  821   Tue Nov 21 14:29:01 2023 Entered by Nicolas Delerue from 134.158.195.142 on Tue Nov 21 14:28:47 2023 Shift summaryDiag Prise de donnees 21/11 

13:57 Mise en chauffe

15:00 Faisecau

Tests sur les ecrans

17:00 Arret

  820   Mon Nov 20 10:12:05 2023 ND, Nida Riaz, Alfred MishiUnder ProcessShift summaryLI Shift summary 20/11/2023 

9:36 Warm-up

10:13 Acces dekra+infra a l'igloo non signale en salle de controle

10:15 Pont roulant en cours d'utilisation (JNC)

Centrale incendie desactivee depuis 1 semaine.

10:49 Scan charge phase: 194 degrees.

Recette: all_20231024_19_15_29

17:39 Stop the machine

===

Program:

+ Transport to the end of the linac

+ Check TL/SST.01 camera resolution

+ Measure charge

+ Mesure beam size for different quad settings

Transport to the end of EL

Check transport efficiency

Check EL/SST.01 camera resolution

Mesure beam size for different quad settings

 

 

Attachment 1: health_check_2023_11_20_10_49.png
health_check_2023_11_20_10_49.png
Attachment 2: scan_Laser_vs_RF_phase_2023_11_20_10_58.png
scan_Laser_vs_RF_phase_2023_11_20_10_58.png
Attachment 3: centrale_desactivee.jpg
centrale_desactivee.jpg
  819   Fri Nov 17 08:28:18 2023 VC/SCUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | SY | Linac Commissionning | Ring Commissioning Commissionning LE 

8h20 demararage machine

laser PC

Frifo chiller

modulateur

8h40 

chiller gun et section

magnets cycling

9h39 Meme parametre laser qu'hier, prise d'images laser

Phase charge max = 246 degres, on se place à energie max (-50 degres), charge autour de 100 pC

Transport jusqu'à TLSST1 (cf image)

Sur interface de Nicolas, le trend RF du start the beam part 1, ouvre les signaux RFs, il faudrait rajouter aussi le trend des ICTs.

Problème avec les éléments pulsés.

On passe sur des mesures sur le linac, scan des dimensions sur LISST1 : scan_dim_soleno (script LISST1_vs_soleno_v2)

Mesure d'énergie (TLSST1_steerer_energy_dark_v2) avec et sans quadrupoles

11h30 Pause

12h30 Visite des correspondants techniques du bâtiment de la DR04 faite par Jean-Noel

13h55 Reprise Passage phase canon à 188°

14h15 Réunion anneau

15h30 reprise passage phase à 187°, attenuation 1.4dB au lieu de 1.553 dB phi section = 113° au lieu de 116°

Début d'injection mais réglage de la cavité RF nécessaire

Relative Energie spread rms mesurée sans Q4 avec une focalisation non optimisée : 0.56%

Energie au centre de l'écran : 49.9967 MeV

A comparer au dernieres mesures steerers : EsteerersansquadV3 (1er essai 56.02MeV apres dipole 2eme essai 54.50 MeV dossier Esteerer_section)

17h Arret machine

 

 

 

 

 

 

 

  818   Thu Nov 16 08:52:14 2023 SC/IC/JNC/VK/HG/VM AnneauLI | LE | Ring Faisceau anneau point de fonctionnement 

8h52 : mise en chauffe modulateur et chillers, cyclage des aimants

10h15 : Le laser n'est pas centré dans l'iris malgré le feedback

Modification de M5 à la main car non centré dans l'iris malgré le feedback (xposition 38 à 98), yposition non modifiée : 96 prise d'images

10h33 scan charge phase, charge environ 100 pC

Chargement de la recette

Re-réglage linac phase attenuateur etc.... pour arriver à injecter

Faisceau pas à la bonne énergie au départ

Injection faisceau dans l'anneau, problème avec la cavité RF : pas de puissance

Injection anneau

Modulateur à 1090V au lieu de 1100V parce que la position sur apres dipole BPM2LIB2 saut de 4 mm-5mm ensuite le signal sur bpm était mieux et linjection plus stable (difficile distanguer de cout manques).

C'est un problème pour injection et stockage dans l'anneau

A regarder pour résolution du problème avec l'équipe RF ?

Point de fonctionnement identique au 24/10 sauf le soleno qui est à 220A au lieu de 180A.

En regardant moniteur d'injection (screenshot), on peut penser que les sauts sont corrélés aux sauts obervés sur BPM2-TL2. Ils sont aussi corrélés à une mise à zéro des icts.

Prise de données anneau

Comportement etonnant du faisceau à 16h25 environ, apparition de signaux incohérent sur ICT

16h27 Perte du faisceau (cf screenshot de la charge) + Interlock sur la cavité RF + modification de l'énergie du faisceau nécessaire de bouger la valeur de l'attenuateur pour retrouver le faisceau en sortie de ligne de transfert.

16h50 Reprise de la prise de donnée anneau, redémarrage de la cavité RF (JNC), nouvelle valeur atténuateur section (1.7 à 1.5 dB environ = variation d'énergie)

Observation d'un saut de phase sur oscilloscope qui pourrait expliquer

16h58 A nouveau modification du comportement du faisceau, perte de charge sur ICT3, modification de la position du faisceau sur bpm2lib2, Changement de la position du faisceau sur tl/bpm2lib2,

Faisceau revenu à la normale on ne sait pas pourquoi

17h30 Arret faisceau

 

 

 

 

 

 

Attachment 1: Screenshot_from_2023-11-16_14-48-02.png
Screenshot_from_2023-11-16_14-48-02.png
Attachment 2: Screenshot_from_2023-11-16_14-49-27.png
Screenshot_from_2023-11-16_14-49-27.png
Attachment 3: Screenshot_from_2023-11-16_16-40-05.png
Screenshot_from_2023-11-16_16-40-05.png
  817   Wed Nov 15 09:13:06 2023 KD, MJ, RCUnder ProcessShift summaryLI | TL | LE | Ring | Laser | Opt | SY shift du 15 novembre 2023 

9h : mise en chauffe de la machine

12h: intervention Iryna et Slava pour un meilleur stockage dans l'anneau (recette semaine passé)

Recherche de la phase et du bucket Laser/e-

- X trouvé (cf. screen shots et datas) :

* bucket Laser/trigger = 21.5ns (visu au scope)

* Dephaseur 500MHz (ER/CA/RAC.05-API.AO1) : 5.3 V (à affiner)

* Cavité trop instable avec le lock sur la fréquence RF (délock en moins de qq minutes)

 

*** Passage dans la EL (uniquement jusqu'au BPM) avec :

qp1 qp2 qp3 = 1.5   -2.6   0.7

kicker 5840 V retard -7.96

dpi 0.8 A

dp 160.1 A

--> TBTSUM ne peut pas etre utilise pour estimer la charge entrante anneau / sortante anneau car : TBTSUM sortant > TBTSUM entrant (cf screenshot de 15h44)

