Thu Oct 30 07:21:22 2025 |
Entered by Marie Jacquet from 134.158.205.9 on Thu Oct 30 07:21:05 2025 | Under Process | Shift summary | LI | TL | LE | Ring |
|
Programme shift (X-rays spectres vs atte & phases) | |
08h17 Warm-up ThomX: Modulator, Laser, Fridge
08h24 Chillers were started, cycling all magnets
09h18 HV is ON
09h21 HV 1215 V
The receipt recipe_recipe_LI_TL_RI_all_20251023_12_06_10.txt was loaded, linac phases, section attenuator and steerers were adjusted
10h10 RF Gun phase 202 dg., Sect Phase 206 dg., Sect. Att. 2.57 dB, Linac steerers: H [0.61 -2.91], V [-2.63 3.21], Laser Att. 274, Charges (BPMs): -94 -94 -97 -97 pC TL/BPM02 X = -1 mm
10h20 Beam in the ring. RF cavity 100 kV, phase 6.5 dg.
the receipt saved: recipe_recipe_LI_TL_RI_good_20251030_10_50_55.txt
The good receipt saved to references 50MeV_last....
17h10 Stop ThomX
Shift Program
-
Start the Archivage OK
-
Align 50 MeV beam in QP1 QP3 with Kevin script
-
TL_bpm2 : adjust espread and put beam at x=0
-
Store the beam in the ring with an orbit as flat as possible around the IP
-
Make a vertical FPC scan - Then put the table at maximum OK
-
Align the CdTe spectro on the on-axis position, approximatively by eyes with the Photonic science camera ==> take a spectrum OK
-
Change gun phase only OK
in positive direction ==> take a spectrum
return to "nominal" ==> spectrum
in negative direction ==> spectrum
return to "nominal" ==> spectrum
-
Change section attenuator only ==> idem (positive, "nominal", negative, "nominal") ==> 4 spectra OK
-
Change the section phase only ==> idem ==> 4 spectra OK
To not be affected too much by the motor hysteresis and by the boucle d'eau, "nominal" means that the beam has to return to its previous X position on TL_bpm2
|
|
709
|
Thu Mar 9 00:55:10 2023 |
ND, Sandry Wallon | Under Process | Shift summary | Diag |
|
Programme prise de donnée 9/03/2023 | |
9h15 Les stations etaient laissees ouvertes
9h15 Mise en chauffe modulateur
9h30 PSS gele => Appel MO
10h15 PSS gele. MO non joignable=> Appel PCR.
10h30 Intervention PCR => PSS redemarre => Vannes et gauge du linac en erreur (pression a 10-3mbar)
10h45 Appel groupe Vide => Intervention Bruno Mercier (pb coupure courant ; au retour du courant, toutes les alim ne se remettent pas en fonctionnement) ; retour au vert après acquitemment sur MPS
10h51 : nombreuses erreurs dans health check
11h05 : Perte adresse IP icepaps ? => Alim icepaps off puis on ;
11h30 : Pb health check résolu
12h00 : phase réglée à 1 deg
15h00 Analyse stabilite BPM linac
16h45 Faisceau dans TL
Mesure position vs TL/DP.01
18h05 Stop ThomX
===
Programme de la prise de donnée:
1) Démarrage du faisceau, transport dans TL et si possible EL
2) Mesure bruit sur chaque BPM: acquisition avec faisceau stable, comparaison avec écran
a) LI+TL ligne directe
b) LI+TL+EL
3) Même mesure avec variation de la charge
a) Gain contrôlé manuellement
b) Changements de gain automatique
4) Mesure de la position mesurée en fonction du courant dans TL/PS/DP.01
5) Mesure de la position mesurée en fonction du courant dans les actuateurs de la TL puis du linac |
| Attachment 1: health_check_2023_03_09_10_51.png
|
 |
| Attachment 2: health_check_2023_03_09_11_30.png
|
 |
| Attachment 3: scan_charge_phase_min_20.0_max_60.0_12_2_35.png
|
 |
|
Draft
|
Thu Oct 27 11:12:33 2022 |
Entered by Nicolas Delerue from 80.119.21.73 on Thu Oct 27 11:12:17 2022 | Under Process | Shift summary | |
|
Programme prise de donnée 28/10 | |
===
Program for the shift on 28/10
0) Git pull
1) Start beam
2) Measure respone of TL/SST.2 as function of time
3) Try to put TL/SST2 on negative polarity
4) Study BPM attenuation
|
|
762
|
Wed Jun 7 16:02:33 2023 |
LS, MB, VC, ND | Reference Solution | Shift summary | Ring |
|
Programme prise de donnees 8/06 | |
9:23 Mise en chauffe
Nombreux pb vide dans health check
Acces casemate pour verification polarite RI-C2/DG/BPM.02 pas de probleme trouve.
