HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 21 of 58  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Entered by Viktor Soskov from 134.158.195.153 on Mon Jan 15 10:41:24 2024; Laser status 
Entry   ND; Redémarrage diags + synchro health_check_Diag_2024_01_11_14_54.pnghealth_check_2024_01_11_14_55.png
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Wed Dec 13 11:13:19 2023; Changement fréquence linac 
Entry   Entered by Nicolas Delerue from 134.158.195.144 on Tue Dec 12 12:48:44 2023; Changement de frequence linac Screenshot_from_2023-12-12_12-57-04.png
Entry   VC,ND; Tests synchro 
Entry   VC, ND; Tests synchro 
Entry   SC/KD; Faisceau LE 
Entry   Entered by Nicolas Delerue from 134.158.195.142 on Tue Nov 21 14:28:47 2023; Prise de donnees 21/11 
Entry   ND, Nida Riaz, Alfred Mishi; Shift summary 20/11/2023 health_check_2023_11_20_10_49.pngscan_Laser_vs_RF_phase_2023_11_20_10_58.pngcentrale_desactivee.jpg
Entry   VC/SC; Commissionning LE 
Entry   SC/IC/JNC/VK/HG/VM; Faisceau anneau point de fonctionnement Screenshot_from_2023-11-16_14-48-02.pngScreenshot_from_2023-11-16_14-49-27.pngScreenshot_from_2023-11-16_16-40-05.png
Entry   KD, MJ, RC; shift du 15 novembre 2023 6x
Entry   Entered by Nicolas Delerue from 157.136.192.228 on Tue Nov 14 11:09:26 2023; Intervention WAC 
Entry   KD; shift du 09 novembre 2023 
Entry   Entered by Super Team from 134.158.195.141 on Fri Nov 3 10:02:34 2023; ThomX aujourd'hui erreur_server_images.pngimage_cameras_ok.png
Entry   Entered by Super Team from 134.158.195.141 on Thu Nov 2 16:51:56 2023; Restauration Base de donnée TANGO 
Entry   Maher; eau refroidissement circuit principal 
Entry   ND, Marie Labat; Prise de donnee Cerenkov 6x
Entry   VC,SC, ND, IC, VK, CB, V; Linac 
Entry   CB; Linac 
ELOG V3.1.4-395e101