 

*** Mesure de la taille e- a l'IP avec table FPC - Fin de journee, a voir si ces mesures permettent d'extraire taille e-

 

*** Remarques ***

- Beaucoup de claquage au niveau du modulateur/Klystron (cf. TL/BPM.02 trend)

*** Programme ***

- Optimization du flux de rayons X (ajustement phase/synchro, ajustement position laser)

- passage dans la Ligne d'Extraction

Attachment 1: Screenshot_2023-11-15_16-40-54.png
Screenshot_2023-11-15_16-40-54.png
Attachment 2: Screenshot_2023-11-15_17-38-44.png
Screenshot_2023-11-15_17-38-44.png
Attachment 3: pico_I1_Xsearch.dat
# DATASET= "xli/op/tmd.01/i1[0]"
# SNAPSHOT_TIME= 2023-11-15_17:17:07.459186
2023-11-15_15:27:53.556484	274.074815821472
2023-11-15_15:27:53.656761	274.074815821472
2023-11-15_15:27:53.757046	272.7549293088239
2023-11-15_15:27:53.857399	272.7549293088239
2023-11-15_15:27:53.956674	272.7549293088239
2023-11-15_15:27:54.056986	272.7549293088239
2023-11-15_15:27:54.157231	272.7549293088239
2023-11-15_15:27:54.256462	274.25029206303793
2023-11-15_15:27:54.356794	274.25029206303793
2023-11-15_15:27:54.457050	274.25029206303793
2023-11-15_15:27:54.557337	274.25029206303793
2023-11-15_15:27:54.656632	274.25029206303793
2023-11-15_15:27:54.756926	273.1249552964738
2023-11-15_15:27:54.857279	273.1249552964738
2023-11-15_15:27:54.956542	273.1249552964738
2023-11-15_15:27:55.056818	273.1249552964738
2023-11-15_15:27:55.157091	273.1249552964738
2023-11-15_15:27:55.257369	274.2846243711704
2023-11-15_15:27:55.356737	274.2846243711704
2023-11-15_15:27:55.457037	274.2846243711704
2023-11-15_15:27:55.557300	274.2846243711704
2023-11-15_15:27:55.656560	274.2846243711704
2023-11-15_15:27:55.756824	272.4688267410533
2023-11-15_15:27:55.857143	272.4688267410533
2023-11-15_15:27:55.956415	272.4688267410533
2023-11-15_15:27:56.056710	272.4688267410533
2023-11-15_15:27:56.157014	272.4688267410533
2023-11-15_15:27:56.257297	274.99034403833775
2023-11-15_15:27:56.356630	274.99034403833775
2023-11-15_15:27:56.456904	274.99034403833775
2023-11-15_15:27:56.557192	274.99034403833775
2023-11-15_15:27:56.656496	274.99034403833775
2023-11-15_15:27:56.756779	274.97127053381973
2023-11-15_15:27:56.857143	274.97127053381973
2023-11-15_15:27:56.956413	274.97127053381973
2023-11-15_15:27:57.056666	274.97127053381973
2023-11-15_15:27:57.156974	274.97127053381973
2023-11-15_15:27:57.257252	275.60832558472214
2023-11-15_15:27:57.356554	275.60832558472214
2023-11-15_15:27:57.456793	275.60832558472214
2023-11-15_15:27:57.557075	275.60832558472214
2023-11-15_15:27:57.657292	275.60832558472214
2023-11-15_15:27:57.756568	271.6105190377417
2023-11-15_15:27:57.856877	271.6105190377417
2023-11-15_15:27:57.957194	271.6105190377417
2023-11-15_15:27:58.056485	271.6105190377417
2023-11-15_15:27:58.156783	271.6105190377417
2023-11-15_15:27:58.257064	273.5216841904489
2023-11-15_15:27:58.356455	273.5216841904489
2023-11-15_15:27:58.456722	273.5216841904489
2023-11-15_15:27:58.556999	273.5216841904489
2023-11-15_15:27:58.657293	273.5216841904489
2023-11-15_15:27:58.756589	273.9260424862313
2023-11-15_15:27:58.856962	273.9260424862313
2023-11-15_15:27:58.957273	273.9260424862313
2023-11-15_15:27:59.056547	273.9260424862313
2023-11-15_15:27:59.156821	273.9260424862313
2023-11-15_15:27:59.257126	273.453019574184
2023-11-15_15:27:59.356492	273.453019574184
2023-11-15_15:27:59.456765	273.453019574184
2023-11-15_15:27:59.556997	273.453019574184
2023-11-15_15:27:59.657327	273.453019574184
2023-11-15_15:27:59.756634	273.73912214195457
2023-11-15_15:27:59.856973	273.73912214195457
2023-11-15_15:27:59.957236	273.73912214195457
2023-11-15_15:28:00.056530	273.73912214195457
2023-11-15_15:28:00.156833	273.73912214195457
2023-11-15_15:28:00.257151	271.69444245762105
2023-11-15_15:28:00.356484	271.69444245762105
2023-11-15_15:28:00.456794	271.69444245762105
2023-11-15_15:28:00.557097	271.69444245762105
2023-11-15_15:28:00.656394	271.69444245762105
2023-11-15_15:28:00.756703	275.0551939536991
2023-11-15_15:28:00.857053	275.0551939536991
2023-11-15_15:28:00.956395	275.0551939536991
2023-11-15_15:28:01.056712	275.0551939536991
2023-11-15_15:28:01.156934	275.0551939536991
2023-11-15_15:28:01.257069	272.4688267410533
2023-11-15_15:28:01.356502	272.4688267410533
2023-11-15_15:28:01.456776	272.4688267410533
2023-11-15_15:28:01.557045	272.4688267410533
2023-11-15_15:28:01.657289	272.4688267410533
2023-11-15_15:28:01.756550	273.93748658894214
2023-11-15_15:28:01.856900	273.93748658894214
2023-11-15_15:28:01.957192	273.93748658894214
2023-11-15_15:28:02.056486	273.93748658894214
2023-11-15_15:28:02.156776	273.93748658894214
2023-11-15_15:28:02.257103	273.2889874353289
2023-11-15_15:28:02.356430	273.2889874353289
2023-11-15_15:28:02.456709	273.2889874353289
2023-11-15_15:28:02.556985	273.2889874353289
2023-11-15_15:28:02.657284	273.2889874353289
2023-11-15_15:28:02.756588	274.3914359964714
2023-11-15_15:28:02.856975	274.3914359964714
