  899   Thu Aug 8 10:12:35 2024 Entered by Super Team from 134.158.195.142 on Thu Aug 8 10:12:02 2024 LinacLI | RF D1 conditionnement section 

Remplissage SF6 de 2.3 bar à 2.5 bar par Christopher

10h08 : augmentation progressive de la HT

10h13 : Att sec 10 dB

On descend progressivement jusqu'à 1dB

10h25 Att sec 1 dB

10h26 Att sec 0.9 dB vide in section = 6.9e-9   vide out section = 1.3e-9

10h30 Att sec 0.8 dB vide in section =  7.4e-9 vide out section = 2.5e-9

10h34 Att sec 0.7 dB vide in section = 7.6e-9  vide out section = 3.7e-9

10h38 Att sec 0.6 dB vide in section =  7.5e-9 vide out section = 4.3e-9

10h42 Att sec 0.5 dB vide in section =  7.1e-9 vide out section = 4.5e-9

10h46 Att sec 0.4 dB vide in section =  6.7e-9 vide out section = 4.6e-9

10h55 Att sec 0.3 dB vide in section =  5.6e-9 vide out section = 6.2e-9

13h58 Att sec 0.2 dB  vide in section =  4.9e-9 vide out section = 5.5e-9

14h20 Intervention LE dans la casemate

15h25 FIn d'intervention, reprise conditionnement

18h fin

 

 

  898   Tue Aug 6 09:57:48 2024 Entered by Super Team from 134.158.195.142 on Tue Aug 6 09:57:28 2024 LinacLI | RF D1 Commissioning section accélératrice 

9h58 Démarrage Att sec 10dB 3us 25Hz HT = 1200V

On augmente progressivement la HT

10h03 HT = 1215V att sec 10dB

10h04 On descend progressivement de 10dB à 1dB

10h28 passage à 1 dB vide in section = 6.9e-9  vide out section = 1.5e-9

10h33 passage à 0.9 dB vide in section = 7.5e-9  vide out section = 2.6e-9

10h36 passage à 0.8 dB vide in section = 8e-9  vide out section = 3.8e-9

10h40 passage à 0.7 dB vide in section = 8e-9  vide out section = 4.8e-9

10h44 passage à 0.6 dB vide in section = 7.7e-9  vide out section = 5.2e-9

10h47 passage à 0.5 dB vide in section = 7.4e-9  vide out section = 5.5e-9

10h55 passage à 0.4 dB

13h50 interlock à 0.4dB

13h53 interlock à 0.4dB

13h56 interlock à 0.4dB

Pause

14h42 reprise à 0.4dB

15h42 Interlock machine

18:40 FIN 

 

 

 

 

 

 

  897   Mon Aug 5 10:50:06 2024 Entered by Super Team from 134.158.195.141 on Mon Aug 5 10:49:42 2024 LinacLI | RF D1 Suite conditionnement section 

10h50 Mise en route à 10dB, HT = 1000V

11h04 HT = 1215V, Att sec 3 dB vide in section = 9.3e-9 vide out section = 1e-9

11h05 HT = 1215V, Att sec 2 dB vide in section = 9.4e-9 vide out section = 1e-9

11h06 HT = 1215V, Att sec 1 dB

Interlock à 1dB

11h06 HT = 1215V, Att sec 1 dB vide in section = 7.2e-9 vide out section = 1.2e-9

11h16 Att sec 0.9dB vide in section = 8.5e-9    vide out section = 2.5e-9

11h21 Att sec 0.8dB vide in section = e-9    vide out section = e-9

11h27 Att sec 0.7dB vide in section = 9.5e-9    vide out section = 6.8e-9

11h32 Att sec 0.6dB vide in section = 9.2e-9    vide out section = 7.9e-9

11h38 Att sec 0.5dB (Pis=22MW) vide in section = e-9    vide out section = e-9

12:39 : Interlock ? (scope Auto -> Norm to catch last signal)

12:51 : Interlock section

13:28 : Att sec 0.5dB (Pis=22MW)

14h03 Interlock à 0.5 dB

14h07 Att sec 0.4 dB vide in section = e-9    vide out section = e-9

14h50 interlock 0.4 dB

17h40 interlock 0.4 dB

18h55 fin

 

  896   Fri Aug 2 11:00:49 2024 VM, HG, RC, SCUnder ProcessShift summaryRF D1 RF conditionning : 2 aout  

Start from 10 dB 

decrease up to 1 dB : Vacuum is OK decrease up to 10â»8 mBar

11h10 : att.sec 0.7 dB ==> vide in section 1.1 10-8 mbar & vide out section 8 10-9 mbar 
yesterday : att.sec 0.7 dB (Pis = 21 MW) ==> vide in section  1.1 10-8 mbar & vide out section 1.1 10-8 mbar

11h15 : att.sec 0.6 dB ==> vide in section 1.0 10-8 mbar & vide out section 1 10-8 mbar 
yesterday : att.sec 0.6 dB (Pis = 21.5 MW) ==> vide in section  1.2 10-8 mbar & vide out section 1.3 10-8 mbar

11h22 : att.sec 0.5 dB ==> vide in section 1.0 10-8 mbar & vide out section 1 0-8 mbar 
yesterday : in section à 1.1 10-8 mbar & vide out section 1.4 10-8 mbar

11h30 : att.sec 0.4 dB ==> vide in section 1.0 10-8 mbar & vide out section 1 1-8 mbar 
yesterday : in section à 1 10-8 mbar & vide out section 1.4 10-8 mbar

11h38 : att.sec 0.3 dB ==> vide in section 1.0 10-8 mbar & vide out section 1 1-8 mbar 
yesterday : in section à 1 10-8 mbar & vide out section 1.4 10-8 mbar 

11h39 : Interlock section V4 jump

11h40 :Back to 0.4 dB

11h46 :Back to 0.3 dB : vacuum V4, V5 < 10^-8 mBar, V4 decrease 

12h07 : Interlock machine with V4 jump

12h08 :Back to 0.4 dB

12h15 : Interlock machine 
12h22 : Interlock machine
​12h25 : Interlock machine

12h28 :Back to 3.4 dB

​12h28 : Interlock machine
​12h28 : Start with lower voltage HT : 1205 V, Att 0.4 dB
12h32 :Back to 0.1 dB, HT 1205
​
12h42 : Interlock machine, V5 increase
​12h58 : Interlock section no vacuum increase
​13h10 : restart after 10 minutes to relax cool
 the machine 
​13h18 : HT --> 1208 
​13h20 : Interlock section no vacuum increase

