  Toutes les notes concernant les Commissionning de ThomX, Page 16 of 62  Not logged in ThomX    logo
Entry   M.O, M ELK , Iryna, Hayg; Conditionnement section 26/07 0.1dB_2us_10Hz_16-41-51.png0.1dB_2us_10Hz_16-34-07.pn0.1dB_2us_10Hz_17-15.png
Entry   M ELK, Slava, Iryna, Hayg; Conditionnement section 29/07 Interlock_Sec_0.2dB_10Hz_3µs_15_19.pngInterlock_Sec_0.2dB_10Hz_3µs_15_35.png
Entry   M ELK, SC, MO ; Conditionnement section 25/07 0.7_dB_3µs_10Hz__13h04__claquage_réseau_HF.png0.3dB_3us_10Hz_16h35.png1dB_3us_10Hz_16h38.png
Entry   M ELK; validation de conditionnement 16/08 RF_signalsScreenshot_Redpitaya_0.1dB_3µs_25Hz__2024-08-16.pngRF_signalsScreenshot_scope_0.1dB_3µs_25Hz__2024-08-16.png
Entry   M EK, SC, ND, VC; Conditionnement section 6/06 1100V_3us_10Hz_attsec_16dB.png1120V_3us_10Hz_attsec_16dB.png
Entry   M EK, ND, Iryna, Victor; Conditionnement section 23/05 RF_signals_1.7dB_1µs_1HzAtt1dB_2us_1Hz_2024-05-23_14-51-45.pngScr_0.6_us_0.6_dB_2024-05-23_17-01-31.png
Entry   M EK, ND; claquage et test micros 6x
Entry   M EK, KD, DN, HG; Conditionnement section 29/05 1dB_1us_5Hz_interlock.png
Entry   M EK, IC, DN, SC ;  6x
Entry   LS,ND; run du 30 juin 2023 health_check_2023_06_30_13_20.pngscan_charge_phase_min_280.0_max_320.0_10_54_10.png
Entry   LS, ND, IC, VK; Ring operation 16/5 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png
Entry   LS, ND; Prise de donnees 23/05 IMG_20230523_110343_8_copy_780x1040-20230523-164911728-20230523-164911770.jpg
Entry   LS, ND; shift du 29 juin 2023 
Entry   LS, MB, VC, ND; Programme prise de donnees 8/06 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png
Entry   Kevin D.; Laser PC status 
Entry   KDn Dupraz from 109.222.35.58 on Thu Oct 31 08:19:12 2024; shift du 31 octobre 2024 Screenshot_from_2024-10-31_13-37-11.pngScreenshot_from_2024-10-31_12-07-13.pngclosed_orbit_31102024.png
Entry   KD/CB; run du 19 avril 2023 charge_phase__at_19-04-2023__16-39-28.jpg2023-04-19_19_12_41_li_dg_sst_01-ccd_01_RAW.png
Entry   KD-VM-VC; shift du 4 septembre 2024 TL_SST2_Screenshot_from_2024-09-04_17-27-45.png2024-09-04_17_29_44_tl_dg_sst_01-ccd_01_RAW.png2024-09-04_17_32_29_li_dg_sst_01-ccd_01_RAW.png
Entry   KD,VM,IC;  EmittanceVsGunPhase.pngScreenshot_from_2025-05-28_11-28-14.png
Entry   KD,ND, RC,DN; shift du 07 juillet 2025 