  864   Tue May 21 08:33:12 2024 MEK, SC, KD, IC, MOUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 21/05 

8h15 impossible de mettre " standby" du modulateur ==> la pompe de refroidissement n'est en marche

un message a été envoyé à urgence cvc" <urgence.cvc@ijclab.in2p3.fr> pour intervenir pour mettre en marche la pompe

Air comprimé en arret

10h15 mise en marche de la pompe

10h18 mise en marche du modulateur

démarrage de conditionnement @ 1.4 dB (Pis= 18 MW )

 

12h50  1.2dB clacage ...

 

on remonte à 1.4dB avant de redescendre à 1.2dB

point dur...

13h22 : passage à 1.1dB, ça claque

14h22 : passage à 2 dB

difficile de franchir le 1.1 dB (Pis =19.95 MW) @ 1µs et 1Hz

on passe @ 0.5 µs & 1 Hz on arrive à franchir le 1.1 dB

on baisse progressivement l'atténuation de 0.05 dB 

on est @0.5dB (Pis =23 MW)

15h55 on baisse progressivement pour arriver a 0.15 dB ( Pis= 25 MW) @ 0.5 µs & 1 Hz  (position moteur=zero)

16h05 on passe @ 1 µs & 1 Hz (2 dB pour aller a 0 dB) Difficile rester @1 dB sans claquages.

16h30 on passe à 2µs & 1Hz

on commence à 10 dB  puis descend rapidement par pas de 0.2 dB et à partir de 4 dB  on descent lentement  jusqu'à 3dB (Pis=13 MW)

17h45 fin de conditionnement : Att. section 3dB (Pis =13 MW) @2µs & 1Hz

 

** Problème atténuateur :

   - Quand à 0 pas moteur (warning fin de course)

   - le DS de calcul en dB de l'atténuation ne marche plus ==> moteur bloqué

   ==> mouvement manuel du moteur atténuateur (via DS icepap) puis mise d'une atténuation dans le DS de calcul en dB

 

** Pour éviter les problème le moteur de l'atténuateur du Canon a été mis en off.

 

 

 

  863   Fri May 17 08:08:29 2024 MEK SC SV DNUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 17/05 

set to standby modulateur 8h05

demarrage modulateur à 9h

impossible de passer à 1220V pour 3.9-5dB d'atténuation (Pis = 10 MW)

retour à 5 dB puis redescente à 3.95dB

descente progressive par pas de 0.1dB

9:35 Sens du backlash dans l 'attenuateur mis a -40pas pour eviter les surpuissances lors des changements d'attenuation

micro claquages fin section @ Att. section 3 dB (Pis incident section =13 MW) ==> Apparition des pics de vide (sans interlock vide)au moment de microclaquages

11h50: passage à 2dB mais claquage visible sur la puissance transmise. à 1.9dB les claquages sont visible sur l'incident et font interlocker le modulateur.

12h: gros claquage à 1.8dB, repassage à 1.9dB mais ne tiens pas, 2dB non plus. Remise à 3dB pour déscente douce

12h05: 2dB ==> mise en standby pour la pause méridienne

13h30: ==> mise en place d'attenuateur chaine mesure reflechi section.

14h00: redémarrage à 2dB (Pis=16 MW)

18h13 arret de conditionnement @ att. section 1.4 dB (Pis= 18 MW) largeur impulsion 1µs freq repetition 1Hz

  862   Thu May 16 08:38:19 2024 MEK, RC,VC, VKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 16/05 

conditionnement démmare à 7.4 dB atténuation section ( ) pour une largeur impulsion RF 1µs et fréquence de repetition de 1Hz

10h : disjonction du PA @ Att=5.6dB (Pis = 7 MW)
remise en etat du PA

multiples coupures HF à cause d'interlocks du vide en fin de section (seuil interlock vide = 1e-7 mbar)

10h10 : il n'y a plus d'interlocks @ Att=6.1dB => on reste à cette attenuation
mais nombreuses remontées de vides en fin de section ~ 3e-7 mbar avec vide moyen ~ 1e-7 mbar

10h50 : le vide en fin de section est retombé < 3e-8
on recommence la montée en puissance => Att = 5.4dB => effets de claquage

11h05 : disjonction du PA @ Att=5.4dB
remise en etat du PA @ Att=8dB !!! sinon ça claque !

on recommence la montée en puissance.