 

​13h30 : Att back to 3dB and decrease slowly : 0.9 dB now

​13h38 : Att 0.8 dB

13h44 : Att 0.7 dB ==> vide in section 9.9 10-9 mbar & vide out section 1.1 0-8 mbar 

14h : Att 0.6 dB ==> vide in section 9.9 10-8 mbar & vide out section 1.2 0-8 mbar 

14h15 : Att 0.5 dB ==> vide in section 9.2 10-8 mbar & vide out section 1.2 0-8 mbar 

14h30 : Att 0.4 dB ==> vide in section  10-8 mbar & vide out section 1.2 0-8 mbar 

14h34 : Att 0.3 dB

14h42 : Att 0.2 dB vide in section 8e-9 vide out section 1.1 e-8

Interlock 14h43 mais pas de réfléchi => passsage en mode persistence sur l'oscillo pour vérifier qu'il n'y a pas du tout de réfléchi

14h53 => on est revenu a Att. 0.2 dB => in section 8e-9 vide out section 1.1 e-8

15h00 => on est passé à  Att. 0.1 dB => interlock encore mais on ne voit pas de réfléchi !
               relance immédiate à Att. 0.1 dB => in section 7e-9 vide out section 9e-9

15h22 : att.sec 10 dB apres interlock reseau

15h23 : interlock sans reflechi visible sur oscillo

15h25 : interlock reseau

15h26 : att sec 10dB  ==> vide in section 2.6 10-9 mbar & vide out section 8 10-9 mbar 

15h29 passage à 15dB

15h32 : att sec 14 dB  ==> vide in section 1.5 10-9 mbar & vide out section 2.4 10-9 mbar 

15h33 : interlock reseau

15h35 : att sec

15h37 interface rf conditionning ne marche plus pour bouger attenuateur, rechargement de l'interface, semble ok maintenant

15h38 : att.sec  20 dB ==> vide in section 1.4 10-9 mbar & vide out section 2.3 10-9 mbar 

15h40 : att sec 20 dB interlock sans réfléchi visible sur oscillo

15h40 relance à 20 dB

15h44 interlock sans reflechi klystron

15h45 : relance à 20dB

15h46 : interlock reseau

15h47 Pause de 10 minutes

16h00 reprise avec att sec 10dB ==> vide in section 2.7 10-9 mbar & vide out section 2.1 10-9 mbar 

16h06 att sec 9dB ==> vide in section 2.9 10-9 mbar & vide out section 2 10-9 mbar

16h10 att sec 8dB ==> vide in section 3.3 10-9 mbar & vide out section 2 10-9 mbar

16h14 att sec 7dB ==> vide in section ? 10-9 mbar & vide out section ? 10-9 mbar

16h14 interlock

16h15 reprise att sec 7dB ==> vide in section 3.5 10-9 mbar & vide out section 2 10-9 mbar

16h22 att sec 6dB ==> vide in section 3.9 10-9 mbar & vide out section 1.9 10-9 mbar

16h27 att sec 5dB ==> vide in section 4.3 10-9 mbar & vide out section 1.9 10-9 mbar

16h31 att sec 4dB ==> vide in section 4.5 10-9 mbar & vide out section 1.9 10-9 mbar

16h35 att sec 3dB ==> vide in section 4.9 10-9 mbar & vide out section 2 10-9 mbar

16h39 att sec 2dB ==> vide in section 4.9 10-9 mbar & vide out section 2 10-9 mbar

16h43 att sec 1dB ==> vide in section 7.5 10-9 mbar & vide out section 2.8 10-9 mbar

16h47 att sec 0.9 dB ==> vide in section 8.7 10-9 mbar & vide out section 4.3 10-9 mbar

16h51 att sec 0.8 dB ==> vide in section 9.3 10-9 mbar & vide out section 6.4 10-9 mbar

16h55 att sec 0.7 dB ==> vide in section 9.5 10-9 mbar & vide out section 7.7 10-9 mbar

16h59 att sec 0.6 dB

17h interlock reseau

17h01 att sec 0.6 dB ==> vide in section 9.2 10-9 mbar & vide out section 8.7 10-9 mbar

17h05 att sec 0.5 dB ==> vide in section 9 10-9 mbar & vide out section 9 10-9 mbar

17h10 att sec 0.4 dB ==> vide in section 8.4 10-9 mbar & vide out section 1 10-8 mbar

17h42 interlock 0.4dB sans observation reflechi klystron

17h44 att sec 0.4 dB

17h46 att sec 0.3 dB ==> vide in section 7.8 10-9 mbar & vide out section 1 10-8 mbar

18h09 att sec 0.2 dB ==> interlock reflechi section

18h10 Fin de shift

 

 

  895   Thu Aug 1 08:43:29 2024 Iryna, Sophie, Viktor, Slava Shift summaryLinac Commissionning conditionnement de la section RF@ 3µs & 25 Hz  

8h40 Warm-up the modulator

*** reprise de conditionnement @ 3µs & 25 Hz

9h43 Trig modulator

9h50 Problème avec la température du chiller qui n'est pas à la consigne, retour en standby modulateur, on/off chiller pour essayer de relancer

10h23 HT = 1215V, att = 10dB, 25Hz, pic de vide

10h31 : att. sec 9dB, légère augmentation du vide

10h40 : att.sec 8 dB ==> vide in section 4 10-9 mbar & vide out section 1.3 10-9 mbar

10h42 : att.sec 7 dB ==> vide in section  4.9 10-9 mbar & vide out section 1.3 10-9 mbar

10h44 : att.sec 6 dB ==> vide in section  6 10-9 mbar & vide out section 1.3 10-9 mbar

10h47 : att.sec 5 dB ==> vide in section 7 10-9 mbar & vide out section 1.4 10-9 mbar

10h50 : att.sec 4 dB ==> vide in section 7.5 10-9 mbar & vide out section 1.4 10-9 mbar