Observation des soufflets pres de RI-C2/AE/DP.04 ils semblent legerement deformes mais pres de RI-C1/AE/DP.01 aussi.
11:30 Tentative de demarrage mais probleme temperature eau...
12:00 Intervention Maher. Demarrage possible.
Pb declenchement wavecatcher... Resolu (le serveur etait plante)
14:00 BPM polarity studies
15:30 Measure frequency
16:30 To to steer the beam around the chamber
18:20 Stop
===
Programme de la prise de données du 8/06:
0) During warm up:
0a)check physically BPMs where there seem to be a polarity issue (needs 2 persons, a battery and a multimeter).
0b) CHeck vacuum chamber around RI-C2/AE/DP.04
1) Transport to TL/FC.01 (TL/DP.01 off). Record FC signal
2) Transport to TL/SST.02 and TL/BPM.02. Record BPM adc signal while closing dispersion (for Mouad's studies).
3) Transport to EL/FC.01. Record FC signal and compare with TL/FC.01. If needed swap filters and compare again.
4) Activate position feedback on TL/BPM.02
5) Inject in ring, no RF power. Record with high res oscilloscope travel time for different magnets settings. If needed use a mixer.
6) Study the effect of correctors around RI-C2/AE/DP.04
7) Use extraction kicker scan to measure beam travel time after several turns
8) Finish BPM polarities study
9) Repeat (5) and (7) with different RF powers at 2 different frequencies (500.0202MHz and 500.4MHz). Look at oscillations on TbtX and TbtY vs frequency.
|
| Attachment 1: health_check_2023_06_08_09_30.png
|
 |
| Attachment 2: health_check_RF_2023_06_08_09_30.png
|
 |
| Attachment 3: health_check_Vide_2023_06_08_09_30.png
|
 |
| Attachment 4: health_check_Alimentation_2023_06_08_09_31.png
|
 |
|
Draft
|
Wed Apr 2 08:25:07 2025 |
Entered by Marie Jacquet from 88.165.97.136 on Wed Apr 2 08:24:51 2025 | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
Programme mercredi 2/04 | |
9h: mise en chauffe machine depuis bureau (Modulateur, laser, frigo/chiller, cyclage aimants)
Problème sur les Dipôles TL et EL (erreur à acquitter sur place)
Erreurs acquittees
Pas de timing (oscillo plat diode chassi synchro eteinte) - Appel Vincent - J'attends qu'il passe .....
11h30 Fixed frequency and trigger issue - Probleme resolu (bouger frequence dans panneau cavite RF ...)
Modulateur ON
11h59 RF gun phase is 222 dg. Sect. phase is 205 dg., Att. 2.534 dB, linac steerers H [0.75 -2.88], V [-3.36 2.8], Charges: -91 pC, -90 pC, -100 pC
12h05 The beam passed to the ring after the DP ring power supply was reset. Receipt from 20250321_12_30_52.
Problem with RF Cav. interlock - Appel Mohamed
12h40 The “Start RF” button does not start the RF cavity power supply, fixed by restart RF cavity PID
13h15 Beam in the ring, RF gun phase is 222 dg. Sect. phase is 209 dg., Att. 2.47 dB, Charges: -93 pC, -92 pC, -102 pC, RF cav. at 150 kV, phase 24 dg. Freq. 500.10051 MHz, manual shifter 3087, ring chrge stability: 2.4% rms during 220 s
Pb signal synchro cavite FP
14h11 The modulator set to 'Standby' the RF cavity stoped.
