Entry   ND, Nida Riaz, Alfred Mishi; Shift summary 20/11/2023 health_check_2023_11_20_10_49.pngscan_Laser_vs_RF_phase_2023_11_20_10_58.pngcentrale_desactivee.jpg
Entry   VC/SC; Commissionning LE 
Entry   SC/IC/JNC/VK/HG/VM; Faisceau anneau point de fonctionnement Screenshot_from_2023-11-16_14-48-02.pngScreenshot_from_2023-11-16_14-49-27.pngScreenshot_from_2023-11-16_16-40-05.png
Entry   KD, MJ, RC; shift du 15 novembre 2023 6x
Entry   Entered by Nicolas Delerue from 157.136.192.228 on Tue Nov 14 11:09:26 2023; Intervention WAC 
Entry   KD; shift du 09 novembre 2023 
Entry   Entered by Super Team from 134.158.195.141 on Fri Nov 3 10:02:34 2023; ThomX aujourd'hui erreur_server_images.pngimage_cameras_ok.png
Entry   Entered by Super Team from 134.158.195.141 on Thu Nov 2 16:51:56 2023; Restauration Base de donnée TANGO 
Entry   Maher; eau refroidissement circuit principal 
Entry   ND, Marie Labat; Prise de donnee Cerenkov 6x
Entry   VC,SC, ND, IC, VK, CB, V; Linac 
Entry   CB; Linac 
Entry   CB,KD,SC; Linac profiles_darkandbeam.pngsolenoscan16h05.pngsolenoscan16h32.png
Entry   VC, Marie Labat, ND; Mesures pour la streak signal_Cerenkov.jpg
Entry   KD, MJ, HG, DN, IC, & al.; shift du 18 octobre 2023 Screenshot_2023-10-18_17-15-49.pngscrprint.png
Entry   KD; shift du 11 octobre 2023 
Entry   MJ KD; Essai de validation synchro electron / laserFPC 2023-10-10_14-21-43.png2023-10-10_17-38-46.png
Entry   KD MJ;  
Entry   KD; shift du 10 octobre 2023 
Entry   KD; run du 6 octobre 2023 