10h54 : att.sec 3 dB ==> vide in section 7.8 10-9 mbar & vide out section 1.6 10-9 mbar

11h01 : att.sec 2 dB ==> vide in section 7.7 10-9 mbar & vide out section 1.6 10-9 mbar

11h08 : att.sec 1 dB (Pis = 19.6 MW) ==> vide in section  8.6 10-9 mbar & vide out section 2.6 10-9 mbar

11h15 : Interlock

11h16 : retour à 5 dB

11h20 : att sec 1dB ==> vide in section  9 10-9 mbar & vide out section 3 10-9 mbar

11h34 : att.sec 0.9 dB (Pis = 20 MW) ==> vide in section 1.1 10-8 mbar & vide out section 7.1 10-9 mbar

11h46 : att.sec 0.8 dB (Pis = 20.6 MW) ==> vide in section  1.1 10-8 mbar & vide out section 1 10-8 mbar

12h00 : att.sec 0.7 dB (Pis = 21 MW) ==> vide in section  1.1 10-8 mbar & vide out section 1.1 10-8 mbar

12h15 : att.sec 0.6 dB (Pis = 21.5 MW) ==> vide in section  1.2 10-8 mbar & vide out section 1.3 10-8 mbar

12h19 : Interlock

12h23 HT = 1115V, att = 6.6dB, 25Hz,

12h27 HT = 1215V, att = 6.6dB, 25Hz

12h34 HT = 1215V, att = 0.7dB, Interlock

12h36 HT = 1115V, att = 5.7dB,

12h40 HT = 1215V, att = 1.7dB,

12h41 HT = 1215V, att = 0.7dB,

12h44 : att.sec 0.7 dB (Pis = 21 MW) ==> vide in section  1.1 10-8 mbar & vide out section 1.0 10-8 mbar

12h55 : att.sec 0.6 dB (Pis = 21.5 MW) ==> vide in section  1.2 10-8 mbar & vide out section 1.3 10-8 mbar

13h02 : Interlock

13h05 HT = 1115V, att = 0.6dB

13h07 : att.sec 0.6 dB (Pis = 21.5 MW) ==> vide in section  1.0 10-8 mbar & vide out section 1.1 10-8 mbar

13h10 : Interlock

13h12 HT = 1175V, att = 0.6dB

13h15 : att.sec 0.6 dB (Pis = 21.5 MW) ==> vide in section  1.2 10-8 mbar & vide out section 1.4 10-8 mbar

13h22 : Interlock

13h23 HT = 1175V, att = 0.6dB

13h25 : HT = 1275V, att = 0.6dB Interlock

13h26 HT = 1175V, att = 0.6dB

13h27 HT = 1215V, att = 0.6dB

13h28 : Interlock

13h30 HT = 1175V, att = 0.6dB

13h32 HT = 1215V, att = 0.6dB

13h34 : Interlock

13h44 : Interlock (Klystron)

13h50 : HV Standby (Chck SF6 2.5Bar)

13h58 HT = 1175V, att = 0.6dB

14h00 : Interlock

14h04 HT = 1215V, att = 0.6dB

14h06 : Interlock

14h12 HT = 1215V, att = 3.6dB

14h18 HT = 1215V, att = 1 dB

14h22 HT = 1215V, att = 0.9 dB

14h25 HT = 1215V, att = 0.8 dB (Pis=20.6 MW) ==> Vide démarre :  in section à 1 10-8 mbar & vide out section 9.4 10-9  mbar

14h35 HT = 1215V, att = 0.7 dB ->0.6 dB  ==> Vide démarre :  in section à 1.1 10-8 mbar & vide out section 1.2-1.3 10-8 mbar

15h00 HT = 1215V, att = 0.5 dB  ==> Vide démarre :  in section à 1.1 10-8 mbar & vide out section 1.4 10-8 mbar

15h50 HT = 1215V, att = 0.5 dB 2 Breakdowns RF structure (screenshots)

15h59 : Interlock

16h05 HT = 1215V, att = 0.4 dB  ==> Vide démarre :  in section à 1 10-8 mbar & vide out section 1.4 10-8 mbar

16h10 HT = 1215V, att = 0.4 dB  Breakdown klysron (screenshot)

16h20 HT = 1215V, att = 0.3 dB  ==> Vide démarre :  in section à 9.6 10-9 mbar & vide out section 1.3-1.4 10-8 mbar

16h22 : Interlock

16h36 HT = 1215V, att = 0.3 dB 1 Breakdown RF structure (screenshot)

16h38 : 1 Interlock

16h40 HT = 1215V, att = 0.2 dB ==> Vide démarre :  in section à 9.3 10-9 mbar & vide out section 1.2-1.3 10-8 mbar

16h44 : 1 Interlock

16h51 : 1 Interlock

16h54 HT = 1215V, att = 0.2 dB  Breakdown klysron (screenshot)

17h00 HT = 1215V, att = 0.1 dB ==> Vide démarre :  in section à 8 10-9 mbar & vide out section 1.1 10-8 mbar

17h07 HT = 1215V, att = 0.1 dB 1 Breakdown RF structure (screenshot)

17h08 : 2 Interlock

17h12 : 1 Interlock

17h14 HT = 1215V, att = 0.1 dB 1 Breakdown RF structure

Vide  :  in section à 5.9 10-9 mbar & vide out section 9.5 10-8 mbar

17h18 : Stop of the shift

 

 

  894   Wed Jul 31 09:58:14 2024 M.O, M ELK, Slava , IrynaUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 31/07 

signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs

violet: incident section Pis

vert: refléchi Klystron Prk

jaune : incident Klystron Pik

avec la carte Redpitaya:

vert : puissance transmise dans la charge fin de section  Pchargesection

rouge : puissance reflechi section  Prs

blue: puissance incidente section Pis

Pression SF6 = 2.35 bar => JN a completer le remplissage pour réajuster la pression de SF6 pour la mettre à 2.5 bar

NB: vide sans HF @ 30 °C : in section 1.1 10-9 mbar & out section 1.2 10-9 mbar ==> vide milieu section devrait etre plus ( facteur 8 à 10) qu à l'entrée et sortie section

