VC MJ KD HG VK; Shift summary 6x
|
Demarrage chauffage modulateur 8h15
le chiller canon n'était pas éteint!
IHM cycling => cyclage et Ri-C2-PS-QP.02 (cyclage arreter à 12%) impossible
Reset DS Ri-C2-PS-QP.02 restart Ri-C2-PS-cycleQP.02 => arret à 12% =pB pour ecrire 10A de consigne
Reset DS Ri-C2-PS-QP.02 forçage consigne au démarrage à 0A estart Ri-C2-PS-cycleQP.02 => arret à 51%
"The sequence cannot start because the underlying device is not responding as expected :Cannot write on ri-c2/ps/qp.02/currentsetpointpm:
OPERATION_NOT_ALLOWED
Setpoint write forbidden if PS is OFF
Sigmaphi6Plugin::set_setpoint
process_new_set_pointSum failed
Failed to set point (caught DevFailed)!
GenericPowerSupply::process_new_set_pointSum
COMMAND_FAILED
Failed to set current point(caught DevFailed)!
GenericPowerSupply::write_currentSetpointPM
API_AttributeFailed
Failed to write_attribute on device ri-c2/ps/qp.02, attribute currentSetpointPM
DeviceProxy::write_attribute()
"
chauffage terminer
porte Igloo ouverte... => porte fermée pret à tirer
Iris à 07mm
Recherche cause des sauts faisceau
Alim anneaux off => saut toujours présent
Phase laser PC/RF pas en cause car energie faisceau toujours la meme
Alim modulateur -10Volts pas d'effet sur le faisceau
Alim Q pole tl off => saut toujours présent
" IHM alim PS" ne fonctonne pas sans poling"
~11h25 : Alim steerer LI-str01 V et H OFF (screenshot saved)
~11h47 : Alim steerer LI-str01 V et H ON (courant a zero)
~11h59 : Alim steerer LI-str01 V et H OFF
~12h09 : Alim steerer LI-str01 V et H ON (courant a zero)
~12h12 : Alim steerer LI-str01 V et H ON (H=2 V=0 )((screenshot saved))
~12h48 str1 V OFF
~12h56 - 13h18 : Alim steerer LI-str01 V et H OFF (screenshot saved)
~13h21 - : Alim steerer LI-str01 V et H ON (screenshot saved)
il ne senble pas y avoir de difference dqns les kicks entre
strLI ON I=0 et
strLI OFF
14h: scan COIL Gun : LI/STR01 pour centrer dans l'écran LI/SST, phase energy max (117°); iris 1.3mm
2 scan : 1 grand 100A - 300A, un autour du waist (saturation sinon, il faudrait un bouton 25% attenuation) 200A-270A.
ATTENTION : ==> saturation autour de 230A
On ajuste le code de calcul de la taille du faisceau. RMS statistic pris à +- 5sigma du fit gaussien
On relance le grand scan
==> le nouveau code est bien mieux ^^
16h15: scan COIL Gun : LI/STR01 pour centrer dans l'écran LI/SST, phase energy max (117°); iris 0.7mm
2 scan : 1 grand 100A - 300A, un autour du waist (saturation sinon, il faudrait un bouton 25% attenuation) 200A-270A.
ATTENTION : ==> saturation autour de 230A
16h45: scan COIL Section : LI/STR01 pour centrer dans l'écran LI/SST, phase energy max (116°) phase section min dispersion (234°); iris 1.3mm,
18h30 : On se rend compte que la charge est transmise entierement seulement a sol~ 230 - Des qu'on s'eloigne, on perd en charge.
cf screenshot
PS : Le plot Charge_VS_Soleno de la fin a ete fait avec StrLi 1 et 2 "Alignement section" + StrTL1_V = -8 A
|
VC-VM; Shift summary  
|
demarrage modulateur 8h50
"Perle" avait ouvert les portes de l'igloo.... le clés sont récupérées... Maher fait la ronde
Les personnes allant dans les fosses nord et sud doivent laisser les portes dans la position initiale!!