2023-11-15_15:28:02.957231	274.3914359964714
2023-11-15_15:28:03.056504	274.3914359964714
2023-11-15_15:28:03.156781	274.3914359964714
2023-11-15_15:28:03.257056	273.06392008201607
2023-11-15_15:28:03.356420	273.06392008201607
2023-11-15_15:28:03.456715	273.06392008201607
2023-11-15_15:28:03.556948	273.06392008201607
2023-11-15_15:28:03.657262	273.06392008201607
2023-11-15_15:28:03.756564	274.57454163984454
2023-11-15_15:28:03.856875	274.57454163984454
2023-11-15_15:28:03.957186	274.57454163984454
2023-11-15_15:28:04.056440	274.57454163984454
2023-11-15_15:28:04.156731	274.57454163984454
2023-11-15_15:28:04.257000	273.27372863171445
2023-11-15_15:28:04.357359	273.27372863171445
2023-11-15_15:28:04.456683	273.27372863171445
2023-11-15_15:28:04.557010	273.27372863171445
2023-11-15_15:28:04.657277	273.27372863171445
2023-11-15_15:28:04.756596	273.540757694967
2023-11-15_15:28:04.856966	273.540757694967
2023-11-15_15:28:04.957278	273.540757694967
2023-11-15_15:28:05.056545	273.540757694967
2023-11-15_15:28:05.156830	273.540757694967
2023-11-15_15:28:05.257089	272.95710845671505
2023-11-15_15:28:05.356422	272.95710845671505
2023-11-15_15:28:05.456685	272.95710845671505
2023-11-15_15:28:05.556961	272.95710845671505
2023-11-15_15:28:05.657245	272.95710845671505
2023-11-15_15:28:05.756560	274.61650334978424
2023-11-15_15:28:05.856881	274.61650334978424
2023-11-15_15:28:05.957156	274.61650334978424
2023-11-15_15:28:06.056386	274.61650334978424
2023-11-15_15:28:06.156623	274.61650334978424
2023-11-15_15:28:06.256947	272.8007057196672
2023-11-15_15:28:06.357299	272.8007057196672
2023-11-15_15:28:06.456594	272.8007057196672
2023-11-15_15:28:06.556863	272.8007057196672
2023-11-15_15:28:06.657187	272.8007057196672
2023-11-15_15:28:06.756458	273.9222277853277
2023-11-15_15:28:06.856782	273.9222277853277
2023-11-15_15:28:06.957054	273.9222277853277
2023-11-15_15:28:07.057329	273.9222277853277
2023-11-15_15:28:07.156607	273.9222277853277
2023-11-15_15:28:07.256845	272.4611973392461
2023-11-15_15:28:07.357117	272.4611973392461
2023-11-15_15:28:07.456296	272.4611973392461
2023-11-15_15:28:07.556587	272.4611973392461
2023-11-15_15:28:07.656908	272.4611973392461
2023-11-15_15:28:07.757228	275.4404787449634
2023-11-15_15:28:07.856582	275.4404787449634
2023-11-15_15:28:07.956845	275.4404787449634
2023-11-15_15:28:08.057174	275.4404787449634
2023-11-15_15:28:08.156451	275.4404787449634
2023-11-15_15:28:08.256701	272.1560212669575
2023-11-15_15:28:08.357026	272.1560212669575
2023-11-15_15:28:08.457334	272.1560212669575
2023-11-15_15:28:08.556586	272.1560212669575
2023-11-15_15:28:08.656892	272.1560212669575
2023-11-15_15:28:08.757187	272.7625587106311
2023-11-15_15:28:08.856513	272.7625587106311
2023-11-15_15:28:08.956786	272.7625587106311
2023-11-15_15:28:09.057058	272.7625587106311
2023-11-15_15:28:09.156342	272.7625587106311
2023-11-15_15:28:09.256649	274.5974298452662
2023-11-15_15:28:09.356969	274.5974298452662
2023-11-15_15:28:09.457298	274.5974298452662
2023-11-15_15:28:09.556546	274.5974298452662
2023-11-15_15:28:09.656840	274.5974298452662
2023-11-15_15:28:09.757152	272.6061559735832
2023-11-15_15:28:09.856476	272.6061559735832
2023-11-15_15:28:09.956750	272.6061559735832
2023-11-15_15:28:10.057042	272.6061559735832
2023-11-15_15:28:10.156362	272.6061559735832
2023-11-15_15:28:10.256641	274.1511098395441
2023-11-15_15:28:10.356972	274.1511098395441
2023-11-15_15:28:10.457241	274.1511098395441
2023-11-15_15:28:10.556516	274.1511098395441
2023-11-15_15:28:10.656851	274.1511098395441
2023-11-15_15:28:10.757126	272.5527501609327
2023-11-15_15:28:10.856462	272.5527501609327
2023-11-15_15:28:10.956706	272.5527501609327
2023-11-15_15:28:11.056958	272.5527501609327
2023-11-15_15:28:11.157209	272.5527501609327
2023-11-15_15:28:11.256953	274.03666881243595
2023-11-15_15:28:11.356331	274.03666881243595
2023-11-15_15:28:11.456604	274.03666881243595
2023-11-15_15:28:11.556843	274.03666881243595
2023-11-15_15:28:11.657077	274.03666881243595
2023-11-15_15:28:11.756319	273.5483870967742
2023-11-15_15:28:11.856646	273.5483870967742
2023-11-15_15:28:11.956916	273.5483870967742
2023-11-15_15:28:12.057205	273.5483870967742
2023-11-15_15:28:12.156500	273.5483870967742
2023-11-15_15:28:12.256789	273.00669956846195
2023-11-15_15:28:12.357160	273.00669956846195
2023-11-15_15:28:12.456432	273.00669956846195
2023-11-15_15:28:12.556709	273.00669956846195
2023-11-15_15:28:12.656980	273.00669956846195
2023-11-15_15:28:12.757219	273.9222277853277
2023-11-15_15:28:12.856549	273.9222277853277
2023-11-15_15:28:12.956831	273.9222277853277
2023-11-15_15:28:13.057113	273.9222277853277
2023-11-15_15:28:13.156404	273.9222277853277
2023-11-15_15:28:13.256705	272.6023412726796
2023-11-15_15:28:13.357024	272.6023412726796
2023-11-15_15:28:13.457295	272.6023412726796
2023-11-15_15:28:13.556566	272.6023412726796
2023-11-15_15:28:13.656872	272.6023412726796