Suggestion: le splitter de puissance de la section est équipé en plus de deux ports de pompage additionnels DN40CF (voir image jointe ) ==> pour améliorer le pompage il va falloir rajouter au moins une pompe additionnelle à l'entrée de la section

**** reprise de conditionnement @ 3µs & 25 Hz

Mettre att. Sec à 10 dB et augmenter la HT progressivement et en douceur jusqu'à Alim 1215 V & HT=288 kV (Pik =33 MW)

Puis faire baisser att. sec en douceur

10h30 : att.sec 6 dB (Pis=6MW) ==> vide in section 5.5 10-9 mbar & vide out section 1.3 10-9 mbar

10h45:  att. sec 5.5 dB (Pis=7 MW) ==> vide in section 5.5 10-9 mbar & vide out section 1.3 10-9 mbar

10h50: att. sec 5 dB (Pis=7.8 MW) ==> vide in section 5.5 10-9 mbar & vide out section 1.3 10-9 mbar

11h00: att. sec 4.5 dB (Pis=8.7 MW) ==> vide in section 5.5 10-9 mbar & vide out section 1.3 10-9 mbar

11h05: att. sec 4 dB (Pis=9.8 MW) ==> vide in section 5.6 10-9 mbar & vide out section 1.3 10-9 mbar

11h10: att. sec 3.5 dB (Pis=11 MW) ==> vide in section 5.7 10-9 mbar & vide out section 1.3 10-9 mbar

11h15: att. sec 3 dB (Pis=12.4 MW) ==> vide in section 7.4 10-9 mbar & vide out section 2.3 10-9 mbar

11h 25: att. sec 2.5 dB (Pis=13.9 MW) ==> vide in section 6.2 10-9 mbar & vide out section 1.8 10-9 mbar

11h 35: att. sec 2 dB (Pis=15.6 MW) ==> vide in section 6.2 10-9 mbar & vide out section 1.8 10-9 mbar

11h 45: att. sec 1.5 dB (Pis=17.5 MW) ==> vide in section 6 10-9 mbar & vide out section 1.5 10-9 mbar

11h 50: att. sec 1 dB (Pis=19.6 MW) : au début le vide monte ==> @ 13H15 vide in section 1.3 10-8 mbar & vide out section 1 10-8 mbar

13h20: coupure HF sans aucun reflechi visible sur le scope (interlock machine)

                                                                                                             @ 14h00 vide in section 1.2 10-8 mbar & vide out section 9 10-9 mbar

* Faire durer le conditionnement entre att. sec 1 dB (Pis=19.6 MW) et 0.1 dB (Pis=24 MW) pour voir l'évolution du vide vs time

* faire baisser l'attenuation de 0.1 dB

14h00 : att. sec 0.9 dB (Pis=20 MW) ==> Vide démarre : in section à 1.3 10-8 mbar & vide out section à 1.3 10-8 mbar ==> @15h00: vide in section 1.3-1.4 10-8 mbar & vide out section 1.3 10-8 mbar

14h52 : att. sec 0.9 dB (Pis=20 MW) Breakdown in the section (screenshot)

15h07 : Interlock machine

15h10 : att. sec 0.8 dB (Pis=20.6 MW) ==> Vide démarre :  in section à 1.3-1.4 10-8 mbar & vide out section 1.3 10-8  mbar ==> @16h10 : vide in section 1.4 10-8 mbar & vide out section 1.5 10-8 mbar

16h10 : att. sec 0.7 dB (Pis= 21MW) ==> Vide démarre :  in section à 1.4 10-8 mbar & vide out section 1.6 10-8  mbar ==> @17h00 : vide in section  1.310-8 mbar mbar & vide out section  1.6 10-8 mbar

17h30 Stop the shift

  893   Tue Jul 30 10:17:06 2024 M.O, M ELK, Hayg, SlavaUnder ProcessShift summaryLI | RF D1 Conditionnement section SC/ME/MO/VK/HG  

signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs

violet: incident section Pis

vert: refléchi Klystron Prk

jaune : incident Klystron Pik

avec la carte Redpitaya:

vert : puissance transmise dans la charge fin de section  Pchargesection

rouge : puissance reflechi section  Prs

blue: puissance incidente section Pis

NB: Pression SF6 2.4 bar à reajuster

Le passage de 10Hz à 25 Hz => Puissance moyenne (25Hz) = puissance moyenne (10Hz)  X 2.5

*** Passage à 25Hz & 1µs

Au Demmarage Mettre att. sec 10 dB et faire augmenter la HT en douceur  de 1000 V jusqu'à (Alim 1215 V & 289 kV ==> Pik=33 MW)

Puis Faire baisser att. sec en douceur : ci-dessous quelques points de mesures

11h16 : att. sec 3 dB (Pis=12 MW) 1µs & 25 Hz ==> vide in sec 4 10-9 mbar out section 1.5 10-9 mbar

11h20 : att. sec 2.5 dB (Pis=14 MW) 1µs & 25 Hz ==> vide in sec 3.7 10-9 mbar out section 1.4 10-9 mbar

11h25 : att. sec 2 dB (Pis=15 MW) 1µs & 25 Hz ==> vide in sec 3.7 10-9 mbar out section 1.4 10-9 mbar

11h30 : att. sec 1.5 dB (Pis=17 MW) 1µs & 25 Hz ==> vide in sec 3.7 10-9 mbar out section 1.4 10-9 mbar

11h35 : att. sec 1 dB (Pis=19 MW) 1µs & 25 Hz ==> vide in sec 6.9 10-9 mbar--> ? ca ne baisse pas   out section 2.7 10-9 mbar --> ? ca ne baisse pas  

12h 04 : att. sec 0.9 dB (Pis=20 MW) 1µs & 25 Hz ==> vide in sec 7.910-9 mbar--> ? ca ne baisse pas   out section 3.8 10-9 mbar --> ?ca ne baisse pas  

NB: la pompe en amont de la section passe de 1.2 10-9 mbar à 3.5 10-9 mbar

12h 12: att. sec 0.8 dB (Pis=20.5 MW) 1µs & 25 Hz ==> vide in sec 7.910-9 mbar--> ?  out section 4.3 10-9 mbar --> ?