14h30 Access to the bunker - pb fixed
14h42 HV is 'ON'
14h57 RF Gun phase is 217 dg., Sect. phase is 209 dg. RF Cav. 150 kV, phase 22.5 dg., Freq. 500.10051 MHz, TL/BPM2 X= 4 mm
X-rays vers 15h30-16h
---------------------------------------------
Programme shift 02/04
A 50 MeV :
** Prendre un spectre en mode SYNCHRO
** Prendre un spectre en mode DESYNCHRO
- completement desynchro = sans aucun pics
- sans changement des conditions anneau)
(le but est de voir si c'est sensiblement different ou non)
FAIT - cf pj ( ...... ??? a expliquer ...)
** Calibration positions fente 2 vs hexa echantillon
** Demarrage commissioning transfocateur avec camera photonic science
Pas demarre
5h45 Stop ThomX
|
| Attachment 1: spectres_synchro_desynchro.png
|
 |
|
250
|
Fri Jan 14 11:10:56 2022 |
Entered by Super Team from 134.158.195.142 on Fri Jan 14 11:10:43 2022 | Fixed | Linac | Diag |
|
Programme journée | |
Programme de la journée (AlexM, ND, SC, 2 étudiants M2) :
- Mesure de charge
- OTR
- Mesure de charge avec BPMs
- Tests DS fréquence
- Test tir unique avec faisceau
|
|
547
|
Wed Sep 14 23:06:40 2022 |
ND, AM, VC, ML, SC | Under Process | Shift summary | Diag | Ring Commissioning |
|
Programme faisceau 15/9 | |
15-09-2022:
Marie Labat, VC, ND, AM
9h30 Mise en chauffe modulateur tombe
10h Mise en cyclage des aimants
10h Modulateur tombe
10h10 PB air comprime, RI/PS/DP aimants en defaut
10h20 Le modulateur ne redemarre pas
10h30 L'alignement de la ligne Cerenkov a été amélioré (point (1) du programme) mais n'est pas terminé.
10h30 L 'une des balises de mesure des radiations est en defaut (2 fois)
11h10 Balise reparee, pb MPS
11h45 C'etait un probleme d'eau arrete (pas de bruit). Il fallait appuyer sur le buton jaune rearm. de l'armoire electrique des pompes.
11h50 Modulateur en chauffe
Pb aimants.
12h20 Cyclage dipoles en cours
13h : Faisceau
13h15 modulateur tombé (redemarrer sans pb)
scan charge-phase => charge Max : 360
Charge energy max : 320
13h45 : modulateur tombé
14h00 Mesures intensité sur les caméras en fonction du retard (point 3 du programme)
17h Jitter sur faisceau en fin de linac et apres dipole
Claquages observés sur les cameras
L'énergie du faisceau est trsè basse (courant dipole à 154 A pour voir le faisceau sur TL/SST .02
18h05 : fin du run
===
Programme pour le faisceau 15/9
*** Accès casemate
1) alignement Cerenkov + retournement des caméras (Démarrage machine à 10h30 au plus tard).
*** Faisceau linac
2) Observation Cerenkov jusqu'à 12h
*** Faisceau LI+TL+EL
3) Mesure intensité vs retard sur chacune des stations SST LI+TL+EL
4) Injection anneau
5) Balayage en temps du Septum. Observation de l'effet sur RI-C1/DG/BPM.02 et BPM.03
6) Balayage en tension du Septum. Observation de l'effet sur RI-C1/DG/BPM.02 et BPM.03
7) Balayage en temps du Kicker. Observation de l'effet sur RI-C1/DG/BPM.03
8) Balayage en tension du Kicker. Observation de l'effet sur RI-C1/DG/BPM.03
9)Try to use TL/PS/STR.04 V+H to try to optimise the trajectory in the ring (I will use the QP values that were saved tonight).
10) Adjust RI-C1/PS/DP to center the beam in the BPMs
11) Use steerers before each BPM to try to center the beam in that BPM. See how far we can go like this...
