Entry   Entered by Nicolas Delerue from 193.55.29.173 on Fri Jul 19 14:59:34 2024; Passage a 25Hz IHM conditionnement 
Entry   Entered by SC/MO/CB from 134.158.195.142 on Tue Mar 8 13:21:48 2022; Paramètres faisceau du jour 
Entry   Entered by SC/JNC from 134.158.195.141 on Fri Feb 18 13:53:04 2022; Paramètres faisceau 
Entry   Entered by Super Team from 134.158.195.142 on Tue Oct 5 10:23:47 2021; Paramètres RFs  Screenshot_from_2021-10-05_10-27-42.png
Entry   Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022; Paramètres Faisceau 
Entry   Entered by Super Team from 134.158.195.141 on Mon Mar 7 16:30:22 2022; PSS redemarre 
Entry   Entered by HM from 134.158.195.141 on Mon Mar 7 13:40:36 2022; PSS en sdc arreté 
Entry   Entered by Super Team from 134.158.195.141 on Tue Feb 1 10:15:28 2022; PSS en alarme 
Entry   Entered by Super Team from 134.158.195.141 on Tue Feb 1 11:44:50 2022; PSS : Pas de clef ThomX  
Entry   Entered by Super Team from 134.158.195.142 on Fri Jan 14 15:02:49 2022; Ouverture iris laser 2022-01-14_mesure_charge.png
Entry   VK, IC. VM, AL, ND, LS; Orbit correction, optimization of the storage, study of the RF frequency 8x
Entry   VK, IC. VM; Orbit correction, BLM in the Ring 7x
Entry   ND, SC, Marie Labat, IC, VM; Opérations caméra à balayage / MRSV 20x
Entry   IC, VM, VK, AL, JH; Optimization of the ring 6x
Entry   ND, IC, VK, VM; Optimisation LE scan_ext_kicker_from_-8150_to_-8050_step_5.pngscan_ext_kicker_from_-8100_to_-8080_step_1_v2.pngscan_EL_PS_DP_01.pngScreenshot_from_2025-01-09_17-49-53.pngScreenshot_from_2025-01-09_17-52-20.png
Entry   ND; Operations du 7/11/2022 Screenshot_from_2022-11-07_14-07-30.pngscan_charge_phase_min_0.0_max_360.0_14_5_57.pngscan_charge_phase_min_140.0_max_180.0_14_6_41.pngdispersion_figure.png
Entry   ND, VC, KD, VK; Operations du 13/10/2022 Screenshot_from_2022-10-13_14-44-35.pngscan_charge_phase.png2022-10-13_17_16_21_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_150.pngcamera_delay_scan_full.pngcamera_delay_scan.png
Entry   RC, DN, VC, ND; Operations 21/09  scan_Laser_vs_RF_phase_2023_09_21_15_53.png
Entry   VK,VM,IC,ND; Operations 18/1 10x
Entry   ND/AM/LP/VK/VI; Operations  