12h 20: att. sec 0.7 dB (Pis=21MW) 1µs & 25 Hz ==> vide in sec 7.9 10-9 mbar--> ?  ca ne baisse pas out section 5 10-9 mbar-->? ca ne baisse pas

12h 30: att. sec 0.6 dB (Pis=21.5MW) 1µs & 25 Hz ==> vide in sec 7.7 10-9 mbar--> ?  /out section 5.110-9 mbar --> ?

12h 35 : att. sec 0.5 dB (Pis=22 MW) 1µs & 25 Hz ==> vide in sec 7.3 10-9 mbar--> ?  /out section 6.2 10-9 mbar --> ?

12h45 : att. sec 0.4 dB (Pis=22.5 MW) 1µs & 25 Hz ==> vide in sec 6.9  10-9 mbar--> ?  /out section 5.9 10-9 mbar --> ?

13h00:  att. sec 0.3 dB (Pis=23 MW) 1µs & 25 Hz ==> vide in sec 6.6 10-9 mbar--> ?  /out section 7.4 10-9 mbar --> ?

13h10:  att. sec 0.2 dB (Pis=23.5 MW) 1µs & 25 Hz ==> vide in sec 6 10-9 mbar --> ?  /out section 6.7 10-9 mbar --> ?

13h30:  att. sec 0.1 dB (Pis=24 MW) 1µs & 25 Hz ==> vide in sec 5.4 10-9 mbar-->4.9 10-9 mbar  ?  /out section 6 10-9 mbar --> 5.6 10-9 mbar ?

** 14h00 : passage à 3 µs et 25 Hz

Mettre att. sec 6 dB et passer à 3 µs

14h20:  att. sec 5.5 dB (Pis=5.5 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8

14h25:  att. sec 5.0 dB (Pis=7.8 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8

14h35:  att. sec 4.5 dB (Pis=8.8 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8

14h49:  att. sec 4.0 dB (Pis=9.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8

14h55:  att. sec 3.5 dB (Pis=11.6 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8

15h11:  att. sec 3.0 dB (Pis=12.4 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V5 jump)

15h37:  att. sec 2.5 dB (Pis=13.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V4, V5 decrease. Out MP ? )

15h44:  att. sec 2.0 dB (Pis=15.6 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V4, V5 small jump )

15h50:  att. sec 1.5 dB (Pis=17.5 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V5 jump, V4 nothing )

15h56:  att. sec 1.0 dB (Pis=19.7 MW) 3µs & 25 Hz ==> vide in sec V4 >= V5 > 10⁻8 (V4, V5 strong jump  )
16:30 : interlock section
16h34:  att. sec 1.2 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 (V4, V5 strong jump  )
16h37 : Standby -->  Acces casemate JN/GM pour recuperer watmetre

16h48: att. sec 1.1 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5  (V4, V5 strong jump  )
16h52 : Interlock machine
16h55: att. sec 1.0 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 > 10⁻8 (V4, V5 mieux que 15h56 )

17h : Interlock reseau
17:02 att. sec 0.9 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V5>V4  (V4, V5 stable)
petits tests :

17:04 att. sec 0.8 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V5>V4  (V4 : activités, V5 jump puis stable)

17:06 att. sec 0.7 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V5>V4  (idem )

17h10 : End apres un interlock machine 

 

  892   Mon Jul 29 09:34:57 2024 M ELK, Slava, Iryna, HaygUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 29/07 

signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs

violet: incident section Pis

vert: refléchi Klystron Prk

jaune : incident Klystron Pik

avec la carte Redpitaya:

vert : puissance transmise dans la charge fin de section  Pchargesection

rouge : puissance reflechi section  Prs

blue: puissance incidente section Pis

Reprise de conditionnement à 3µs & 10Hz entre 1dB (Pis=19.6 MW ) et 0.1 dB (Pis=24 MW)

NB: intervention de groupe de vide : pour faire un test fermeture de la vanne de sortie par exemple . sa fermeture n'a aucun impact sur le pompage ==> on a décidé de laisser les vannes ouvertes.Selon Bruno  il faut du temps pour le pompage

12h13: att sec 0.8 dB (20.5MW)

12h20: att sec 0.7 dB (21MW) ==> niveau de vide entrée 1.2 10-8 mbar, niveau de videsortie 1.3 10-8 mbar

12h 30: att sec 0.6 dB (21.5MW) ==> niveau de vide entrée section 1.1 10-8 mbar niveau vide sortie section 1.4 10-8 mbar

12h 37:  att sec 0.6dB (21.5MW) claquage section (reflechi section signal orange) voir image saved

mettre att. sec à 1dB puis trig et faire baisser l'attenuation de 0.05dB (0.25 MW)

12h40: att. sec 0.6dB (21.5MW)

12h50: att. sec 0.55dB (21.8MW)

13h00: att. sec 0.5dB (22MW)

Due to the internet problem lost the information written between 13h and 15h. In summary, stable operation for  0.5 dB -> 0.3 dB

15:15 : 0.3 dB -> 0.2 dB idem

15:19 : 0.2 dB several breakdowns (see screenshot)

15:23 : 0.2 dB -> 0.5 dB

15:30 : Starting to decrease the attenuation towards 0.1 dB: -> 0.4 dB -> 0.3 dB-> 0.2 dB

15:35 : 0.2 dB 2 breakdowns (see screenshot) -> 0.3 dB

15:50 : 0.2 dB one breakdown

15:57 : 0.2 dB one breakdown

15:58 : 0.3 dB

16:08 : 0.3 dB two breakdowns

16:10 : 0.3 dB breakdown section

16:13 : several breakdowns section 0.3 dB: -> 1 dB

Waiting until vacuum will stabilize

NB: pb de pompage : pompage est lent. Le pompage le section RI n'est pas efficace à des niveaux de haute puissances.

17 h27 passage à 25Hz & 3us pour voir le dégasage

att. sec 4 dB (Pis=10MW)

 

 

  891   Fri Jul 26 10:12:42 2024 M.O, M ELK , Iryna, HaygNot FixedLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 26/07 

signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs

violet: incident section Pis

vert: refléchi Klystron Prk

jaune : incident Klystron Pik

avec la carte Redpitaya:

vert : puissance transmise dans la charge fin de section  Pchargesection

rouge : puissance reflechi section  Prs

blue: puissance incidente section Pis

Reprise de conditionnement autour de att sec = 0.1 dB @ 3 µs et 10 Hz

* Mettre attenuation section @ 10 dB et faire augmenter la HT progressievement et en douceur jusqu à (alim 1215 V & HT 288 kV correspondant à Pik=33 MW)

pb de pompage probabalement volume trés grand (pompage outside section):

mise en standby 10h55 : intervention de groupe vide pour voir si on peut  améliorer le pompage en faisant le réglage de paramètre de la pompe ou  fermer les deux vannes entrée et sortie section.