11h10 : seuil d'interlock du vide changé @ 5e-7 mbar => ça devrait interlocker vide moins souvent

11h20 : vide ~ 2e-8 mbar jusqu'à Att=5.6dB => remontée max du vide en bout de section > 1e-7

11h20 : disjonction du PA @ Att=5.6dB
remise en etat du PA @ Att=8dB puis remontée rapide @ Att=6.6dB
=> remontée max du vide en bout de section > 1e-7 => on reste à cette puissance.

12h15 : vide max en bout de section < 1e-7
=> on monte la puissance : @ Att=6dB
=> remontée max du vide en bout de section > 1e-7 => on reste à cette puissance.

13h : vide max en bout de section < 1.5e-7
=> on monte la puissance : @ Att=5.5dB
=> remontée max du vide en bout de section > 1.5e-7 => on reste à cette puissance.

13h30 : vide max en bout de section < 1.5e-7
=> on monte la puissance : @ Att=4.8dB (Pis = 8.7MW) => claquages => on reste à cette puissance

13h35 : remontée max du vide en bout de section > 5e-7 => on diminue la puissance @ Att=5.5dB

14h14 : passage à 5.45dB

le "backlash" de l'atténuateur sur guide est dans le mauvais sens !!! on dépasse la consigne de puissance avant  de revenir!!!! à corriger rapidement

14h22 passage à 5.40dB

14H53 passage à 5,35dB

15h03 passage à 5,1dB

15h11 passage à 5dB

15h14 passage à 4,9dB

15h39 passage à 4,8dB

15h53 passage à 4,7dB

15h58 passage à 4,6dB

16h11 passage à 4,5dB

16h15 passage à 4,4dB

16h25 passage à 4,3dB

16h26 passage à 4,2dB

16h32 passage à 4,1dB

claquage on remonte à 4.4dB

16h45 on repasse à 4.1dB

16h50 on repasse à 4dB

17h30 on repasse à 3.95dB ( Pis=10 MW)

 

 

 

 

 

 

 

 

 

 

  861   Thu May 16 07:59:36 2024 KDUnder ProcessShift summaryLinac Commissionning Conditionnement section 16/05 

8h: démarrage Klystron, frigo et chiller

  860   Wed May 15 15:23:14 2024 MEK, HG, DNNot FixedProblemLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 

Disjonction de PA 15h00=

Disjonction de PA 15h36

Etape 1 conditionnement : 1µs @1Hz jusqu'à   ? dB

Beaucoup degazage autour  de valeur l'atténuation section 7.5 dB ( Pik = 35 MW (1220 V)===> Pis = 5MW)

impossible d'ouvrir fenetre setting et fenetre automated RF conditionning

  859   Wed May 15 10:52:19 2024 Entered by Super Team from 134.158.195.141 on Wed May 15 10:51:59 2024 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 

sortie PA 120W ---> pas assez pour obtenir la puissance nominale Klystron, sortie puissance PA devrait etre autour de 400 W

Pb resolu : un connecteur etait mal serre sur le synthétiseur change lundi 13mai 2024

impossible de démarrer le DS conditionning

 

 

  858   Tue May 14 17:50:45 2024 Entered by Marie Jacquet from 134.158.89.45 on Tue May 14 17:50:15 2024 Ligne XLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Camera PILATUS: instructions to use 
  857   Tue May 14 11:12:18 2024 ND, MEKUnder ProcessShift summaryRF D1 Conditionnement section 

8:45 Impossible de passer le modulateur en standby.

Probleme d'eau.

Appel Dalkia

Git pull

10:00 Intervention du vide dans l 'anneau. Perte de la ronde.

10:30 Dalkia est intervenu (sans nous prevenir)

Toujours impossible de passer le modulateur en standby.

Ronde refaite.

11:15 Redemarrage du PC de controle du modulateur

11:20 Passage du modulateur en stand by

Attention lorsque le modulateur est arreté il n  y a plus interlock vide ===> l'atténuateur continue de baisser  ==> danger lorsque le modulateur reearmer avec atténuation basse ==> penser à modifier le code

 

17h45 probleme disjonction PA arret machine

PA remis en état

  Draft   Thu Mar 7 08:58:28 2024 VK, VM, ICUnder ProcessShift summaryRing Commissioning Recomissioning of the SR, search for the X-rays 

8h50 Warming up the machine

Problem with the vaccum around the RF cavity (see screenshot attached). Intervention of vacuum team is needed.

