HOME
Prise de donnees
MML
Controle commande
Simulations
Notes
Hardware
Ligne X
Laser Interaction
Diagnostiques
Synchronisation
Commissionning
Commissionning Preparation
Pannes
ShiftCheck
Toutes les notes concernant les Commissionning de ThomX, Page 35 of 63
Not logged in
Find
|
Last day
|
Login
|
Help
Full
|
Summary
| Threaded | Collapse |
Expand
1242 Entries
Goto page
Previous
1
,
2
,
3
...
34
, 35,
36
...
61
,
62
,
63
Next
Entered by Nicolas Delerue from 193.55.29.173 on Fri Jul 19 14:59:34 2024; Passage a 25Hz IHM conditionnement
Entered by SC/MO/CB from 134.158.195.142 on Tue Mar 8 13:21:48 2022; Paramètres faisceau du jour
Entered by SC/JNC from 134.158.195.141 on Fri Feb 18 13:53:04 2022; Paramètres faisceau
Entered by Super Team from 134.158.195.142 on Tue Oct 5 10:23:47 2021; Paramètres RFs
Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022; Paramètres Faisceau
Entered by Super Team from 134.158.195.141 on Mon Mar 7 16:30:22 2022; PSS redemarre
Entered by HM from 134.158.195.141 on Mon Mar 7 13:40:36 2022; PSS en sdc arreté
+
Entered by Super Team from 134.158.195.141 on Tue Feb 1 10:15:28 2022; PSS en alarme
Entered by Super Team from 134.158.195.141 on Tue Feb 1 11:44:50 2022; PSS : Pas de clef ThomX
Entered by Super Team from 134.158.195.142 on Fri Jan 14 15:02:49 2022; Ouverture iris laser
VK, IC. VM, AL, ND, LS; Orbit correction, optimization of the storage, study of the RF frequency
8x
VK, IC. VM; Orbit correction, BLM in the Ring
7x
ND, SC, Marie Labat, IC, VM; Opérations caméra à balayage / MRSV
20x
IC, VM, VK, AL, JH; Optimization of the ring
6x
ND, IC, VK, VM; Optimisation LE
ND; Operations du 7/11/2022
ND, VC, KD, VK; Operations du 13/10/2022
RC, DN, VC, ND; Operations 21/09
VK,VM,IC,ND; Operations 18/1
10x
ND/AM/LP/VK/VI; Operations
Goto page
Previous
1
,
2
,
3
...
34
, 35,
36
...
61
,
62
,
63
Next
ELOG V3.1.4-395e101