MPS interdit la fermeture des deux vannes ===> contacter Noureddine par émail et téléphone  ( télétravail) pour une intervention

11:05 redemarrage HF

att section 1dB ==> vide <1.2 10-8 mbar

11h33 att sec 0.8 dB (Pis=20.5 MW) ==>vide in section =1.3 10-8 mbar , vide out section 1.2 10-8 mbar

11h38 att sec 0.7 dB (Pis=21 MW) ==>11h41 : claquage section avec pic vide

11h45 att sec 0.5 dB (Pis=22 MW) ==> vide <1.3 10-8

11h51 att sec 0.4 dB (Pis=22.5 MW) ==> vide <1.4 10-8

11h56 att sec 0.3 dB (Pis=23 MW) ==> claquage section ==> pic vide @11h57 (image saved)

12h05 att sec 0.1 dB (Pis=24 MW) ==> claquage dans section à 3µs  revenir à 1µs , 2µs  pour att. sec 0.1 dB voir si  ca tient

13h10  intervention groupe vide dans la casemate ==>standby

14:30 : Beaucoup d'interlock au démarrage

14:30 : 3µs --> 1 µs

14:40 : 1µs --> 2 µs interlocks

14:40 : 2µs --> 1 µs -

15:06 : 1µs --> 2 µs.==> vide < 8.10-9 mbar

15:32 :coupure HF  sans aucun signal réfléchi visible sur le scope , vide OK, 

15h33 : 2 µs

16h34 : breakdown screenshot

16h41 : breakdown screenshot

16h56 : coupure HF  sans aucun signal réfléchi visible sur le scope

17h15 : breakdown screenshot

17h15 : Stop for today

 

  890   Thu Jul 25 09:15:25 2024 M ELK, SC, MO FixedLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 25/07 

9h00 Mise en route modulateur

signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs

violet: incident section Pis

vert: refléchi Klystron Prk

jaune : incident Klystron Pik

avec la carte Redpitaya:

vert : puissance transmise dans la charge fin de section  Pchargesection

rouge : puissance reflechi section  Prs

blue: puissance incidente section Pis

*Reprise de conditionnement à 2 µs & 10 Hz autour de la puissance Pis=24 MW ( attenuation sect 0.1 dB)

- mettre attenuateur section @ 3 dB puis augmenter Pik progressivement et en douceur ( Alim de 1000V à 1215 V) pour atteindre Pik= 33 MW (Alim 1215V & HT 288 kV)

  Faire baisser att sec de 3 dB à 0.1 dB

- 10h30 att sec 0.1 dB (Pis=24 MW) claquage dans sec @ 10h45 ==> pic vide

* Passage à 3 µs & 10 Hz @11H

-mettre att sec à 4 dB puis passer 3µs

- faire baisser att sec progressivement

- 11 h03 :att sec 3 dB ( Pis= 12 MW)

- 11h05: att sec 2.5 dB (Pis=14 MW  ) ==> vide out sec 6.10-9 mbar & vide in sec 8.10-9 mbar

- 11h08 : att sec 2 dB (Pis=15.5MW  ) ==> vide out sec 6.10-9 mbar & vide in sec 8.10-9 mbar

- 11h11 : att sec 1.5dB (Pis=17.5MW  ) ==> vide out sec 6.10-9 mbar & vide in sec 8.10-9 mbar

- 11h15 : att sec 1 dB (Pis=19.5MW  ) ==> vide 1.6 10-8 mbar

- 11h20 claquage in section à att sec 0.5 dB (Pis=22 MW)

- 11h 29 retour à att sec 1dB 

- 11h45 att.sec 0.8 dB (Pis =20 MW) ==> vide  <2.1 10-8 mbar

- 11h58  att.sec 0.7dB (Pis =21 MW) ==> vide  <2.2 10-8 mbar

- 12h10 att.sec 0.6dB (Pis =21.5MW) ==> vide  <2.2 10-8 mbar : claquage @12h11

- 12h32 att sec 0.7 dB (Pis=21 MW) ==> claquage et pic vide voir images saved

- 12h35 faire un sweep entre 1dB (Pis=19.5 MW) et 0.1 dB (Pis=24 MW) avec un pas de 0.05 dB ( automated conditionning) :

  *claquage dans section @ 0.3 dB ==> pic vide

  *claquage réseau HF @ 0.7 dB : reflechi Klystron uniquement voir image jointe

Arrêt à 13h23 pour vérifier SF6 ==> SF6 ok Pression 2.6 bar

14h00 att sec 0.6 dB claquage dans réseau (signal reflechi Klystron)

NB: Att sec 1.6 dB coupure HF modulateur se met en stand by ==>Intervention de Maher,  message Klystron :  defaut pompe ionique Klystron a entrainé le filament klystron à sa limite basse

Aprés redémarrage de klystron à 2 dB le filament est à la bonne valeur et ca recoupe HF toute de suite aprés ==>diagnostic: le courant  de la pompe pompe ionique de klystron a passé à la limite haute (>4µA) . impossible de la redemarrer instantanément à la HT nominale (Alim 1215V & HT 288 kV).  

En baissant la HT à 1000V le courant de la pompe baisse et faire augmenter HT progressivement jusquà la valeur nominale .