2023-11-15_15:28:13.757176	274.03285411153234
2023-11-15_15:28:13.856468	274.03285411153234
2023-11-15_15:28:13.956700	274.03285411153234
2023-11-15_15:28:14.056968	274.03285411153234
2023-11-15_15:28:14.157274	274.03285411153234
2023-11-15_15:28:14.256556	273.5140547886417
2023-11-15_15:28:14.356884	273.5140547886417
2023-11-15_15:28:14.457136	273.5140547886417
2023-11-15_15:28:14.556474	273.5140547886417
2023-11-15_15:28:14.656814	273.5140547886417
2023-11-15_15:28:14.757052	273.96037479436376
2023-11-15_15:28:14.856345	273.96037479436376
2023-11-15_15:28:14.956621	273.96037479436376
2023-11-15_15:28:15.056892	273.96037479436376
2023-11-15_15:28:15.157172	273.96037479436376
2023-11-15_15:28:15.256447	273.1554729037026
2023-11-15_15:28:15.356761	273.1554729037026
2023-11-15_15:28:15.457020	273.1554729037026
2023-11-15_15:28:15.557292	273.1554729037026
2023-11-15_15:28:15.656563	273.1554729037026
2023-11-15_15:28:15.756837	272.9799966621367
2023-11-15_15:28:15.857124	272.9799966621367
2023-11-15_15:28:15.956413	272.9799966621367
2023-11-15_15:28:16.056658	272.9799966621367
2023-11-15_15:28:16.156989	272.9799966621367
2023-11-15_15:28:16.257303	274.1663686431586
2023-11-15_15:28:16.356626	274.1663686431586
2023-11-15_15:28:16.456897	274.1663686431586
2023-11-15_15:28:16.557173	274.1663686431586
2023-11-15_15:28:16.656434	274.1663686431586
2023-11-15_15:28:16.756709	272.7511146079203
2023-11-15_15:28:16.857076	272.7511146079203
2023-11-15_15:28:16.956315	272.7511146079203
2023-11-15_15:28:17.056597	272.7511146079203
2023-11-15_15:28:17.156911	272.7511146079203
2023-11-15_15:28:17.257179	272.9304055503898
2023-11-15_15:28:17.356528	272.9304055503898
2023-11-15_15:28:17.456795	272.9304055503898
2023-11-15_15:28:17.557060	272.9304055503898
2023-11-15_15:28:17.656350	272.9304055503898
2023-11-15_15:28:17.756624	274.5478387335193
2023-11-15_15:28:17.856982	274.5478387335193
2023-11-15_15:28:17.957215	274.5478387335193
2023-11-15_15:28:18.056504	274.5478387335193
2023-11-15_15:28:18.156827	274.5478387335193
2023-11-15_15:28:18.257092	273.10206709105216
2023-11-15_15:28:18.356413	273.10206709105216
2023-11-15_15:28:18.456714	273.10206709105216
2023-11-15_15:28:18.556953	273.10206709105216
2023-11-15_15:28:18.657263	273.10206709105216
2023-11-15_15:28:18.756526	464.82130510454664
2023-11-15_15:28:18.856886	464.82130510454664
2023-11-15_15:28:18.957154	464.82130510454664
2023-11-15_15:28:19.056472	464.82130510454664
2023-11-15_15:28:19.156775	464.82130510454664
2023-11-15_15:28:19.257030	273.62849581574994
2023-11-15_15:28:19.356374	273.62849581574994
2023-11-15_15:28:19.456637	273.62849581574994
2023-11-15_15:28:19.556903	273.62849581574994
2023-11-15_15:28:19.657163	273.62849581574994
2023-11-15_15:28:19.756470	274.1511098395441
2023-11-15_15:28:19.856829	274.1511098395441
2023-11-15_15:28:19.957122	274.1511098395441
2023-11-15_15:28:20.056368	274.1511098395441
2023-11-15_15:28:20.156670	274.1511098395441
2023-11-15_15:28:20.256956	272.68626469255895
2023-11-15_15:28:20.357256	272.68626469255895
2023-11-15_15:28:20.456525	272.68626469255895
2023-11-15_15:28:20.556824	272.68626469255895
2023-11-15_15:28:20.657147	272.68626469255895
2023-11-15_15:28:20.756474	420.05579000071526
2023-11-15_15:28:20.856844	420.05579000071526
2023-11-15_15:28:20.957108	420.05579000071526
2023-11-15_15:28:21.056423	420.05579000071526
2023-11-15_15:28:21.156743	420.05579000071526
2023-11-15_15:28:21.256676	273.1669170064135
2023-11-15_15:28:21.356444	273.1669170064135
2023-11-15_15:28:21.456701	273.1669170064135
2023-11-15_15:28:21.556979	273.1669170064135
2023-11-15_15:28:21.657293	273.1669170064135
2023-11-15_15:28:21.756553	275.1925231862289
2023-11-15_15:28:21.856882	275.1925231862289
2023-11-15_15:28:21.957143	275.1925231862289
2023-11-15_15:28:22.056415	275.1925231862289
2023-11-15_15:28:22.156804	275.1925231862289
2023-11-15_15:28:22.257086	272.04539494075294
2023-11-15_15:28:22.356384	272.04539494075294
2023-11-15_15:28:22.456612	272.04539494075294
2023-11-15_15:28:22.556884	272.04539494075294
2023-11-15_15:28:22.657134	272.04539494075294
2023-11-15_15:28:22.756438	297.5581145840784
2023-11-15_15:28:22.856764	297.5581145840784
2023-11-15_15:28:22.957035	297.5581145840784
2023-11-15_15:28:23.056308	297.5581145840784
2023-11-15_15:28:23.156590	297.5581145840784
2023-11-15_15:28:23.256867	273.2279522208712
... 65240 more lines ...
Attachment 4: ri-c1_dg_bpm.02-lib.03_tbtsum.dat
# DATASET= "ri-c1/dg/bpm.02-lib.03/tbtsum"
# SNAPSHOT_TIME= 2023-11-15_17:40:01.349767
0.0	12980969.0
1.0	13050255.0
2.0	13276450.0
3.0	13509630.0
4.0	13192362.0
5.0	13498144.0
6.0	13544940.0
7.0	12514236.0
8.0	6030154.0
9.0	770772.0
10.0	701051.0
11.0	486523.0
12.0	600571.0
13.0	1351314.0
14.0	25099982.0
15.0	58769910.0
16.0	48190087.0
17.0	43998639.0
18.0	42506852.0
19.0	43542601.0
20.0	41854215.0
21.0	42810233.0
22.0	42939644.0
23.0	42069186.0
