved over lunch time without it being logged.
14h20 Access to check MRSV
14h40 Restart beam
Some signal observed beam on and not beam off. But strongly misaligned.
Several access, trying to align the MRSV. No luck. More time to be spent on it.
17h30 Stop beam
|
|
877
|
Fri Jun 7 09:24:59 2024 |
Entered by Super Team from 134.158.195.141 on Fri Jun 7 09:24:42 2024 | New Solution | Shift summary | Infra | Linac Commissionning |
|
Interventions du matin | |
9h Intervention sur les filtres de la CTA (Dalkia, Stéphane)
9h Intervention dans les sous-sols (infra) pour le pompage, ouverture des grands vantaux
9h20 CTA remise en route accès à la casemate à nouveau possible
9h20 Intervention Dalkia concernant les réglages de la pompe, arrêt de la pompe à prévoir qui va durer au moins toute la matinée
Cable coupé controlé par le SPR : ok pas de soucis, cable posé sur les dosimètres
L'intervention sur les pompes de la fosse nord n'est pas terminé et continuera cette apres midi : besoin acces fosse nord
|
|
904
|
Wed Aug 21 14:22:17 2024 |
KD | New Solution | Info | LI | Laser |
|
mesure laser PC du 20 aout 2024 | |
Mesure du Laser Photocathode le 20 aout 2024:
prise de la forme du faisceau sur la PhotoCathode Virtuelle pour différente taille d'iris : 7mm (ouverture max), 3mm, 1.3mm
Prise de puissance laser atténuateur à 410 pas :
sortie Laser : 295 uJ
Sortie Iris :
1.3mm : 70uJ
7mm (ouverture max) : 202 uJ
Entree canon :
iris 1.3mm : 53 uJ
iris 7mm (ouverture max) : 135 uJ
l'Iris a ete reconfigurée (bug dans le retour de position).
|
|
966
|
Fri Nov 22 11:04:39 2024 |
KD | New Solution | Linac | LI |
|
laser PC | |
Mesure de ce matin et réalignement:
sortie laser : 298uJ
sortie ligne de transport : 209uJ
sortie iris 1.3mm: 80uJ
Injection canon: 60uJ@420pas
voir image faisceau |
|
995
|
Tue Jan 14 10:42:56 2025 |
KD | New Solution | Info | LI | Opt |
|
alignement laser PhotoCathode | |
Mesure de ce matin et changement point cathode [H,V] = [4.29,3.49]:
sortie laser : 275 - 280uJ
sortie ligne de transport : 184uJ
sortie iris 1.3mm: 73uJ
Injection canon (iris 1.3mm): 56uJ@420pas
Injection canon (iris 1.3mm): 45uJ@350pas |
|
1065
|
Tue May 6 11:38:24 2025 |
VS, AG, KD | New Solution | Info | LI | Laser | Opt | Linac Commissionning |
|
changement PhotoCathode |
|
lundi 5 mai : remise à l'air et démontage de l'ancienne cathode (Cu)
- Le faiscea laser est remis sur les réferences et le faisceau passe au travers de la cathode trouée (OK pour le Mg). NB. Le trou de la cathode trouée fait la taille de la pastille de Mg. (cf. Photos)
- démontage et inspection du hublot et miroir de renvoie sous vide (démontage de l'ICT pour accéder au miroir de renvoie) :
* le Hublot semble ok mais il est salle sur la face à l'air ==> nettoyage
* le miroir de renvoie est piqué (impacts laser) de plus il est éclaté (casse du substrat sûrment dû à des arcages) ==> changement du miroir