15h29 att sect 0.7 dB coupure HF sans aucun signal reflechi visisble sur le scope

15h30 redemarrage HF @ att sec 0.7 dB 15h42 coupure HF  sans aucun signal reflechi visisble sur le scope

15h45 redémarrage HF ca coupe à 0.7 dB 15h48 sans aucun signal reflechi visisble sur le scope

15h50 redémarrage HF at 16h05 claquage dans section att. sec 0.3 dB (Pis= 23 MW) avec un pic de vide

16h07 redemarrage HF : att sec 0.4 dB ==> vide < 1.6 10-8 mbar

16h19 att sec 0.2 dB claquage section 16h21 avec pic vide

16h22 redémarrage HF claqauge @ att. sec 0.1 dB (Pis=24 MW) 16H30 avec pic vide

16h35 claquage dans réseau HF @ att . sec 0.3 dB (reflechi klystron uniquement "vert")  voir image jointe

16h38  @ att . sec 1 dB  ==> Klystron se met en off (aucun réflechi voir image jointe)

Arret de conditionnement 16h38

Intervention de Maher

L'interlock qui a mis off le modulateur c'est le courant filament klystron, limite basse, nous avons redémarré et nous avons eu interlock pompe ionique >4 uA

J'ai envoyé à SCANDINOVA pour prévenir ( 2 fois ) (Maher)

plusieurs claquage section, pb de pompage section ( il faut attendre un temps pour pouvoir remettre la HF ) conditionnement ( 3 us, 1200 V et att 0.1 dB )

  889   Tue Jul 23 17:43:23 2024 MJ LinacLI Trends - conditionnement section 23 juillet 

Je viens de sauvegarder les trends conditionnement d'aujourd hui dans data/shared du jour

  888   Tue Jul 23 11:55:42 2024 MO, MELK, MJUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 23/07 

Reprise de conditionnement section 23/07 @ 10H30: largeur impulsion 0.5 µs @10 Hz ( voir images )

signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs

violet: incident section Pis

vert: refléchi Klystron Prk

jaune : incident Klystron Pik

avec la carte Redpitaya:

vert : puissance transmise dans la charge fin de section  Pchargesection

rouge : puissance reflechi section  Prs

blue: puissance incidente section Pis

* Mettre attenuation section 10 dB

* Augmenter Pik progressivement et en douceur jusqu'à sa valeur nominale Pik=33 MW ( Alim 1215 V & HT  288 kV)

* Puis faire baisser attenuation section de 10 dB progressivement et en douceur

*attenuation section 0.25 dB==> puissance incidente section Pis =23 MW ==> vide section <3.10-9 mbar

* attenuation 0.1 dB (24 MW)==> vide  sortie section 2.5 .10-9 mbar et entrée section 4.6 10-9 mbar

12h00 : largeur 1µs @ 10 Hz

* augmenter attenuation section de 0.1 dB jusquà  10 dB progressivement puis on change la largeur de 0.5 à 1 µs ( Pik =33 MW)
* faire baisser attenuation section de 10 dB à 0.1 dB progressivement et en douceur

* 14h00 attenuation 0.1 dB (Pis= 24 MW)==> vide  sortie section 7 .10-9 mbar et entrée section 6.10-9 mbar. A 14h03 ( 1 claquage dans la section ==>pic de vide  ) voir image RF plots  et Vide plots

* 14h13 attenuation 5 dB puis la faire baisser progressivement . 

* 0.1 dB (Pis=24 MW) de 14h20 à 14h51 il ya un claquage dans la section aprés 30min==> pic vide entrée section (voir images) .

* 14H53 trig @ 0.1 dB . A 15H15 claquage dans la section (Pis=24 MW)==> pic de vide entrée section (voir images )

* Passage att sec @ 2 dB et trig à 15h16, Puis faire baisser l'atténuation progressivement jusquà 0.5 dB (Pis= 22 MW) 15H30.

* 16H att sec 0.25 dB (Pis=23 MW)

* 16H 22 att sec 0.1 dB (Pis=24 MW) jusqu à 16h 35 pas de claquage

NB: signal Pis anomale (amplitude et forme visualisé avec Oscillo ==> vers 16H15  changement de cable BNC défectueux  => la forme et l'amplitude du signal Pis mesuré avec oscillo redevient correct et similaire à celui mesuré avec carte redpitaya (voir images jointes)

** Passage à la largeur d'impulsion 2µs_10Hz  @16H35

*mettre attenuation à 10 dB puis passage à 2 µs & 10Hz

* faire baisser l'atténuation de 10 dB

* 16H45 att.sec 1.5 dB (Pis=17 MW)==>vide < 7.10-9 mbar

* 16h53 att. sec 1.3 dB (Pis=18 MW)==> vide < 8.10-9 mbar

* 17h00 att.sec 1 dB (Pis= 19.5 MW)===> vide entrée et sortie section monte à 1.4 10-8 mbar

*17h12 att.sec 0.8 dB ( Pis= 20.5 MW) ==> vide monte à (sortie sec à 1.6 10-8 mbar et entrée sec à 1.4 10-8 mbar )

* 17h17 att.sec 0.5 dB ( Pis= 22 MW) ==> vide monte à( sortie  sec à 1.7 10-8 mbar et entrée sec à  1.3 10-8 mbar )

* 17h21 att.sec 0.3dB ( Pis= 23MW) ==> vide monte à (sortie  sec à 1.6 10-8 mbar et entrée sec à 1.2 10-8 mbar)

* 17h 24 att.sec 0.1dB ( Pis= 24MW) ==> claquage  dans la section à 17h28 ==> pic vide (voir images saved )

Arret de conditionnement à 17h30 et à reprendre jeudi

 

 

  887   Fri Jul 19 14:59:48 2024 Entered by Nicolas Delerue from 193.55.29.173 on Fri Jul 19 14:59:34 2024FixedFixOpt Passage a 25Hz IHM conditionnement 

Le bouton pour passer le conditionnement à 25Hz a été ajouté sur l'IHM conditionnement.

  886   Fri Jul 19 11:11:48 2024 Entered by Vincent Chaumat from 134.158.76.115 on Fri Jul 19 11:11:33 2024FixedProblemSY Syncho pB  

La synchro a été testée ce matin:

Il y avait effectuvement un pB de faux contact qui empechait la synchro de fonctionner.