IHM cycling => deux "problemes" cyclage Ri-C1-PS-QP.05 et Ri-C2-PS-QP.02 (cyclage arreter à 12%) impossible
Une initialisation des DS cycling et de DS alim est nécessaire pour finir le cyclage
Pression SF6 2.5mB
Gun phase Emax 127°
LI str 01 H 2.2
LI str 01 V -1.7
Li str V 2.08
Li Str H -3.9
TL QP 1 -0.08
TL QP 2 3.4
TL QP 3 -3.4
Beam ON YAG TL1
Viktor try to optimize the alignement in the QPs 1-3 (à la main)
LI str 01 H 2.15
LI str 01 V -1.7
Li str V 2.16
Li Str H -3.84
TL QP 1 -0.08
TL QP 2 3.4
TL QP 3 -3.4
Passage dipole
DP0.1 159.3
Phase section 237°
beam at the midle of Yag TL2
dipole at 0
Looking at the beam position on BPM TL02 and Yag TL1
"MPS problemo à chaque fois que l'on éteind ou démarre le dipole on doit changer de mode de tir"
screen shot of beam jump (sst
arret laser loop position 11h15 => jump (11h21) not the laser loop
dipole off
11h45 pose déjeuné Vincent =>Modulator standby
What are the candidates for "noise" affecting BPM position :
- Laser
- Magnets Power Supply
- External field (Dipoles ? Motors ?)
- RF (Phase, ampliture, temperature )
- Synchro ?
Monitoring at 10 Hz to find any correlation :
BPMs LI/TL
Yag : BPMs
Laser : position
RF : All signals
To be
15h52 : Modulator swithed off ?? not understood why
Tomorrow all archiving will start from morning, to understand position jumps (seen on TL BPMs and Yag screen (Linac))
other variables could be important : Temperatures of RF : See attached plot, but variations seem to be low. Only Gun chiller seem to move.
We also did not see any jump in magnet powersupply currents.
|
SC, ND; Prise de données 20/09 9x
|
8h50 Mise en chauffe, cyclage aimants
Healthcheck:
- defaut sur le vide (resolu)
- Pb redpitaya (resolu)
9h11 Healthcheck OK
9h30: Beam on
11h53 Changement d'operateur: Slava, Hayg et Viktor
14:30 Acces pour recuperer le wattmetre dans la casemate.
autour de 16h : perte de base de donnée tango
16h19 : deuxième perte base de donnée tango (cf screenshot)
2 personnes connectees a distance sur Client1
17h28 problème avec le shutter laser (en orange), plus de faisceau
Etude du declenchement de TL/SST.02. La camera se declenche a +64ms (donc sur le tir suivant).
17h53 Changement operateur: Kevin et Hayg
Encore shutter laser qui se bloque.
18h44 : Bon ben impossible de redémarrer, Stop ThomX
|
MJ; Diags completement instables SUBITEMENT il y a 10 minutes.
|
Diags completement instables SUBITEMENT il y a 10 minutes. Plus possible de continuer le shift. QQun a-t-il fait qqchose de de lexterieur ??? |
KD MJ; shift du 19 septembre 2024
|
8h30: mise en chauffe de la machine
Programme de la journée :
* rafiner l'axe mag de la section
* trouver l'axe mag du triplet
* verifier les alignements (QP4, QP5, QP6, QP7)
* rafiner l'axe mag de la section
iris=0.8
50 pC
phase canon energie max = 131
Valeur Xop axe section :
** depart
srt1 [H,V] 1.62 , -1.45
srt2 [H,V] -3.95. , 2.24
** raffine
srt1 [H,V] 1.50 , -1.57
srt2 [H,V] -3.83 , 2.37
** phi_section de 240 a 190 --> delta_bpmTL1 [X,Y]= [1.5 , 0.7]
** Position a phi=240 :
yagTL1[X,Y] (pix) = [265 , 150]
bpmTL1[X,Y] (mm) = [-1.26 , 2.41]
Valeurs de mardi 17/09
** depart
srt1 [H,V] 2.03 , -3.30
srt2 [H,V] -4.19. , 4.16
** raffine
srt1 [H,V] 2.26 , -3.30
srt2 [H,V] -4.42 , 4.16
** phi_section de 240 a 190 --> delta_bpmTL1 [X,Y]= [1.8 , ~ 0.]
** Position a phi=240 :
yagTL1[X,Y] (pix) = [322 56] faisceau tout en haut ded l'ecran
bpmTL1[X,Y] (mm) = [0.63 3.38]
Avec strTL1_V=-3 A
yagTL1[X,Y] (pix) = [314 97]
bpmTL1[X,Y] (mm) = [-0.63 , 2.96]
Avec strTL1_V=-10 A
yagTL1[X,Y] (pix) = [326 166]
bpmTL1[X,Y] (mm) = [-0.18 2.95]
............... phase canon energie max devient 122 !!! ...........