24.0	43076036.0
25.0	42712638.0
26.0	42003672.0
27.0	42851171.0
28.0	41635893.0
29.0	41395522.0
30.0	42293262.0
31.0	40463059.0
32.0	40190395.0
33.0	40949816.0
34.0	39360445.0
35.0	38895533.0
36.0	39686256.0
37.0	38645595.0
38.0	38373030.0
39.0	38860599.0
40.0	38236507.0
41.0	37760424.0
42.0	38346007.0
43.0	37916580.0
44.0	37631087.0
45.0	38432025.0
46.0	37957915.0
47.0	37974655.0
48.0	38775405.0
49.0	37739676.0
50.0	37927450.0
51.0	38386792.0
52.0	37728169.0
53.0	38233098.0
54.0	38531120.0
55.0	37833220.0
56.0	38420138.0
57.0	38320865.0
58.0	37689086.0
59.0	38268760.0
60.0	38014930.0
61.0	37234821.0
62.0	37643457.0
63.0	37476014.0
64.0	36953064.0
65.0	37519703.0
66.0	37200292.0
67.0	36495418.0
68.0	36950350.0
69.0	36983397.0
70.0	36404578.0
71.0	36859125.0
72.0	36500158.0
73.0	36384885.0
74.0	36624883.0
75.0	36524163.0
76.0	36322177.0
77.0	36578173.0
78.0	36462210.0
79.0	36372893.0
80.0	36704742.0
81.0	36413790.0
82.0	36626405.0
83.0	36955715.0
84.0	36454834.0
85.0	36723062.0
86.0	36735990.0
87.0	36365391.0
88.0	36421496.0
89.0	36533559.0
90.0	35997672.0
91.0	35951681.0
92.0	36064532.0
93.0	35725449.0
94.0	35744106.0
95.0	35776617.0
96.0	35620206.0
97.0	35824092.0
98.0	35463120.0
99.0	35343605.0
100.0	35416628.0
101.0	35490704.0
102.0	35361629.0
103.0	35531865.0
104.0	35282894.0
105.0	35093648.0
106.0	35168387.0
107.0	35160271.0
108.0	35224284.0
109.0	35605176.0
110.0	35430188.0
111.0	35379950.0
112.0	35600154.0
113.0	35449167.0
114.0	35299246.0
115.0	35477320.0
116.0	35288905.0
117.0	35170008.0
118.0	35343215.0
119.0	35012704.0
120.0	34832168.0
121.0	35079087.0
122.0	35017391.0
123.0	34764448.0
124.0	34707064.0
125.0	35005822.0
126.0	34687273.0
127.0	34716465.0
128.0	34779597.0
129.0	34594991.0
130.0	34618538.0
131.0	34671310.0
132.0	34414319.0
133.0	34417561.0
134.0	34496599.0
135.0	34522816.0
136.0	34559233.0
137.0	34741591.0
138.0	34832870.0
139.0	34800065.0
140.0	34571370.0
141.0	34703575.0
142.0	34752268.0
143.0	34421832.0
144.0	34447848.0
145.0	34499500.0
146.0	34491256.0
147.0	34531905.0
148.0	34369492.0
149.0	34118954.0
150.0	34348901.0
151.0	34307235.0
152.0	34164129.0
153.0	34131080.0
154.0	33970856.0
155.0	33983255.0
156.0	34089870.0
157.0	34087341.0
158.0	33944585.0
159.0	34096869.0
160.0	34035872.0
161.0	33933222.0
162.0	33947426.0
163.0	34197035.0
164.0	34108859.0
165.0	34128576.0
166.0	34203379.0
167.0	34236245.0
168.0	34275575.0
169.0	34081569.0
170.0	34102262.0
171.0	34060632.0
172.0	34132823.0
173.0	33920245.0
174.0	33773616.0
175.0	33646824.0
176.0	33474619.0
177.0	33756785.0
178.0	33670418.0
179.0	33656943.0
180.0	33626831.0
181.0	33597245.0
182.0	33614802.0
183.0	33655652.0
184.0	33598513.0
185.0	33555010.0
186.0	33651876.0
187.0	33637122.0
188.0	33430173.0
189.0	33506965.0
190.0	33744388.0
191.0	33631441.0
192.0	33759066.0
193.0	33741106.0
194.0	33490636.0
195.0	33673888.0
196.0	33540546.0
197.0	33909490.0
198.0	33821622.0
199.0	33639467.0
200.0	33577981.0
201.0	33748006.0
202.0	33834911.0
203.0	33550190.0
204.0	33488611.0
205.0	33490447.0
206.0	33510405.0
207.0	33427598.0
208.0	33432487.0
209.0	33344124.0
210.0	33115879.0
211.0	33131276.0
212.0	33184865.0
213.0	33224565.0
214.0	33311949.0
215.0	33112693.0
216.0	33083067.0
217.0	33106195.0
218.0	33274861.0
219.0	33370761.0
220.0	33435270.0
221.0	33344442.0
222.0	33355760.0
223.0	33440969.0
224.0	33394076.0
225.0	33437929.0
226.0	33458737.0
227.0	33172329.0
228.0	33229852.0
229.0	33311333.0
230.0	33436661.0
231.0	33278200.0
232.0	33351802.0
233.0	32996600.0
234.0	33081654.0
235.0	33096349.0
236.0	33129460.0
237.0	33070956.0
238.0	32822604.0
239.0	32757318.0
240.0	32820772.0
241.0	32872282.0
242.0	32953407.0
243.0	33035721.0
244.0	33051772.0
245.0	32928770.0
246.0	32995623.0
247.0	33054625.0
248.0	33200880.0
249.0	33304632.0
250.0	33255412.0
251.0	33206693.0
252.0	33109150.0
253.0	33135041.0
254.0	33259510.0
255.0	33399785.0
256.0	33226872.0
257.0	33170283.0
258.0	33073336.0
259.0	33119453.0
260.0	33049758.0
261.0	32946916.0
262.0	32851445.0
263.0	32914560.0
264.0	32724975.0
265.0	32876842.0
266.0	32842023.0
267.0	32793655.0
268.0	32562408.0
269.0	32751076.0
270.0	32880111.0
271.0	32605949.0
272.0	32663662.0
273.0	32818193.0
274.0	32750576.0
275.0	32798306.0
276.0	32850462.0
277.0	32955060.0
278.0	33039462.0
279.0	32994296.0
280.0	33108217.0
281.0	33003870.0
282.0	32791885.0
283.0	32847882.0
284.0	33013968.0
285.0	32801961.0
286.0	32700561.0
287.0	32785009.0
288.0	32786504.0
289.0	32652862.0
290.0	32728946.0
291.0	32723497.0
292.0	32831532.0
293.0	32585955.0
294.0	32708750.0
295.0	32811399.0
296.0	32658550.0
297.0	32665180.0
... 704 more lines ...
Attachment 5: oscilloscope_RI.png
oscilloscope_RI.png
Attachment 6: Screenshot_from_2023-11-15_15-44-28.png
Screenshot_from_2023-11-15_15-44-28.png
  816   Tue Nov 14 11:09:41 2023 Entered by Nicolas Delerue from 157.136.192.228 on Tue Nov 14 11:09:26 2023 InfoDiag Intervention WAC 