 

Pour ce qui est de l'interface Fréquence Synchro:

le choix des fréquences fonctione... il est un peu récalcitrant... il faut parfois valider (bien cliquer sur le choix dans le menu déroulant) plusieurs fois les fréquences  de gauche à droite (de mémoire modulateur , linac, ring, diag,)

Les fréquences 25 10 5 hz sont dispo pour le linac

 

 

  885   Thu Jul 18 19:39:09 2024 Jean-Noel, MarieFixedShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Test reseau RF: Tout est OK 

Apres changement du dephaseur : debut des tests RF vers 17h30

** Le defaut est a 25 Hz, impossible de passer a 10 Hz,

ni avec l'IHM "Manual RF conditionning" en cliquand sur 10 Hz (cf screen shot)   
ni avec l'IHM Reglage phase RF et taux de repetition"  (cf screen shot : "Linac rep. rate" et "commands experts" n'ont strictement aucun effet)

--> on fait les tests a 25 Hz

** Le chassis Trigger bug regulierement : quand il bug, il faut aller appuyer sur un composant dans le chassis pour qu'il remarche (le 2eme composant en partant de la gauche)

** Test de la charge attenuateur :

  • 25 Hz, 1 mu sec, atten 30 dB :  Klystron de 1070 a 1215 V --> tout est OK
  • Idem mais avec 2 mu sec --> OK
  • Idem avec 3 mu sec --> OK

** Test du dephaseur a phi=50 degres sur l'IHM (courbe de calib NON rentree)

Conditions : 25 Hz, 3 mu sec, 1215 V et on bouge l'attenuateur de 30 dB a 0.1 db
On laisse une minute environ a chaque changement de valeur d'attenuateur.
Bilan : 1 claquage a 5 db, 1 claquage a 3 db, 1 claquage a 0.5 db. Claquage unique, le Klystron repart tout de suite. --> tout est ok

** Test dephaseur en mouvement

Conditions : 25 Hz, 3 mu sec, 1215 V, atten=0.1 dB et on bouge la phase de la limite max basse a la limite max haute avec l'ATK panel
Bilan : aucun claquage

** Screen shot typique en pj des signaux qu'on a eu pendant ces 2 heures (je n'ai pas reussi a faire fonctionner le trend ...)

Fin vers 19h30.

Tout est ok, merci JN et la meca !!!

 

  884   Tue Jul 16 13:04:50 2024 NDFixedInfoSY Git pull 

Un git pull a ete effectue dans le cadre de la mise a jour des codes de synchro.

  883   Fri Jul 12 15:17:39 2024 KD, MEUnder ProcessInfoRF D1 | Linac Commissionning test déphaseur section 

14h30: mise en chauffe

15h26: test déphaseur

* on commence à faible puissance 3us, 10Hz, 30dB, 1100V

* on augmente progressivement la puissance jusqu'à 1215V

15h30: Home du déphaseur et positionnement à 10deg

15h39: on monte la puissance injecté dans le déphaseur de -30dB à 3dB

15h46: à 3dB on fait de la dynamique 10 à 100 deg à 10 pas/s, on passe à 50pas/s

15h49: On passe à 300deg, claquage à 15h50, on passe à 25pas/s

15h54: on revient à 10deg et on repart à 320deg

15h59: on augmente la puissance, 2.5dB ==> ca claque, on repasse à 3dB

16h02: on redescend à 0deg, ca à claqué en dynamique

* 0deg, 100deg, 300deg ça claque (on ne peut pas remettre la puissance)

* balayage 100deg -> 250deg ça claque.

ça tiens à 3dB mais pas en dessous. 

16h20 : arrêt machine

==> il faut changer le déphaseur. 

 

 

 

 

 

 

 

 

 

 

  882   Tue Jul 9 14:43:10 2024 JNC, MO, KDUnder ProcessInfoRF D1 | Linac Commissionning test nouveau atténuateur V3 MegaIndustry 

ATTENTION : KLYSTRON BRIDE A 1215V, HT 288.7kV (32.5MW).

montage charge derrière l'atténuateur V3 MegaIndustry SN 

On monte doucement la puissance atténuateur à 30dB (tout dans la charge) :

1us, 1100V() ==> 3us, 1215V (32MW)

par incrément de puissance puis par incrément de durée d'impulsion

Aucun claquage visible et notable (cf. trend)

14h48 : 3us, 1215V (32MW au powermeter), aucun claquage après 20min

on change l'atténuateur

15h09 : on passe à 1100V et changement d'atténuation à 10dB

15h11 : on monte la puissance du klystron jusqu'à 1215V, pas de claquage après 10 min

15h21: changement atténuation à 5dB

15h25: changement à 3dB

15h35: changement 2dB

16h05 : changement 0.1 dB 

17h: mesures de la puissance à la charge sortie atténuateur ( on n'arrive pas à le faire !!  :-(     )

17h30: Arrêt ==> pas de claquage durant toute la période de test

 

 

 

  881   Fri Jun 28 14:37:19 2024 Entered by Super Team from 134.158.195.141 on Fri Jun 28 14:37:07 2024 LinacLI | RF D1 Tests reseau RF : branche attenuateur 

charge en position après atténuateur, 10Hz, 3us, 1220V

Ca claque à 15dB et 10dB, mais pas à 0.2dB

on essaye de monter la puissance de 0.2dB à 15dB pour voir ou ça claque.

14h33 : <1dB ça ne claque pas

14h38 : 1dB

14h41 : 1.250dB

14h47 1.9 dB

14h48 2.2 dB

14h50 3dB

14h51 6dB claquage à 6dB

14h59 6dB

15h01 0.2dB

15h01 6dB

15h03 8dB

15h08 8.5dB

15h08 passage à 1200V 0.2dB

15h10 5dB

15h11 0.2dB

15h11 passage à 1220V

15h13 8dB

15h17 8.2dB

15h25 toujours 8.2dB

15h26 8.4dB

15h26 8.6dB

15h28 passage à 1200V (8.6 dB)

15h45 0.4dB signaux instables (pompage)

15h54 Arret

Nombreux claquages à 8.6 dB à 1220V et 1220V

Il semble que la partie mobile de l'atténuateur a un problème

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  880   Thu Jun 27 16:14:38 2024 Entered by Super Team from 134.158.195.141 on Thu Jun 27 16:14:24 2024 LinacLI | RF D1 Tests reseau RF 

Charge en sortie diviseur cote section

HT = 1220V (35MW), 10Hz , 3us

Attenuateur cote canon 30 dB

Enregistrement RF_integral_trends_Oscillo.py , début autour de 16h