* trouver l'axe mag du triplet Q1-Q3
Demarrage alignement Q1-Q3
str1 [H,V] 1.93, -2.08
str2 [H,V] -3.86 , 2.48
yagTL1[X,Y] (pix) = 346 270 [340 280] [340 230] [340 270] [348 270]
bpmTL1[X,Y] (mm) = 0.2 0.2 [0.23 -0.23] [0.4 0.3] [0.2 0.2] [0.1 0.1]
** phi_section de 240 a 190 --> delta_bpmTL1 [X,Y]= [1.5 , 0.5]
* verifier les alignements (QP4, QP5, QP6, QP7)
** Q4 : de -3A a 7A --> variation sur BPM_TL2 = ~1 mm en vertical --> a peu pres OK ...
** Q5 Q6 Q7 avec Q4=0 : alignes pour StrTL2_V = -6A
Q5 Q6 Q7 avec Q4 = 2A : alignes pour StrTL2_V = -3A
Mesure d'energie avec StrTL1 : 53.8 kin 54.3 tot
|
KD MJ HG; Shift du 17 septembre 2024 9x
|
9h: mise en chauffe (sauf cyclage)
remise de SF6: 2.4bars --> 2.6bars
programme :
Recherche axe mag section.
- Salva et Viktor ont essayé avec un minimisateur (xopt) mais sans grand succès.
- Scan des iris entrée sortie de la section en fonction de la charge
* point de départ STR1, STR2 [h,V] : [0.93,-1.1], [-2.86,1.86], soit une position entrée/sortie : [-0.31439928,-3.08606402] / [-62.13303283, 21.25588584]
Centre de l'iris trouvé est : [0.7382322948597554, -6.243958759809098] (cf. P.J.)
STR1_init = [1.19,-1.87]
STR2_init = [-3.15, 2.73]
* on scan la sortie à partir de ce point (+- 20mm autour du point init)
* Le scan n'est pas assez large (cf. P.J.) ==> on réitère 2 fois.
* on trouve : pos sortie [-68, 14.65]
* On recommence sur l'iris d'entrée avec le point initial : STR1, STR2 [h,V] : [1.29,-1.77], [-3.44,2.44], soit une position entrée/sortie : [0.76,-6.26] / [-68,15]
==> on trouve STR1, STR2 [h,V] : [2.06, -3.06], [-4.3, 3.89], soit une position entrée/sortie : [3.9,-11.5] / [-68,15]
** Alignement section +/- mm autour de Sec_in et Sec_out :
str1 [HV] [2.03 -3.30]
str2 [HV] [-4.19 4.16]
Le faisceau est tout en haut de l'ecran. Bon alignement = Ca bouge tres peu pour phase de 230 a 180 --> Cf screenshots
1) sans steerer TL1 (phase 230 et 180)
2) avec str_V_TL1 (-3 A) pour voir mieux (phase 230 et 180)
Fin de shift 20h00 |
Entered by Marie Jacquet from 134.158.205.56 on Mon Sep 16 23:59:00 2024; alignement section de lundi 16/09
|
Alignement section, bilan du jour :
En partant de Li/STR1 [H,V] : [0.93 , -0.9] Li/STR2 [H,V] : [-2.86, 1.41] (car je n'avais pas vu le elog du vendredi soir d'avant), on est arrive a :
- Li/STR1 [H,V] : [0.63, -1.05]
- Li/STR2 [H,V] : [-3.80, 1,86]
On a continue un peu en mettant du STR_H_TL1 pour ramener le faisceau qui etait arrive completement a gauche sur le YAGTL1 et donc plus possible de continuer en horizontal ...