** Impossibilité de le mettre sans réhausse en fasse arrière (clinquants).
** Les griffes de maintien sont mises plus fortement en appuis sur le miroir.
** Contact électrique vérifié entre la face avant (dépôt argent) et le support.
mardi 6 : alignement laser sur la cathode trouée
- le faisceau est réaligné au centre de la cathode trouée. Nouvelle position de référence sur la caméra PhotoCathode [H,V] = [5.55, 3.35]
- mesure de puissance laser Photocathode :
sortie Iris :
@1.3mm 20uJ
@3mm 57uJ
@7mm 93uJ
injection canon atténuateur @420pas :
@1.3mm 18uJ
@3mm 48uJ
@7mm 78uJ
sortie canon (sur la cathode Mg) atténuateur @420pas :
@1.3mm 14uJ
@3mm 40uJ
@7mm 63uJ
mercredi 7 mai : remise sous vide du canon (~12h), cathode installée depuis 16h la veille
- mesure/calibration atténuateur pour limiter l'énergie laser à 5-10uJ (pour débuter) |
|
4
|
Tue May 28 15:07:37 2019 |
Entered by Aurélien Martens from 134.158.88.183 on Tue May 28 15:07:25 2019 | Fixed | Info | Tango |
|
Photocathode laser DS back operational |
|
Following:
1) a crash on 4th of April and a violent reboot of the ELLiOOs embeded machine
2) the need to recover the whole database files in the ELLiOOs embeded machine
the ElliOOs sofware was running back quickly. Though recently (in terms of working and available days) was reported that the tango DS was not communicating.
The reason why stayed misterious.
Following calls to Amplitude Laser (Vianney) last week and, today, a callabck from SCARELL (Romain and Jean-François), it is now understood that :
- the content of the data repository corresponding to the Tango gateway was not dynamically created (~/bin/ElliOOs/User/Data/28*/*). The specific file that was missing since the 5th of arpil reeboot was Plugin.sml.
Recovering this file and properly rebooting the embedded machine (from the ElliOOs programme running on the HOST, in the System Info --> reboot embedded), allowed to revoer the com.
Indeed it was checked by looking at jive by Falcoz.
An archive of the Code repository was done in case it is required to recover these files again. Archive sent to SCARELL.
Please remember to reboot the embeded in case there is a reoboot of TANGO machine in the main control room or if the database is reset.
Please also note that trying to look at the content of the TANGO_HOST variable in superuser or default user will not help in understanding if tango is running locally.
|
|
Draft
|
Thu Apr 8 21:14:09 2021 |
Entered by talour from 134.158.205.2 on Thu Apr 8 21:11:41 2021 | Fixed | Shift summary | Prise de donnees |
|
| |
|
|
8
|
Tue Jun 8 10:40:54 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 10:40:40 2021 | Fixed | Info | etc |
|
Fermeture sous-sols et toit casemate | |
Les sous-sols et le toit sont maintenant fermés |
|
16
|
Tue Jun 8 14:49:12 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:48:07 2021 | Fixed | Info | docs |
|
| |
LI/HFI/ATT.02-MOT.01 Attenuateur Canon |
|
17
|
Tue Jun 8 15:05:04 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:49:35 2021 | Fixed | Info | etc |
|
attenuateur section tests butée moteur | |
ATT01-MOT01 atténuateur section course de -870 step à 2485 pour les butées |
|
18
|
Tue Jun 8 15:06:12 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 15:05:59 2021 | Fixed | Info | etc |
|
| |
ATT02-MOT01 attenuateur canon en butée à -8 jusque 3329 |
|
20
|
Tue Jun 8 17:04:44 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:04:28 2021 | Fixed | Info | etc |
|
Hv sur modulateur | |
Sur le MPS, Vérifiez qu'on est bien en PARAMETRES/ Linac pour autorisation HV sur modulateur |
|
21
|
Tue Jun 8 17:16:10 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:15:58 2021 | Fixed | Info | etc |
|
| |
Modulateur OK, HT = 500 V en trig |
|
23
|
Tue Jun 8 17:30:12 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:29:26 2021 | Fixed | Info | etc |
|
| |
Capture ecran modulateur |
|
24
|
Tue Jun 8 17:40:20 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:40:07 2021 | Fixed | Shift summary | resumes |
|
Résumé de la journée | |
- Pour les atténuateurs : les butées ont été trouvées, ATT02-MOT01 c'est la canon, ATT01-MOT01 c'est la section.
- Des difficultés ont été rencontrés avec le modulateur : Interlock à cause de l'eau, interlock alim HT, reboot modulateur et vérification de l'autorisation de tir MPS faite.
Le modulateur fonctionne maintenant sans problèmes à une tension de 1240V et un vide klystron de 1.2 uA qui devrait diminuer par la suite. Les mesures radioprotection ont été faites
- Pour le MPS, cliquez sur Paramètres en bas de l'écran principal puis vérifier que LINAC est on.
