  887   Fri Jul 19 14:59:48 2024 Entered by Nicolas Delerue from 193.55.29.173 on Fri Jul 19 14:59:34 2024FixedFixOpt Passage a 25Hz IHM conditionnement Le bouton pour passer le conditionnement
à 25Hz a été ajouté
sur l'IHM conditionnement.
  
  391   Tue Mar 8 13:22:01 2022 Entered by SC/MO/CB from 134.158.195.142 on Tue Mar 8 13:21:48 2022FixedLinacLinac Commissionning Paramètres faisceau du jour Attenuateur canon = 0dB

Energie mesurée  =
50 MeV
  
  353   Fri Feb 18 13:53:19 2022 Entered by SC/JNC from 134.158.195.141 on Fri Feb 18 13:53:04 2022FixedLinacLinac Commissionning Paramètres faisceau Energie laser sur photocathode : 40 - 45
uJ

Démarrage faisceau
  
  90   Tue Oct 5 10:24:12 2021 Entered by Super Team from 134.158.195.142 on Tue Oct 5 10:23:47 2021Under ProcessLinacLinac Commissionning Paramètres RFs  Signal à 150 mV -> Gradient de
80 MV/m

 
 Screenshot_from_2021-10-05_10-27-42.png 
  417   Thu Mar 24 17:12:01 2022 Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022Reference SolutionLinacLinac Commissionning Paramètres Faisceau Alignement laser

On retrouve la phase pour la charge
max phi = 313 degres (consigne chiller canon
  
  387   Mon Mar 7 16:30:36 2022 Entered by Super Team from 134.158.195.141 on Mon Mar 7 16:30:22 2022FixedProblemRF D1 | Linac Commissionning PSS redemarre Intervention Maher : PSS ok

 
  
  386   Mon Mar 7 13:40:56 2022 Entered by HM from 134.158.195.141 on Mon Mar 7 13:40:36 2022Not FixedProblemRF D1 | Linac Commissionning PSS en sdc arreté Le PSS ne tourne plus en SdC (roue crantée
figées) depuis le 5 mars 7:40

HM
  
  289   Tue Feb 1 10:15:44 2022 Entered by Super Team from 134.158.195.141 on Tue Feb 1 10:15:28 2022Under ProcessProblemLinac Commissionning PSS en alarme Le PSS est en statut spécial avec
écran clignottant avec statut LB9000
+ message Alarme Anoxie.
  
  293   Tue Feb 1 11:45:05 2022 Entered by Super Team from 134.158.195.141 on Tue Feb 1 11:44:50 2022Not FixedProblemLinac Commissionning PSS : Pas de clef ThomX  Impossible de démarrer sans cette
clef.
  
  255   Fri Jan 14 15:03:02 2022 Entered by Super Team from 134.158.195.142 on Fri Jan 14 15:02:49 2022 InfoLaser | Linac Commissionning Ouverture iris laser Ouverture de l'iris laser PC au
maximum => augmentation de la charge a
65 pC +- 1.2pC
 2022-01-14_mesure_charge.png 
  772   Fri Jun 16 09:36:07 2023 VK, IC. VM, AL, ND, LS Shift summaryRing Commissioning Orbit correction, optimization of the storage, study of the RF frequency 9h30 Start of the modulator and lasser
(GATE is closed).

9h46 Data is taken as background.
 8x 
  771   Thu Jun 15 17:46:40 2023 VK, IC. VM Shift summaryRing Commissioning Orbit correction, BLM in the Ring The BLM detector boxes were installed in
the ring. We connected 3 fibers and 2 scintillator
detectors in th ring to be able to observe
 7x 
  1010   Thu Feb 13 10:56:28 2025 ND, SC, Marie Labat, IC, VMUnder ProcessShift summaryRing Commissioning Opérations caméra à balayage / MRSV 8h50 Mise en chauffe modulateur

Changement de la carte mère
pour la badgeuse de la ligne X
 20x 
  580   Fri Oct 7 11:57:24 2022 IC, VM, VK, AL, JHUnder ProcessShift summaryRing Commissioning Optimization of the ring Start of the modulator at 9h45

11h30 Problem with water regulation.
Probably falseread of GUN PT100. Hayg and
 6x 
  992   Thu Jan 9 16:03:52 2025 ND, IC, VK, VMUnder ProcessShift summaryLE Optimisation LE 15h Scan extraction kicker vs EL/BPM.01.

See attached plots.

Some interferences with ring storage.
 scan_ext_kicker_from_-8150_to_-8050_step_5.pngscan_ext_kicker_from_-8100_to_-8080_step_1_v2.pngscan_EL_PS_DP_01.pngScreenshot_from_2025-01-09_17-49-53.pngScreenshot_from_2025-01-09_17-52-20.png 
  625   Mon Nov 7 11:02:19 2022 NDUnder ProcessShift summaryDiag | Ring Commissioning Operations du 7/11/2022 10:50 Fin intervention CFP

Intervention laser photocathode
toujours en cours et prioritaire mais preparation
 Screenshot_from_2022-11-07_14-07-30.pngscan_charge_phase_min_0.0_max_360.0_14_5_57.pngscan_charge_phase_min_140.0_max_180.0_14_6_41.pngdispersion_figure.png 
  588   Thu Oct 13 10:26:06 2022 ND, VC, KD, VKUnder ProcessShift summaryDiag | Ring Commissioning Operations du 13/10/2022 Les limites en courant ont été
implémentées  dans les
DS alimentation pour toutes la machine comformément
 Screenshot_from_2022-10-13_14-44-35.pngscan_charge_phase.png2022-10-13_17_16_21_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_150.pngcamera_delay_scan_full.pngcamera_delay_scan.png 
  795   Thu Sep 21 16:16:38 2023 RC, DN, VC, NDUnder ProcessShift summaryLI | TL | LE | Ring Operations 21/09  Modulateur en chauffe avant 14h

mise en place d'une synchronisation
compatible à la génération
 scan_Laser_vs_RF_phase_2023_09_21_15_53.png 
  831   Thu Jan 18 00:11:51 2024 VK,VM,IC,ND Shift summaryLI | TL | LE | Diag Operations 18/1 9:05 Git pull

9h14: Demarrage modulateur

10h22 Client 3 does not respond;
 10x 
  515   Thu Jul 21 09:43:58 2022 ND/AM/LP/VK/VI Shift summaryLinac Commissionning Operations  Test interface démarrage automatisée:

9h30: Allumage modulateur Ok

9h35: Allumage Frigo OK
  