On est arrive a :
str H1 : 0.73
str H2 : -3.95
A suivre ... |
VC; Shift summary
|
demarrage modulateur 9H
pression SF6= 2.45mB
iris 1.3mm
difficulté pour passer à 1215V (chauffage nécessaire à 1205 volt pendant 10mn)
charge max 163°
iris 0.8mm pour une meilleure détermination du barycentre
Emax 113 ° Q = 50pC
script mesure position YAG-BPM: commitionning_scripts/Linac/Energie/Save_BPM_and_YAG_LT_values
vérif soléno
Icol 245
YAG X-Y 476 223
BMP X-Y 1.39 1.69
Icol 105
YAG X-Y 369 313
BMP X-Y 1.54 0.45
Icol 180
YAG X-Y 372 292
BMP X-Y 1.53 1.24
pB camera YAG TL1 => appel Nicolas => OK dipole allumé par défaut!!!!!
13h20 arret de tous les aimants anneau
perte de 10° de phase dans le canon
NOUVELLE PHASE 15h
valeur steerer alignement section
H1 0.63
H2 -3.85
V1 -1.05
V2 1.81
soleno 220A
YagLI 301 326
BMP 2.4 0.17
Soleno 250A
YagLI 487 309
BMP 2.4 0.33
oleno 190A
YagLI 600 336
BMP 2.45 -0.06
VÉRIF ALIGNEMENT SECTION AVEC NOUVELLE PHASE (102° Emax)
LE FASCEAU SAUTE DE 1 MM SUR TL01
LA PHASE CANON À PERDU 14° (ON VA TOUT PETER DIT MARIE)
MAJ du code avec cette fois ci boucle sur la positions entrée et sortie section plutot que les steerers
on doit choisir les points les plus intéressants, demain après peut-etre un coup de trend pour voir les stabilités.
|
Entered by Super Team from 134.158.195.141 on Fri Sep 13 17:05:25 2024; Shift du Vendredi (soir)
|
- 6 dB d'atténuation sur le réfléchis du Canon pour éviter la saturation sur le Redpitaya
15h: mise en chauffe (laser PC resté allumé depuis hier !)
17h: mise en route faisceau
Programme :
* ajustement alignement section
on reprend à partir de l'alignement de mardi,
Iris : 1.3mm [5.403,2.34]
coil : 220A
Li/STR1 [H,V] : [0.93 , -0.9]
Li/STR2 [H,V] : [-2.86, 1.41]
scan autour de des valeurs horizontales à +- 1 A, beaucoup de point où le faisceau n'est pas dans l'écran
Difficile à trouver un point correct, surtout en Horizontal.
Arret à
Li/STR1 [H,V] : [0.93, -1.1]
Li/STR2 [H,V] : [-2.86, 1,86]
arret machine 21h30
|
Entered by Viktor Soskov from 134.158.195.153 on Fri Sep 13 11:22:05 2024; Faisceau laser UV 
|
Bonjour, voici l'images du faisceau laser UV actuel sur la cathode (Iris : D=2mm, D=6mm)
Viktor. |
Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 11 12:30:36 2024; tableau alignement section - v2
|
| |
VC KD; Commisionning linac set 2024
|
8h30 démarrage chauffage modulateur
9h: mise en chauffe laser, chiller et remise SF6 (2.4bars --> 2.6bars)
9H30 puissance Klystron ON 1215V
phase Emax canon 142
section att 2.56dB phase 239° dispartion min
|
SC, HG, MJ; Alignements : LASER - SOLENO - SECTION 
|
8h47 Mise en chauffe modulateur et chillers
- Phase Q max : 161 deg
1. ALIGNEMENT laser-cathod
a) Alignement dark current (X=5.2 Y=2.05)
phase =161 YAGLI X = 420 Y = 350
BPMLI X = - 0.9 Y = - 1.7
phase=154 YAGLI X = 400 Y = 300
BPMLI X = 1.1 Y = 0.9
--> DX_YAG = 20 DY_YAG = 50 DX_BPM = 2.0 DY_BPM = 2.6
b) Alignement BPM (X=5.41 Y=2.35)
phase =161 YAGLI X = 460 Y = 275
BPMLI X = 1.0 Y = 1.0
phase=154 YAGLI X = 450 Y = 290
BPMLI X = 1.2 Y = 1.0
--> DX_YAG = 10 DY_YAG = 15 DX_BPM = 0.2 DY_BPM = 0
c) Alignement YAG (X=5.404 Y=2.32)
phase =161 YAGLI X = 465 Y = 280
BPMLI X = 1.0 Y = 1.0
phase=154 YAGLI X = 440 Y = 290
BPMLI X = 1.25 Y = 1.0
--> DX_YAG = 25 DY_YAG = 10 DX_BPM = 0.25 DY_BPM = 0
--> Alignement BPM ou YAG equivalent -- Alignement DARK current moins bien
--> On se met a point cathode : X = 5.405 Y = 2.34 ( = moyenne BPM et YAG)
2. ALIGNEMENT SOLENO :
Check alignement soleno --> Realignement avec le script
Resultat :
LI/AE/COL.01-MOT.01 = 0.783 mm;
LI/AE/COL.01-MOT.02 = 3.427 mm;
LI/AE/COL.02-MOT.01 = 10.451 mrad ;
LI/AE/COL.02-MOT.02 = -4.359 mrad;
Check avec ces valeurs :
SOLENO = 250 YAGLI X = 480 Y = 300
BPMLI X = 1.5 Y = 1.7
SOLENO = 120 YAGLI X = 370 Y = 305
BPMLI X = 1.6 Y = 0.9
--> DX_YAG = 10 DY_YAG = 5 DX_BPM = 0.1 DY_BPM = 0.8 - Le script, meme apres plein de passages, ne donne pas mieux ...