10:50 Appel salle de contrôle. Pas de réponse.

Connexion à distance pour regarder les WAC.

Les réglages de déclenchement de ER/CA/RAC.05-ELR.01-WAC.01 et ER/CA/RAC.05-ELR.01-WAC.03 étaient incorrects. C'est corrigé.

11:20 Fin intervention

  815   Thu Nov 9 09:02:39 2023 KDReference SolutionShift summaryLI | TL | LE | Ring | Diag | CC | Laser | Opt | RF Anneau | SY | Linac Commissionning | Ring Commissioning shift du 09 novembre 2023 

8h30 : démarrage machine (laser, klystron, chiller, frigo, aimant)

* Beaucoup de problème de rédémarrage. Les delays au niveau des wavecatcher ne sont toujours pas bons (pas de signal de charge visible).

* Problème sur le géné 33MHz à la mauvaise fréquence (en Hz au lieu d'être au MHz) empécher le système de synchronisation de fonctionner (pas de Trig).

* Problème sur la puissance en sortie du synthé 500MHz RI, rédémarrage effectué (ce qui à engendré un problème sur le Géné 33MHz qui n'était plus synchrone du 10MHz).

==> mise en place d'une recette d'injection dans l'anneau, basée sur la recette précédente (recipe_recipe_LI_TL_RI_all_20230928_15_43_43.txt) et sur le nouveau point photoCathode trouvé les semaines précédente. Injection à  optimisée car le stockage est "plat" sur 100ms mais il y a peu de charge stocké (qq 10^6 sur les BPM)
recette sauvée sous : recipe_recipe_LI_TL_RI_good_20231109_15_00_00.txt

* Il semblerait que la consigne de phase au niveau du LLRF de la cavité RF ne fonctionne pas.

 

15h30 : arrêt machine

 

*** Programme ***

- Allumer les équipements au fur et à mesure pour voir l'influence sur le lock de la cavité FP

Tout les équipements ont été allumé un par un jusqu'au stockage dans l'anneau, peu d'effets sont visible sur le stockage de la cavité. Quelques perturbations difficiles à identifiés se sont produite de façon intermitentes.

- Synchroniser la cavité à l'anneau

Un problème sur le signal de synchronisation est apparu et a été résolu (une alimentation d'un ampli sur le signal d'erreur de la cavité). Par manque de temps la cavité n'a pas été asservis sur l'horloge machine.

Le DS pour le moteur de la cavité n'est toujours pas ajouté à JIVE malgrè un ticket ouvert depuis 2 semaine

- Optimiser la synchronisation e-/laser

  814   Fri Nov 3 10:02:49 2023 Entered by Super Team from 134.158.195.141 on Fri Nov 3 10:02:34 2023 ProblemLI ThomX aujourd'hui 

10h02 : ce matin intervention de Dalkia, coupure de la ventilation, signal sonore en salle de controle, affichage debit ventilation insuffisant.

Remise en route à 11h ?

Problème laser pompe qui ne s'allume pas, Viktor investigue.

Aujourd'hui, livraison du laser de PERLE, ouverture des portes pour le rentrer dans l'igloo, heure de livraison non connue.

Pas de faisceau aujourd'hui

10h30 : tentative de redemarrage des DSs des cameras : impossible de redemarrer le server via astor ou via healthcheck, error server camera sur toutes les cameras sauf TL/DG/SST.01 (cf image)

Meme probleme sur camera laser

11h30 Camera laser en route, problème résolu (cf image) merci Philippe.

13h09 L'ampli Laser ne démarre pas (cf message Viktor), debit ventilation toujours insuffisant.

13h50 Retour de Dalkia pour remise en route de la ventilation, demande de leur hiérarchie de couper la ventilation pour cause de coupure électrique. Probablement une erreur.

14h15 Mise en chauffe modulateur pour tests RFs, mise en route frigo et chillers

Tests de certains IHMs et DSs associés :

Refroidissement + Chillers : ok

Modulateur : HT = 1090V, trig ok

Alimentations : LI + TL ok sans les dipoles

Caméras LI/TL + moteurs : ok

Pas d'acces à ThomX script pour la fermeture de la machine (probablement un redémarrage est nécessaire)

 

Résumé :

Uniquement courant obscurité ce jour

L'ampli laser ne fonctionne pas : demande envoyée à Amplitude

Les DSs testés fonctionnent sur la partie Linac

ThomX script ne s'ouvre pas

Tests en charge de l'igloo lundi (8h30/9h)

 

 

 

 

Attachment 1: erreur_server_images.png
erreur_server_images.png
Attachment 2: image_cameras_ok.png
image_cameras_ok.png
  813   Thu Nov 2 16:52:14 2023 Entered by Super Team from 134.158.195.141 on Thu Nov 2 16:51:56 2023 InfoLI Restauration Base de donnée TANGO 

Restauration de la base de donnée TANGO faite aujourd'hui.

Tests des DSs prévus demain matin. Redémarrage des DSs nécessaires avant via astor.

 

  812   Mon Oct 30 09:39:05 2023 MaherNot FixedProblemInfra eau refroidissement circuit principal 

Bonjour

J'ai trouvé ce matin ( lundi 30/10 ) la pompe du circuit de refroidissement en défaut, je n'ai pas pu la redémarrer !

Maher

  811   Fri Oct 27 10:13:28 2023 ND, Marie Labat Shift summaryDiag Prise de donnee Cerenkov 

9:30 Mise en chauffe

10:00 git pull

Alignement laser sur camera a balayage

Solenoide 220A

11:00 Alumage faisceau

Recette TL_LE_test_20231026_11_25_43

11:15 Faisceau observe sur camera a balayage

12:30 Pause

14:00 Recherche signaux declenchement.

La voie A1 de la baie 39 n'etait pas connectee.

Recherche de signal... Appel Hamamatsu...

17:00 Signal synchrone observee (cf image) mais problemes a comprendre avec la camera (signal 125MHz après déphaseur très déformé).

18:00 Arret machine

 

Attachment 1: health_check_2023_10_27_10_42.png
health_check_2023_10_27_10_42.png
Attachment 2: scan_Laser_vs_RF_phase_2023_10_27_11_02.png
scan_Laser_vs_RF_phase_2023_10_27_11_02.png
Attachment 3: 2023-10-27_11_22_44_tl_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
2023-10-27_11_22_44_tl_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
Attachment 4: IMG_20231027_172554_3_copy_1040x780-20231027-174432192-20231027-174432230.jpg
IMG_20231027_172554_3_copy_1040x780-20231027-174432192-20231027-174432230.jpg
Attachment 5: IMG_20231027_174336_1_copy_1040x780-20231027-17443216-20231027-17443250.jpg
IMG_20231027_174336_1_copy_1040x780-20231027-17443216-20231027-17443250.jpg
Attachment 6: IMG_20231027_174343_1_copy_1040x780-20231027-174431845-20231027-174431889.jpg
IMG_20231027_174343_1_copy_1040x780-20231027-174431845-20231027-174431889.jpg
  810   Thu Oct 26 09:02:33 2023 VC,SC, ND, IC, VK, CB, V LinacLI | TL | Ring Linac 

8h30 Mise en chauffe

Pas d'internet sur client1 et client2

9:45 Pb Database Tanngo.

