HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 32 of 62  Not logged in ThomX    logo
ID Date Author Status Type Category Important Subjectdown Icon Text Attachments
  Draft   Tue Apr 25 09:11:29 2023 ND,DN,SC,NE, EMNew SolutionShift summaryRing Quart collectif 25/4 9h10 (ND): Mise en chauffe modulateur et
laser

9h15 mise en chauffe Chiller (SC)
  
  1124   Wed Sep 17 16:56:59 2025 HG, MJFixedShift summaryLI | TL | LE | Ring Quads scans Q3 et Q7 + Courbe energie vs Phase section Modulateur HT @600 V   2025-09-17-Energie_vs_PhaseSection.pdf 
  493   Wed Jul 6 09:03:06 2022 Entered by Super Team from 134.158.195.141 on Wed Jul 6 09:02:45 2022Under ProcessShift summaryDiag | Laser | Linac Commissionning Q beam versus E laser 9H demarrage chauffage Klystron + frigo

9H 10 demarrage chiller canon et
section
  
  Draft   Thu Oct 30 07:21:22 2025 Entered by Marie Jacquet from 134.158.205.9 on Thu Oct 30 07:21:05 2025Under ProcessShift summaryLI | TL | LE | Ring Programme shift (X-rays spectres vs atte & phases) 08h17 Warm-up ThomX: Modulator, Laser,
Fridge

08h24 Chillers were started, cycling
  
  709   Thu Mar 9 00:55:10 2023 ND, Sandry WallonUnder ProcessShift summaryDiag Programme prise de donnée 9/03/2023 9h15 Les stations etaient laissees ouvertes

9h15 Mise en chauffe modulateur

9h30 PSS gele => Appel MO
 health_check_2023_03_09_10_51.pnghealth_check_2023_03_09_11_30.pngscan_charge_phase_min_20.0_max_60.0_12_2_35.png 
  Draft   Thu Oct 27 11:12:33 2022 Entered by Nicolas Delerue from 80.119.21.73 on Thu Oct 27 11:12:17 2022Under ProcessShift summary  Programme prise de donnée 28/10  

 

===
  
  762   Wed Jun 7 16:02:33 2023 LS, MB, VC, NDReference SolutionShift summaryRing Programme prise de donnees 8/06 9:23 Mise en chauffe

Nombreux pb vide dans health check

Acces casemate pour verification
 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png 
  Draft   Wed Apr 2 08:25:07 2025 Entered by Marie Jacquet from 88.165.97.136 on Wed Apr 2 08:24:51 2025Under ProcessShift summaryLinac Commissionning | Ring Commissioning Programme mercredi 2/04 9h: mise en chauffe machine depuis bureau
(Modulateur, laser, frigo/chiller, cyclage
aimants)
 spectres_synchro_desynchro.png 
  250   Fri Jan 14 11:10:56 2022 Entered by Super Team from 134.158.195.142 on Fri Jan 14 11:10:43 2022FixedLinacDiag Programme journée Programme de la journée (AlexM,
ND, SC, 2 étudiants M2) :


Mesure de charge
OTR
Mesure
  
  547   Wed Sep 14 23:06:40 2022 ND, AM, VC, ML, SCUnder ProcessShift summaryDiag | Ring Commissioning Programme faisceau 15/9 15-09-2022:

Marie Labat, VC, ND, AM

9h30 Mise en chauffe modulateur
 2022-09-15_scan_charge_phase.png 
  1030   Thu Mar 6 10:38:31 2025 Entered by Marie Jacquet from 134.158.205.25 on Thu Mar 6 10:37:50 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Programme de la journee : preparation des valeurs a remplir  1 : Alignement Axe
Q1-Q3 avec SCRIPT - Conditions
 Compare_Align_ALL.pngTrend_Position_Yag_Sautes.pngJauges_2025-03-06_18-47-14.png2025-03-06-Q1Q3_Q4Q5.pdf 
  939   Wed Oct 9 08:04:20 2024 shift teamUnder ProcessShift summaryLinac Commissionning Production de rayons X demarrage machine 8h
11h: modulateur passe sur "OFF"
sans raison apparente.
 Scan_vertical_recherche_rayonsX.pngSynchronized_Xray.pngtbtsum_trend_all.pngcharge_18h.png 
  194   Tue Nov 30 17:11:41 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Tue Nov 30 17:11:17 2021FixedProblemCC Problème pc client2 Le client 2 a freeze.
Il était impossible de fermer
les intefaces ouverte, d'ouvrir un nouveau
  
  143   Fri Oct 29 11:19:51 2021 Entered by sophie chance from 134.158.89.243 on Fri Oct 29 11:19:37 2021Under ProcessProblemLinac Commissionning Problème modulateur Scandinova a été contacté,
pas de retour pour l'instant.

Harware reset pour voir si cela
  
  352   Fri Feb 18 13:47:10 2022 Entered by Super Team from 134.158.195.141 on Fri Feb 18 13:46:53 2022FixedLinacLinac Commissionning Problème anoxie réglé Plus de défaut d'anoxie, le
disjoncteur d'alimentation du détecteur
était mis sur off.
  
  142   Fri Oct 29 10:51:38 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Fri Oct 29 10:51:23 2021Not FixedProblemLinac Commissionning Problème Modulateur Un interlock modulateur tombe a chaque
fois avant que la chauffe ne soit fini.

Maher doit recontater le fabricant
  
  321   Fri Feb 11 10:57:17 2022 Entered by SC/HG/VC from 134.158.195.141 on Fri Feb 11 10:57:02 2022Under ProcessLinacLinac Commissionning Problème DS calc et miroirs Impossible de faire bouger les miroirs

Failed to connect to device calc/sy/freq
: impossible d'ouvrir l'interface
  
  322   Fri Feb 11 13:30:37 2022 Entered by SC/HM/OD/VS from 134.158.195.141 on Fri Feb 11 13:30:23 2022FixedLinacLinac Commissionning Problème DS calc et miroirs Le problème de commande des miroirs
laser est résolu.

La procédure après
  
  Draft   Tue Feb 15 11:13:30 2022 Entered by HG/VC/SC from 134.158.195.142 on Tue Feb 15 11:13:17 2022Under ProcessProblemLinac Commissionning Problème wavecatcher Pas de possibilité de visualisation
de charge, problème avec WAC01 qui
ne fonctionne pas. ICT non fonctionnel.
  
  1047   Mon Mar 31 09:46:56 2025 Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025Not FixedProblemVide Problem with vacuum in the septum. TL-V3 and EL-V1 are closed. 09h45 Problem
with vacuum in the septum. TL-V3 and EL-V1
are closed.
  
ELOG V3.1.4-395e101