3. ALIGNEMENT SECTION : L'alignement section a ete a reprendre car le point cathode est different (vu qu'on ne prend plus le point "dark current")
** Axe pas trop mal pour commencer : LI/STR.01 [H,V] = [0.93, -0.9]
LI/STR.02 [H,V] = [-2.86, 1.41]
** Tableau excel ensuite (cf resultat en pj)
** Pour demain : Tableau excel (prochain_alignement_section.xlsx) pour le vertical : en pj (Il faudra sans doute refaire un passage "tableau excel" plus fin en vertical apres celui-la).
PUIS : verifier ce que ce nouvel axe donne pour Q1-Q3 (= ok ? ou pas ok ?)
Salutti
|
Entered by Vincent Chaumat from 134.158.76.115 on Tue Sep 10 08:29:15 2024; Cablage Repitaya Baie 17
|
Les connexions des voies analogiques (puissance RF et photodiode du laser photocathode) jusqu'en salle de controle IHM signaux RF (dans IHM modulateur RF)
cables patchpannel redpitaya nom signal
11001 A1 2-A PIK
11012 A2 n.c. PRK
11006 A3 3-A PI GUN
11013 A4 3-B PR GUN
11007 A5 1-A PI SEC
11014 A6 1-B PR SEC
11008 A7 4-B Photodiode
11015 A8 2-B Load SEC
11011 A9 4-A LOOP GUN |
KD-VM-VC; shift du 4 septembre 2024  
|
8h42 : mise en chauffe (Laser, modulateur, chiller et cyclage aimants)
SF6 : 2.6bars
Energye canon 4.75MeV (att 0.5dB)
Mesure Energie sortie section (Steerer) : 53.21 MeV (att 2.52dB)
12h33: intelock modulateur (pas de difficulté à reprendre)
axe mag QP1-QP3 (to be refined) [-0.08,3.4,-3.4] : trouvé avec Align_Quad.py
LI/STR.01 [H,V] = [1.49, -0.86]
LI/STR.02 [H,V] = [-3.32, 1.85]
Position BPM : [0.6,0.1] mm
position YAG : [420, 285]pix calib (27.8, 28.6 um/pix)
QP1 - QP3 [0,0,0] :
Position BPM : [0.6,-0.2] mm
position YAG : [360, 280]pix calib (27.8, 28.6 um/pix)
axe section : trouver par dicotomy (fichier excel)
LI/STR.01 [H,V] = [0.93, -0.8]
LI/STR.02 [H,V] = [-2.86, 2.01]
Position BPM : [0.5,0.7] mm
position YAG : [370, 230]pix calib (27.8, 28.6 um/pix)
La fluctuation du pointé entre axe section et QP semble équivalente, pour 80deg phase section (203° -> 283°)
section : (~1mm en X, et 0.5mm en Y, au BPM)
mag QP : (~1mm en X, et 0.5mm en Y, au BPM), avec un changement de signe de la dérive au milieu ~ 253°
==> quand aligné dans QP1-QP3, QP4 semble bon !