Mohamed is installing the powermeter to monitor the incomingt RF power for the accelerating structure.

Laser camera should be checked before the beam start-up

Due to the vaccum cable connector we can not start the beam.

  855   Wed Mar 6 08:49:56 2024 IC, VM, VKUnder ProcessShift summaryRing Commissioning X-ray generation 

8h50 Warming up the machine

10h start the beam

Tuning the injector

Beam is injected in the ring.

Problem to start the RF cavity (no injected power, the delta f jumps a lot and the motor position can not converge). Mohamed is contacted.

Problem to restart the DS for the control of the FP cavity table. The CC team is contacted. We are waiting for intervention.

Check of the Ring frequency

11h25 Modulator on stand by

Thanks to Kevin and Mohamed the RF cavity is OK. Restqrt of te beam.

In parallel, Vincent, Ronic and Kevin are investigating the sunchro with the FPC.

The injector is very unstable in energy (random slow change on the TL BPM 2 + usual problem with attenuator ) and LIL phase change/drift (from 114 to 88 deg. during the day). Presence of misstrigering from time to time during the day.

For a certain parameters, a good storage was obtained. But then, due to change of injector parameters the conditions were not kept. Work on the BBA.

Very difficult to work in such conditions, especially on BBA.

 

  854   Tue Mar 5 15:10:32 2024 IC, VM, VKUnder ProcessShift summaryRing Commissioning Restart and tuning of the injector 

10h Intervention to repair the water leakage. It was repaired.

New problem with vacuum pomp is found in the ring. The two problems are due to the water leakage. Intervention is ongoing.

12h Warm up of the machine

14h30 Start up of the machine in the mode LI-TL-EL. Goal: tune the injector and perform the measurements.

Mistriggering. All interfaces to see the current freauency do not respond.

Intervention of synchronization team is needed to continue.

15h30 Stop the beam for vacuum intervention .

  853   Mon Mar 4 08:58:01 2024 Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024Under ProcessShift summaryRing | Ring Commissioning Recomissioning of the SR, search for the revolution frequency  

08h50 Start up of the machine

- Problem  with the vaccum, the valves around the RF cavity are down. Eric came. He checked and the problem is with the cable. it should be changed. Intervention is ongoing.

- The water leakage is detected on teh Ring RF cavity. Intervention of Mohamed and Jean-Noel is needed. Jean-Noel is informed  about the problem.

- Synchro problem. Jitter at FPCavity scope screen. Vincent is working on that.

  852   Fri Mar 1 11:11:17 2024 Entered by Viktor Soskov from 134.158.89.70 on Fri Mar 1 11:10:55 2024FixedProblemLaser laser status 

Bonjour,

actuellement le contrôle du shutter (gate) du laser est dispo seulement avec le jive - Atkpanel laser.

Viktor.

  851   Fri Mar 1 10:39:04 2024 VK, VM, IC on Thu Feb 29 Under ProcessShift summaryRing | Ring Commissioning Recomissioning of the SR, search for the revolution frequency  

Start of the machine 9h

Optimization of the beam transport to the Ring.

Work on the lattice of the Ring and search for the revolution frequency.

Attempt to perform teh BBA

At 16h beam is taken by Linac team (CB/JNC)

 

 

  850   Fri Mar 1 10:30:38 2024 VK, VM, ICUnder ProcessShift summaryRing | Ring Commissioning Recomissioning of the SR, search for the revolution frequency  

8h50 Start of the machine

Laser amplifier was somehow OFF. Very strange situation and not clear why it happen. To be understood.

Call Viktor, who came and start the laser.

Start the beam. No beam. No e- from gun. Call Vincent.

Many instabilities in e-beam signals.

Retuning Linac, attenuator =2.114  for 50 MeV (why ??? calibration problem ?)

Work on orbit correction, starting from natural one. Slight optics tuning. Frequency 500.067 MHz. The hor. tune is 0.18

Small horizontal, small vertical steerers.

