|
HOME
Prise de donnees
MML
Controle commande
Simulations
Notes
Hardware
Ligne X
Laser Interaction
Diagnostiques
Synchronisation
|
|
Commissionning
Commissionning Preparation
Pannes
ShiftCheck
|
| Toutes les notes concernant les Commissionning de ThomX, Page 25 of 62 |
Not logged in |
 |
|
IC,VM;
|
IC,VM;
|
IC,VM; Beam studies. preparation for 40 MeV
|
IC,VM;
|
IC, VM, VK, ND; RIng commissioning 10x
|
IC, VM, VK, AL, JH; Optimization of the ring 6x
|
IC, VM, VK; Restart and tuning of the injector
|
IC, VM, VK; X-ray generation  
|
IC, VM, ND, VK; Prise de donnee 10/3/2023 7x
|
IC, VM, ND;    
|
IC, VM, DN, MJ;    
|
IC, VM; BBA
|
IC, VM; BBA  
|
IC, VM; Beam studies
|
IC, VM; Ring studies
|
IC, VM;  
|
IC, VM;
|
IC, VM; , entered from 127.0.0.1
|
IC, VM; Work on orbit at 70 MeV for X rays    
|
IC, VM;
|
|