|
| Attachment 1: 2022-09-15_scan_charge_phase.png
|
 |
|
1030
|
Thu Mar 6 10:38:31 2025 |
Entered by Marie Jacquet from 134.158.205.25 on Thu Mar 6 10:37:50 2025 | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Programme de la journee : preparation des valeurs a remplir | |
1 : Alignement Axe Q1-Q3 avec SCRIPT - Conditions : 5Hz et Q2 = 0
Str1_H =0.49
Str1_V =-3.10
Str2_H =-2.85
Str2_V =3.29
Feedback linac mis sur ON
Mesure avec Q1 Q3 ON
bpmTL1_X =-0.56 / -0.50 / -0.54
bpmTL1_Y =0.02 / 0.04 / 0.01
YagTL1_X =338 / 348 / 347
YagTL1_Y =268 / 269 / 264
2 : Determiner StrTL1_V pour passer au centre de Q4
StrTL1_V=0
Repasser en Linac
bpmTL1_X = pas remesure
bpmTL1_Y = ¨
YagTL1_X = ¨
YagTL1_Y = ¨
3 : Determiner StrTL2_V pour passer au centre de Q5
StrTL2_V = -8.10
4 : Determiner StrTL2_V pour passer au centre de Q6 - Condition : eteindre Q5
StrTL2_V = -7.90
5 : Determiner StrTL2_V pour passer au centre de Q7 - Condition : eteindre Q5 et Q6
Pas possible d'eteindre Q5 et Q6 a la fois. On se met a Q5 =0 et Q6=-4
150 microns de variations avec +/-3 ampere sur Q7
==> centre Q7 ok avec la valeur str de Q6
Courbe ROSE sur la pj
--------------------------------------------------------------------------------------------------------
6 : Refaire de 2. a 5. avec un autre axe LI en modifiant StrLI1_V et/ou StrLI2_V (la position faisceau doit etre bien differente sur YagTL1, autant qu faire se peut)
Str1_H =
Str1_V = -2.60
Str2_H =
Str2_V = 3.29
6/2 : Determiner StrTL1_V pour passer au centre de Q4
StrTL1_V= -5.6
Repasser en Linac
bpmTL1_X = -0.38 / -0.40
bpmTL1_Y = 1.98 / 2.07
YagTL1_X = 402 / 402
YagTL1_Y = 275 / 274
6/3 : Determiner StrTL2_V pour passer au centre de Q5
StrTL2_V = + 8.7
Courbe BLEUE CLAIRE sur la pj
--------------------------------------------------------------------------------------------------------
On recommence encore avec un autre axe
7 : Refaire de 2. a 5. avec un autre axe LI en modifiant StrLI1_V et/ou StrLI2_V (la position faisceau doit etre bien differente sur YagTL1, autant qu faire se peut)
Str1_H =
Str1_V = -3.2
Str2_H =
Str2_V = 3.29
6/2 : Determiner StrTL1_V pour passer au centre de Q4
StrTL1_V= +2.3
Repasser en Linac
bpmTL1_X = -0.34 / -0.33
bpmTL1_Y = -1.19 / -1.18
YagTL1_X = 403 / 403
YagTL1_Y = 256 / 256
6/3 : Determiner StrTL2_V pour passer au centre de Q5
StrTL2_V = ¨-15 ... 17¨ estime car en bout de course
Courbes ROUGE sur la pj (2 courbes pour 2 steerers StrTL2_V differents , mais ca ne change presaue rien)
==> On ne comprend rien (bug code reconstruction peut-etre?)
==================================================
18h Etude kicks faiscau sur LI (Yag et BPM)
Steerers OFF
Soleno 200
Kicks visibles sur Yag (cf screenshot)
Correles avec jauge 2 et jauge 3
Kicks declenches par la jauge 3 (puis la jauge 2 se declenche juste apres) - Vu en direct - Data sauvees
19h fin de shift
===================================================
Post shift : autre reconstruction des axes Quads, avec un code "Marie" - Cf pj
|
| Attachment 1: Compare_Align_ALL.png
|
 |
| Attachment 2: Trend_Position_Yag_Sautes.png
|
 |
| Attachment 3: Jauges_2025-03-06_18-47-14.png
|
 |
| Attachment 4: 2025-03-06-Q1Q3_Q4Q5.pdf
|
|
939
|
Wed Oct 9 08:04:20 2024 |
shift team | Under Process | Shift summary | Linac Commissionning |
|
Production de rayons X | |
demarrage machine 8h
11h: modulateur passe sur "OFF" sans raison apparente.