10:10 Ticket 13100 mis au CC

10:16 Le CC constate le probleme.

10:20 Defaut centrale SSI intermittent

10h57 Defaut tango camera corrigé partiellement, permettant de faire du faisceau aujourd'hui, mais investigation plus poussée à faire

10h58 Re-démarrage des caméras

11h12 phase foc max = 215° phase utilisée 165°

12h Chargement recette de l'anneau, remise en place des solenoides comme avant changement de la veille, remise en place du laser et réglage anneau et stockage à 500.25 MHz

13h30 remise en route dephasage cavité RF, remise en place de la valeur de la phase

14h58 Stockage dans l'anneau apres mesures linac

Mise en place des réglages linac d'hier pour tests sur injection anneau

réajustement des valeurs de steerers TL pour optimisation de l'injection.

prises des images dans ces conditions et données anneau

Préparation de 180A en modifiant QP2 et 3 uniquement. A tester sur l'anneau

Quad scan à 180A et à 220A

Arret

  809   Wed Oct 25 08:59:10 2023 CB LinacLI Linac 

Température canon à 31.75° modifiée hier

8h59 Mise en chauffe modulateur et chillers

Tests interface start for ring

Scan charge phase, foc max à 221°, charge max à priori à 219°

Laser : Iris = 0.8 mm, Prise d'images dans dossier image laser, feedback on, position iris = (5.1,2.55)

Chargement de la recette d'hier, mode linac, pas de dipole meme si indiqué sur la recette.

11h15 modification du faisceau sur yag TL/DG/SST.01 (forme transverse complétement différente en visuel sur la caméra plus décalage du faisceau vers la droite en regardant la caméra)

Prise d'Image sur TL/DG/SST.01 phi=171°

Pause

A faire cette apres midi : scan d'emittance

(0.24V) le réfléchi disparait par intermittence sur le RF_plot

Scan emittance philaser 171°(dim_QP3_180A) et philaser 165° (dim_QP3_180A_2) philaser 173° (dim_QP3_180A_3) variation QP3 de -1 à 1 A, et QP1=1.8A, QP2=-2.2A 

Scan dim_QP1_180A -2A < QP1 < 2A phi section = 111°

philaser 172° Phi section 118° :

dim_QP2_180A

dim_QP3_180A_4 scan de QP3 de -2A à 2A

phase canon et section ajustée sur l'écran LT SST2 spot min sans quads sans steerers TL phase gun 172, phase section 105

On refait un scan avec uniquement QP3 sur TL_SST1 à ces valeurs ( dim_QP3_5)

Positionnement au centre de l'écran sur TL/DG/SST.02, Rotation du faisceau observée lors de la mise en route de QP5
Faisceau au centre de l'écran équivaut à un décalage dans les bpms de quelques millimètre (cf dossier bpm_centrage du répertoire Mesure/today)

Scan de QP4 observé sur TL/SST.02 sans autres quads (QP1, QP2 et QP3 sont à zéro), TL/PS/STR.01-V.01 = -2A tous les autres steerers de la TL sont à zéro. (steerers de la LI identiques à précedemment)

Mise en place des valeurs des quadrupoles de la recette anneau à 500.25 MHz en gardant les réglages linac d'aujourd'hui. Prise d'image sur TL/SST.03 et enregistrement recette.

--> Recette test TL + LE enregistré avec les valeurs des quadrupoles anneau de 500.25 MHz, un seul steerer pour toute la TL.

Solenoide à 220A au lieu de 180A, visu sur camera TL/SST.02, 

Phase laser = 172°, phase phase section = 105° attenuateur section 1.855dB

Demain : demarrage sur le point avec soleno 180A, vérification des phases et chargement de la recette presque sans steerer avec les valeurs quads et soleno donné par l'équipe anneau

Injection dans l'anneau reprise si nécessaire manuelle des steerers 3 et 4. Constatation ensemble des décalages bpms écrans dans la TL.

 

 

 

 

 

  808   Tue Oct 24 10:58:26 2023 CB,KD,SC LinacLI | Linac Commissionning Linac 

8h30 Mise en chauffe modulateur (MO)

Problème synchro, Intervention

10h30 Réglage du laser dans l'iris avec M5, iris = 0.8 pour etre homogene, taille de sigx = 0.22 et sigy = 0.23mm rms. feedbackM4  mis en route à 5.24/2.91mm

Charge phase

HT modulateur = 1090 V

Mise en route cavité RF

Passage de la position laser avec M4 de (5.24,2.91) à (4.92,2.35)

Position moteur soleno initiale : LI/AE/COL.01-MOT.01 = 0.8 mm; LI/AE/COL.01-MOT.02 = 3.3 mm; LI/AE/COL.02-MOT.01 = 10.201 mrad ; LI/AE/COL.02-MOT.02 = -4.9 mrad; 

recherche position sur celle du courant d'obscurité : 5.1/2.55

scan charge phase@14h27, Qmax @200degrés, et focmax @ 207 degrés

Alignement Laser PhotoCathode :

* On utilise le courant d'obscurité pour centrer le photo-courant (à la phase de focalisation max), cf. figure projections

* Le faisceau semble plus symétrique et ne bouge pas à l'écran LI/SST1 à quelques pixels près (sauf en vertical, dérive de 50pixel pour 10° de phase à partir de la focalisation max)

* Nouvelle valeur position Laser : Horizontal : 5.1mm, Vertical : 2.55mm

réalignement soleno : LI/AE/COL.01-MOT.01 = 1.32 mm; LI/AE/COL.01-MOT.02 = 3.32 mm; LI/AE/COL.02-MOT.01 = 7.58 mrad ; LI/AE/COL.02-MOT.02 = -3 mrad; 

Mesure d'énergie sortie Canon (phase focalisation max - 50°) : 4.96 MeV (1090V) et 4.98 MeV (1100V), phase 159 degrés pour référence par rapport au charge phase

Scan dim VS Solénoide  ci joint, zoom fait avec 10% of full intensity --> pas de saturation mais image très bruitée

solenoide à 189A, reglage steerer li = 1h= 0.9, 1V -0.7, 2H -1.7A, 2V 1 A

scan QP3 pour QP1= +1.8, et qp2=-2.2A, sterers linac : li = 1h= 1.5, 1V -1.9, 2H -2A, 2V 1.9 A 

Start scans of QP3 tomorow recette sauvée linac + TL straight (laser pos : 5.1/2.55), and energy spread tuning

 

 

 

 

 

Attachment 1: profiles_darkandbeam.png
profiles_darkandbeam.png
Attachment 2: solenoscan16h05.png
solenoscan16h05.png
Attachment 3: solenoscan16h32.png
solenoscan16h32.png
  807   Fri Oct 20 15:12:39 2023 VC, Marie Labat, NDUnder ProcessShift summaryLI | Diag Mesures pour la streak 

14:12 Mise en chauffe

15:12 Faisceau

Recette 20230929_17_49_07

15:28 Signal Streak Observe.