Pour demain :
- Démarrer régulation eau en plus du modulateur
- Vérifier les signaux RFs sur oscillo et Réglage des retards (demarrage_delays)
- Ne pas mettre beaucoup de puissance, vérifier la chaine RF et vérifier les atténuateurs
- Vérifier caméra et ICT |
|
30
|
Wed Jun 9 18:12:09 2021 |
Entered by bruni from 134.158.195.141 on Wed Jun 9 18:11:49 2021 | Fixed | Shift summary | Prise de donnees |
|
Mise en route RF +PA | |
HT on, on met le PA
On met la HT à 500V, soit 128 kV de HT klystron. On mesure avec le crystal numero 8. On doit avoir selon la règle de calibration avec une atténuation de 70 dB, 0.349 MW
On change la largeur HF de 2 à 1 us, la HT est tombée. Faire des tests de corrélation timing/klystron
Défaut d'eau sur le modulateur. Suite de l'ouverture d'une vanne pour les tests de cavité RF anneau.
On remet le modulateur en chauffe. On met une durée de 2 us, avec 500V--> 650V, on voit un petit signal Pic
A 730V de HT, on mesure 0.3mV, qui nous fait 0.3kW, or la mesure klystron nous indique 0.8MW. On devrait donc avoir 1/3 au canon. On vérifie que l'atténuateur sur guide est bien au minimum.
On a des claquages sur le PIK.
On voudrait changer un des réglages de la synchro. L'IHM ne répond pas --> Hayg regarde
| |
|
2 |
incident klystron |
334 |
70 |
0 |
0 |
1.00E-07 |
8 |
6.88E-08 |
6.13E-04 |
9.93E-02 |
1 |
50 |
1.041 |
| |
|
|
incident canon |
0.25 |
70 |
0 |
0 |
1.00E-07 |
1 |
1.11E-07 |
9.80E-04 |
1.07E-01 |
0.98 |
50 |
0.0003 |
| 730 |
|
2 |
incident klystron |
8.226 |
70 |
19.9 |
0 |
1.02E-09 |
8 |
6.88E-08 |
6.13E-04 |
9.93E-02 |
1 |
50 |
0.839 |
| |
|
|
incident canon |
0.385 |
70 |
0 |
0 |
1.00E-07 |
1 |
1.11E-07 |
9.80E-04 |
1.07E-01 |
0.98 |
50 |
0.0004 |
| 730 |
|
2 |
incident klystron |
8.226 |
70 |
19.9 |
0 |
1.02E-09 |
8 |
6.88E-08 |
6.13E-04 |
9.93E-02 |
1 |
50 |
0.839 |
| |
|
|
incident canon |
0.3 |
70 |
0 |
0 |
1.00E-07 |
1 |
1.11E-07 |
9.80E-04 |
1.07E-01 |
0.98 |
50 |
0.0003 |
Tout est à zero, on charge la recette synchro de mars 2021.
On n'arrive pas à piloter les retards, on n'a pas le temps de taper dans l'IHM.
On arrête.
|
|
31
|
Wed Jun 9 21:48:23 2021 |
Entered by bruni from 134.158.195.141 on Wed Jun 9 21:48:07 2021 | Fixed | Shift summary | resumes |
|
reporting du 9 juin, et planning du 10 juin matin | |
Nous avons procéder au debuguage de la RF, principalement des réglages de synchro delai et IHM.
On dispose à présent du PIk en salle de controle sur l'oscilloscope
les atténuateurs ont été réglés pour le canon et la section
Un fichier excell a été préparé pour obtenir les puissance incidente et réflechie à partir des chaines, ranger dans commissiong tools
On a pu voir le signal Pic du canon. les puissances ne correspondent pas à ce qu'on attend
Pour demain matin : régler le problème de l'IHM delay qui nous empeche de saisir un chiffre
Rerégler les retards du PA et faire une nouvelle recette. Vérifier les chaines de mesure car les puissance ne correspondent pas.
Vérifier l'absnce de claquage en amont du circulateur à 0.5us de largeur RF
|