12h: faisceau en route
Programme :
* injection faisceau dans l'anneau
Phase canon charge max (86°)
Energie Max (36°) avec 100pC
- On essaye d'optimiser l'injection et le stockage car le stockage n'est pas "bon" beaucoup de perte
* Stockage puissance Laser
* Recherche des rayons-X en phase (500MHz, 33MHz)
- Pas de rayons-X visible à première vue. On bouge la table hexapode pour trouve le faisceau
- On scan la table Optique en vertical (en mode désynchro). On trouve les rayonsX vers -1.85mm en Z
- On essaye de synchroniser
Phase 500MHz (ER/CA/RAC.05-API.AO1/A06), 6.2V
Phase 33MHz 265°
Delay scope Laser/Trig : 1.25ns
On fait un scan vertical de la table en désynchronisé (impossible en synchrone)
(~80 pC injecté et ~ 83kW dans la cavité)
* Mesure flux, stabilité spectre des rayons-X
Le flux est assez instable à cause de la machine et ou des jitters de synchronisation (on mesure ~ 0.6-0.7 10^10 ph/s : 15 - 20 10^4 pA)
Vers 18h :
La charge est devenue tres instable vers 18h car le feedback ne fonctionnait plus (etait coché pourtant). On l'a redémarré. Stabilité charge revenue apres.
Idem TBT sum trend plus stable après.
|
| Attachment 1: Scan_vertical_recherche_rayonsX.png
|
 |
| Attachment 2: Synchronized_Xray.png
|
 |
| Attachment 3: tbtsum_trend_all.png
|
 |
| Attachment 4: charge_18h.png
|
 |
|
194
|
Tue Nov 30 17:11:41 2021 |
Entered by Moutardier Alexandre from 134.158.195.144 on Tue Nov 30 17:11:17 2021 | Fixed | Problem | CC |
|
Problème pc client2 | |
Le client 2 a freeze.
Il était impossible de fermer les intefaces ouverte, d'ouvrir un nouveau terminal, de ce déconnecter ...
Parfois il fasait in bruit similaire a celui qu'on n'a lorsque l'on reste appuyé sur la touche retour sur un terminal.
J'ai essayer de me connecter depuis un autre client et la connection ssh ne voulais pas ce faire non plus.
Le pc a était éteint de force. Il semble refonctionner maintenant. |
|
143
|
Fri Oct 29 11:19:51 2021 |
Entered by sophie chance from 134.158.89.243 on Fri Oct 29 11:19:37 2021 | Under Process | Problem | Linac Commissionning |
|
Problème modulateur | |
Scandinova a été contacté, pas de retour pour l'instant.
Harware reset pour voir si cela améliore les choses pour la suite de la journée en attendant la réponse de scandinova
En chauffe pour l'instant. |
|
352
|
Fri Feb 18 13:47:10 2022 |
Entered by Super Team from 134.158.195.141 on Fri Feb 18 13:46:53 2022 | Fixed | Linac | Linac Commissionning |
|
Problème anoxie réglé | |
Plus de défaut d'anoxie, le disjoncteur d'alimentation du détecteur était mis sur off.
Le problème est réglé. |
|
142
|
Fri Oct 29 10:51:38 2021 |
Entered by Moutardier Alexandre from 134.158.195.144 on Fri Oct 29 10:51:23 2021 | Not Fixed | Problem | Linac Commissionning |
|
Problème Modulateur | |
Un interlock modulateur tombe a chaque fois avant que la chauffe ne soit fini.
Maher doit recontater le fabricant et essaye de regler le problème.
En attendant on ne peut rien faire. |
|
321
|
Fri Feb 11 10:57:17 2022 |
Entered by SC/HG/VC from 134.158.195.141 on Fri Feb 11 10:57:02 2022 | Under Process | Linac | Linac Commissionning |
|
Problème DS calc et miroirs | |
Impossible de faire bouger les miroirs
Failed to connect to device calc/sy/freq : impossible d'ouvrir l'interface |
|
322
|
Fri Feb 11 13:30:37 2022 |
Entered by SC/HM/OD/VS from 134.158.195.141 on Fri Feb 11 13:30:23 2022 | Fixed | Linac | Linac Commissionning |
|
Problème DS calc et miroirs | |
Le problème de commande des miroirs laser est résolu.