At some aatenuator or frequency values, the energy jitter appears and a lot of mistriggers.

Good storage obtained. Recipie saved : recipe_recipe_LI_TL_RI_good_20240301_15_50_35.txt

For TL orbit and Ring Orbit see screenshots.

 

 

 

 

 

 

16.10 Stop machine. Ronic, Daniele need access for FP Cavity.

 

 

 

  849   Thu Feb 29 16:27:53 2024 CB/JNC Shift summaryLinac Commissionning shift linac 29/02/2024 

changement de quelques paramètres : att laser 410 au lieu de 350, iris 0.9 au lieu de 1.3

Canon : phase max foc 273, phase max E 216deg, image prise à 232A dans le répertoire LTSST_232A

E streerer 4.92MeV

faisceau sur TL SST --> micro-coupre d'électricité, modulateur off

arret à 22h10

  848   Wed Feb 28 08:49:30 2024 VC, VM, VKUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Commintionning RING 

demarrage machine 8H50

Alim

EL/PS/DPI.01 demarrage à la main (ATK pannel)

ET/PS/DPI.01 demarrage à la main (ATK pannel)

Healthcheck OK 9H

ThomX warmup done.... wainting for modulator (around 9H50)

 

Beam from RF gun is double kernel.

Start without RF. Search corrrect settings for TL: energy, position, dipole.

Store orbit; Freq =500.0685 . RF on 100 Kv

Orbit is the same with and wo RF

12.30 Maher put dosimetry in bunker

Fine scan in RF +- 3 kHz. Horizonatal Tune 0.17

Beam at TL becomes unstable after 14h. See screenshot. Data taken. We could not solve this problem , it is wery confusing to work with such energy jitter.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  847   Tue Feb 27 09:10:47 2024 KD, VK, VMUnder ProcessShift summaryRing Commissioning run du 27 février 2024 

9h: mise en chauffe de la machine (chillers, laser, aimants, modulateur)

Mohamed regle la cavité RF sur 500.06MHz

  846   Mon Feb 26 09:07:06 2024 VC, VK, VM, IC, NDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning redemarage machine après élongation anneau 

9H démarrage machine en mode linac

chauffage klystron ok

chiller ok

redpitaya 4 baie 17 en défaut (ne redemarrage pas avec healthcheck)

dans ASTOR   redpitaya/redpitaya4-b17 et redpitaya/redpitaya3-b17 ne réponde pas  => redemarrage Hard nécessaire (IHM camera power)

cyclage aimants en route  => OK

pB temerature section   consigne 29.5°C => régulation à 30.3°C 

redemarrer les DS "synchro status"

10H machine prete

 

Load New ring optics.

Search for the new ring frequency. Optimize injection

12h30 Visit JM Horodynsky

Scan search for the new ring frequency from 500.1  MHz with step 1.5kHz

Tune phase and energy at each frequency once settled tuning.

 

 

 

 

 

 

 

  845   Fri Feb 23 09:05:28 2024 SC/JNC LinacLI redemarrage linac apres elongation anneau 

9h05 Mise en chauffe modulateur et refroidissements temperature consigne canon = 31.75 degres temperature consigne section = 29.5 degres

9h45 demarrrage ampli laser

Ronde fosse Nord non faite, la fosse nord est peine d'eau en bas à partir du premier escalier, quelques cms.

12h Ronde fosse nord ok, mais il y a beaucoup plus d'eau dans la fosse aux endroits habituels.

12h21 PSS Autorisé, Tir autorisé

12h27 Modulateur en trig, laser allumé

Apres reglage des quadrupoles faisceau tout petit

Scan de QP3

Scan en energie à 1.5dB attenuation section et phisection = 120°

Mesure energie : environ 47 MeV

On passe à 2dB section et on re-règle pour mesurer l'énergie en sortie sur TLSST1

L'IHM charge n'affiche plus l'Avg(pC), le trend dans Plateforme IHM ne s'ouvre plus non plus ni l'ICT signal dans Start thr beam

16h18 : passage attenuateur laser de 350 à 320, remise à 350

Taille laser en x 0.3245 et taille laser en y 0.3498

17h22 Arret machine

 

 

 

 

 

 

 

 

 

 

 

 