On a fini notre shift ^^
|
SC, KD, HG MJ; Alignement laser et section + Mesures
|
9h Mise en chauffe modulateur et chiller, reseau rf rempli de sf6 de 2.2 bar à 2.6bar
Permis zone de stockage en rouge : PSS interdit
Problème avec le laser photocathode, pas de faisceau laser : Résolu mais le laser clignote sur la camera
position iris : en gris sur atk panel mais cela fonctionne
10h20 Problème MPS, modulateur interdit, résolu apres allumage des dipoles li et el
10h52 Consignes canon et section ? Quelles sont elles ? --> canon 31.75 section 29.2
Alignement laser photocathode
a) Avec Dark Current (script Kev) --> noter valeurs x=5.2 y=2.05
b) Avec faisceau (script Kev) --> noter valeurs x=5.41 y=2.35
Checker alignements a) et b), prendre le meilleur entre a) et b) : phase charge max -3 (ou plus) --> Dispersion sur YAG_LI
Range de phase pour check : pĥase_foc_max -7
a) Amplitude : YAG 22 pixels BPM 3
b) Amplitude : YAG 27 pixels ; BPM 0.5 mm
On passe a energie max (ph=123)
Position moteur soleno (Alignement BPM) : LI/AE/COL.01-MOT.01 = 0.8 mm; LI/AE/COL.01-MOT.02 = 3.3 mm; LI/AE/COL.02-MOT.01 = 10.201 mrad ; LI/AE/COL.02-MOT.02 = -4.9 mrad;
phase de 115 a 135 --> Yag 64 pixel (c'est plat un point deconnant) ; BPM 0.19
soleno 220 YAG position 481 257
soleno 150 YAG position 377 302
Position moteurs soleno (align courant obscur) : LI/AE/COL.01-MOT.01 = 1.32 mm; LI/AE/COL.01-MOT.02 = 3.32 mm; LI/AE/COL.02-MOT.01 = 7.58 mrad ; LI/AE/COL.02-MOT.02 = -3 mrad;
phase de 110 a 130 --> Yag 19 pixel (c'est plat) ; BPM 0.13
soleno 220 YAG position 358 300
soleno 150 YAG position 334 300
On garde ALIGN courant obscurite
Charge canon environ 140
on passe la section avec
Steerer str1h -0.94 str2h -0.97 str1v 0.5 str2v 0.66
phase section 238 att 2.5 db
Mesure energie steere strTL1 53.9 mev
Alignement section :
** Les 8 chemins en vertical sont hors écran, trop de déviation du faisceau
** Dans les chemins horizontaux, Marie traite les données. Un tableau sera envoyé pour demain avec des plus petites amplitudes de steerers
Energie en fonction de la phase section :
phase entre 180 et 300 degres (cf plot)
Taille faisceau en fonction de I solénoide : I variant entre 100 et 240 (A refaire plus tard avec plus de points)
Les BPM_TL1 et TL2 NE FONCTIONNENT DE NOUVEAU PAS --> donc arret shift car pas possible de faire sans
|
Entered by Vincent Chaumat from 134.158.76.115 on Fri Aug 30 15:15:02 2024; Synchro
|
La synchro est opérationnelle.
pB de redemarrage des hardwares avant les serveurs du coup pas de connexion réseau
|
KD; mesure laser PC du 20 aout 2024  
|
Mesure du Laser Photocathode le 20 aout 2024:
prise de la forme du faisceau sur la PhotoCathode Virtuelle pour différente taille d'iris : 7mm (ouverture max), 3mm, 1.3mm
Prise de puissance laser atténuateur à 410 pas :
sortie Laser : 295 uJ
Sortie Iris :
1.3mm : 70uJ
7mm (ouverture max) : 202 uJ
Entree canon :
iris 1.3mm : 53 uJ
iris 7mm (ouverture max) : 135 uJ
l'Iris a ete reconfigurée (bug dans le retour de position).
|
KD MJ VK; shift du 21 aout 2024   
|
9h20 : mise en chauffe de la machine (modulateur, laser, frigo)
9h25 : pression SF6 remise 2.2 bars -> 2.6 bars
9h30 : alimentation éléments magnétiques rallumées
Problème avec les solénoïdes qui restent en erreur (h-external), il semble y avoir un interlock soft, mais d'où ? Le surpresseur derrière les chillers était OFF (problème résolu)$
11h: démarrage faisceau
On met l'atténuateur canon à 3dB et on ajuste la température. On déscend l'atténuateur pour obtenir un dark current (-15mV sur wavecatcher).