15:35 Attenuateur laser ajuste pour charge a 100pC

17:00 Signal observe sur la streak en mode focus (asynchrone). Cf ci-joint.

Tentative en mode synchrone sans succes. À continuer la semaine prochaine...

 

Attachment 1: signal_Cerenkov.jpg
signal_Cerenkov.jpg
  806   Wed Oct 18 10:08:24 2023 KD, MJ, HG, DN, IC, & al.Reference SolutionShift summaryLaser | Opt | SY | Linac Commissionning | Ring Commissioning shift du 18 octobre 2023 

10h : mise en chauffe de la machine (chillers, modulateur, laser, alims).

*** Programme ***

- Stockage des e- et puissance laser

* Stockage dans l'anneau immédiat avec la recette (ajustement linac : phase et attenuateur, pres)

* Problème avec la cavité RF, phase étrange (faisceau tué après quelque us) ==> il faut aller loin dans le scan de phase

* injection réajusté par Iryna

* Cavité locké à 8kW 

- synchronisation CFP sur horloge machine (une fois les rayons-X trouvés/observés en mode désynchro)

* rayons-X trouvé (4pA dans le détecteur fluo)

*  essaye de synchronisation (rebranchement du cable 33MHz CFP) ==>  pas assez de signal ==> ajout d'un ampli dans la synchroBOX

- scan du buket RF (scan déphaseur 500MHz CFP avec compensation déphaseur 33MHz CFP)

* Impossoble de faire des scans : pas assez de stabilité (juste pour retrouver la phase RF avec la cavité

- scan des numéros de bucket

* changement du programme CPLD (une basule) pour ne pas etre synchrone avec le 33MHz (33x33 ==> 41MHz)

==> on ne trouve rien également le changement du bucket RF n'est pas assez régulier. Mais on dégrossis la phase 500MHz (environ 7V sur le dephaseur 500MHZ CFP)

* Remise du programme CPLD précédent : (33x33 ==> 33x41 ==> 41MHz avec ligne à retard externe)

* scan du bucket RF avec le géné 33MHz (24° à 33MHz = 360° à 500MHz)

==> ca marche et c'est répétable il faut pour cela :

** mesurer la phase entre le 33MHz CFP et le trig (pour avoir le bucket RF)

1) Locker la cavité CFP sur le 500MHz

2) "mesurer" le bucket accroché (aujourd'hui, trig pris dans l'igloo et le 33MHz CFP en sorti de déphaseur 0V de consigne)

3) déphaser le géné pour retrouver le bucket RF correct (équivalent à 26.5ns de delai entre le trig et le 33MHz CFP), la phase de référence sur le géné était de 53.5°

recommencer à chaque délock de la cavité.  

==> on gagne un facteur 100 au niveau du flux. A affiner, il manque un facteur 10 qui peut venir de : jitter synchro ou CFP ?

La puissance laser et la charge stockée sont pris en compte au niveau du signal de référence en non synchronisé (3-4 pA), on doit avec la synchro avoir un facteur 1000 environ.

 

17h35 : arret machine 

Attachment 1: Screenshot_2023-10-18_17-15-49.png
Screenshot_2023-10-18_17-15-49.png
Attachment 2: scrprint.png
scrprint.png
  805   Wed Oct 11 09:07:49 2023 KDReference SolutionShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 11 octobre 2023 

9h: mise en chauffe de la machine

* injection dans l'anneau avec la recette 500.25MHz

* lock de la cavité et rayons-X retrouvé (en désynchronisé)

* essaie de synchroniser la cavité sur le 500.25MHz et scan en phase

==> beaucoup de problème technique (cable de controle de la phase 33MHz débranché, stabilité de la machine)

* X synchronisés non stable car le schéma de synchronisation ne verrouille pas le numéro du bucket RF de l'anneau (asynchrone sur le 33MHz, synchro utilisé : 8x8 ==> 41MHz)

     -  de pic plus régulier apparaissent puis disparaissent (surement en fonction de la synchronisation "glissante" entre le 41MHz et le 33MHz)

==> imposible de trouver une phase correcte avec un flux important régulier

* changement de la synchro (8x8 ==> 41x33 ==> 41MHz)

==> déphaseur 33MHz sur le laser CFP (le géné fait office de déphaseur quand la machine est sans la CFP)

* impossible en l'état de faire un scan sur le bucket du 500MHz :

     - changement de 500MHz implique un changement de phase du 33MHz et donc un changement sur la phase du trigger de la machine ==> donc changement de phase au niveau de la cavité RF

     - il faut compenser le changement de phase 500MHz (CFP) par un changement de phase 33MHZ (CFP)

    - Puis changer de numeros de bucket RF et recommencer le scan sur le 500MHz

17h30 : arrêt machine

 

*** Programme ***

- Locker la cavité FP sur la fréquence anneau

- Trouver la phase du bucket RF 500MHz

- estimer le flux de rayons-X

- essayer de synchroniser totalement la machine

- trouver le bon numéro du bucket RF

- estimation du flux de rayons-X

  804   Tue Oct 10 13:47:16 2023 MJ KD Shift summaryLinac Commissionning | Ring Commissioning Essai de validation synchro electron / laserFPC 

** 500.25 MHz anneau

** laser locke tres instable

** Vers 13h : IP retrouvee pour z table = -2.75 mm (position non optimisee, le lock est trop instable ) - Signal diode fluo ~5 pA en desynchro (5-6 kW FPC avec delock constant, stockage anneau "moyen")

     cf screenshot 14-21-43

** Demarrage recherche de phase . Pas encore ca mais ca fremit un peu : qq pics avec intensite des ~30-50 fois plus haute qu'en mode desynchro

     cf screenshot 17-38-46

 

On continue demain

Attachment 1: 2023-10-10_14-21-43.png
2023-10-10_14-21-43.png
Attachment 2: 2023-10-10_17-38-46.png
2023-10-10_17-38-46.png
  Draft   Tue Oct 10 13:46:06 2023 KD MJ Shift summary    
  Draft   Tue Oct 10 09:02:36 2023 KDReference SolutionShift summaryLinac Commissionning | Ring Commissioning shift du 10 octobre 2023 

9h: mise en chauffe de la machine

- La clé PA est resté enclenchée, les lumières allumées. Qui a pris la machine hier ?

11h15 Démarrage de l'archivage. 

 

*** Programme ***

- Stockage anneau à 500.25MHz

- Stockage puissance CFP (> 10kW) 

- chercher les rayons-X en désynchronisé à 500.25MHz

- synchroniser la machine (Anneau + CFP)

- Estimation du flux obtenu en synchronisé