La procédure après coupure de courant et en cas de problèmes moteurs est :
- Eteindre et rallumer les IcePap en hard (baie 6 et baie 17 pour les miroirs lasers M4 et M5)
- Ouvrir Astor. Aller dans divers/ srv-3
- Restart level 1 de la baie 6 pour le miroir 4 (Icepapcontroller/Icepap-B6)
- Restart level 1 de la baie 17 pour le miroir 5 (Icepapcontroller/Icepap-B17)
- Restart ou start des DSs moteurs level 2 : Icepapcontroller/mot-mir4* et Icepapcontroller/mot-mir5*
|
|
Draft
|
Tue Feb 15 11:13:30 2022 |
Entered by HG/VC/SC from 134.158.195.142 on Tue Feb 15 11:13:17 2022 | Under Process | Problem | Linac Commissionning |
|
Problème wavecatcher | |
Pas de possibilité de visualisation de charge, problème avec WAC01 qui ne fonctionne pas. ICT non fonctionnel.
Re-démarrage en hard effectué sur les Wavecatchers
Timing sont OKs
Fréquence Linac à 10 Hz
|
|
1047
|
Mon Mar 31 09:46:56 2025 |
Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025 | Not Fixed | Problem | Vide |
|
Problem with vacuum in the septum. TL-V3 and EL-V1 are closed. | |
09h45 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.
10h03 Fixed!
10h22 From time to time TO-V3 and EL-V1 close. Septum vacuum is 2.6e-10 |
|
522
|
Fri Jul 29 11:49:54 2022 |
Entered by EG/JNC/VC/SC from 134.158.195.141 on Fri Jul 29 11:49:37 2022 | Under Process | Linac | Linac Commissionning |
|
Prises de données avec faisceau 29/07/2022 | |
10h Démarrage modulateur et chillers
Mise en route du faisceau : trnasport jusqu'au dump à énergie max phase = 88 degres, charge max = 83 pC avec ouverture iris = 2 mm.
Solénoide de focalisation à 180A avec solenoide de focalisation correspondant.
Mise en route du feedback laser de M5.
Positionnement du laser autour de 1060 pixels en x et 660 pixels en y sur li/bpm/las.02
11h50 Début prise de données
12h57 Pause repas modulateur sur standby, gate laser sur false
phase charge max = 129, phase - 50 degres = 79 degres
Asservissement laser M5 en route
li/bpm/las.02 x=1025px y = 625px
Energie 50.22 MeV
Quad scan QP1 =1.6, QP2 = -4.2 scan de Qp3 -0.5 à 4.5 --> epsx = 6.1 mm mrad, epsy = 2.2 mm.mrad
Iris 2 mm
str01-H01 = -1.1A, str01-V01 = 0.5A, COL.02 = 194A
Prise d'images laser et TL/DG/SST.01
Charge = 76 pC à 79 degres
Arret
|
|
1127
|
Fri Sep 19 14:49:23 2025 |
DN, KD, ND | Under Process | Shift summary | Ring | Diag |
|
Prises de données MRSV et Streak camera | |
Matin: Alignement.
Apres midi tentative de voir du faisceau en salle laser.
Faisceau tres faible.
On trouve deux iris dans le chemin optique. Après ouverture, le chemin optique n'est plus bon.
Realignement.
17:35 Arret machine |
|
1099
|
Fri Jul 4 12:02:34 2025 |
ND | | Shift summary | TL |
|
Prise donnees 4/7 | |
Les aimants et les chillers etaient restes allumes.
11h59 Mise en chauffe
12h05 Cyclage aimants
13h40 Demarrage
15h37 Demarrage correction phase RF/laser selon sur temperature eau. (Coef =3.2)
atkpanel CALC/SY/Phase_stabilisation
16h22 Arret correction phase RF/laser selon sur temperature eau.
17h00 Cf plots joints, on voit que la correction stabilise le faisecau en X (points orange) . Il y a des variations regulières en Y à comprendre...
17h02 Demarrage correction phase RF/laser selon sur temperature eau. (Coef =3.4)
17h22 Arret correction phase RF/laser selon sur temperature eau. (Coef =3.4)
L'amelioration semble moins bonne...
18h06: Stop ThomX |
| Attachment 1: temp_vs_time.png
|
 |
| Attachment 2: tp2spX_vs_time.png
|
 |
| Attachment 3: tp2spY_vs_time.png
|
 |
| Attachment 4: pos_TL2_spX_vs_temp.png
|
 |