On ajuste le delai pour remettre la courbe vers le canal 500 (delais précédent -6.23us, nouveau delais -6.38us)
iris x=5.2 y=2.05
steerer a zero bpmLI x -0.5mm y +1mm
Mesure d'energie sortie canon
attenuateur 1db : 4.65 MeV
0.8 : 4.71 MeV
0.5 : 4.77 MeV
On passe la section et change le delai du wac2 pour l'ict TL01. Nouveau délai -6.3us
Mesure de l'energie avec steerer TL1
phase section 190 energy=42.9 MeV
200 energy =46.4
210 ernegy = 46.3
Avec soleno=180 faisceau pas beau. Soleno 200 bien mieux
On rafine l'énergie avec le dipôle et TL/SST.02
Pour 50 MeV :
attenuateur 2.5 dB
Phase section 238°
On vérifie la température section (on change la température et on regarde quand le gradient est le plus fort) :
temperateur optimum (à min dispersion) : 29.5 - 30°C clarinette.
==> on a produit du faisceau à 50MeV, approximativement aligner.
On peut commencer les mesures et la ajustements de l'injecteur.
17h30 : arrêt machine
Données:
* alignement QP1-QP3 :
LI/STR.01 [V,H] = [0.5,-0.94]
LI/STR.02 [V,H] = [0.66,-0.97]
* Alignement PhotoCathode dark current :
iris x=5.1 y=2.55
* Image faisceau LI/SST Col @220A (218A relu)
* Image faisceau TL/SST.01 Col @220A (218A relu), quad [-0.18,3.4,-3.4]
* image faisceau TL/SST.02 @50MeV
* recette delais sauvé : "20240821_1402.xml"
Calibration écran fait (cf. ppt) |
M ELK; validation de conditionnement 16/08 
|
Vérification Pression SF6 =2.45 bar
Vérification Températeure chiller Clarinette =30°C (consigne 29.20°C)
Vide section sans HF @ 30 °C: In section 4.8 10-10 mbar & Out section 6.1 10-10 mbar
Signaux RF mesurés :
avec Oscillo :
orange : reflechi section Prs
violet: incident section Pis
vert: refléchi Klystron Prk
jaune : incident Klystron Pik
avec la carte Redpitaya:
vert : puissance transmise dans la charge fin de section Pchargesection
rouge : puissance reflechi section Prs
blue: puissance incidente section Pis
Reprise conditionnement 3µs & 25 Hz et faire durer le conditionnement à l'étape de la puissance nominale (att. sec = 0.1 dB correspondant à Pisection =24 MW)
* Mettre Att. sec @ 10 dB
* Augmenter progressivement HT de Alim=1000 V (HT=244 kV )@ Alim=1215 V (HT=289 kV) correspondant à Pik=33 MW.
* Faire baisser Att. sec progressivement
A partir de la valeur att. sec =1 dB on baisse l'att sec d'un pas de 0.1 dB. Quelques points de mesure ci-dessous:
Att sec = 1 dB (Pis= 19.6 MW) ==> vide In section 5.3 10-9 mbar & vide Out section 1.6 10-9 mbar
Att sec = 0.9 dB (Pis= 20 MW) ==> vide In section 5.8 10-9 mbar & vide Out section 2.3 10-9 mbar
Att sec = 0.5 dB (Pis= 22 MW) ==> vide In section 5.7 10-9 mbar & vide Out section 3.8 10-9 mbar
Att sec = 0.2 dB (Pis= 23.6 MW) ==> vide In section 4.9 10-9 mbar & vide Out section 3 10-9 mbar
12h55 : Att sec = 0.1 dB (Pis= 24 MW) ==> vide In section 4.6 10-9 mbar & vide Out section 2.6 10-9 mbar ==> voir capture ecrans RF signals jointes
16h30 : Att sec = 0.1 dB (Pis= 24 MW) ==> vide In section 2.8 10-9 mbar & vide Out section 1.7 10-9 mbar ==> Au bout de 3 heures et demi, @ Pis=24 MW la pression In section baisse et reste stable à 2.8 10-9 mbar et la pression out section baisse et reste stable autour de 1.7 10-9 mbar . Ceci dit que la dynamique de pompage est lente.
NB: Parfois il y a eu des coupures HF (2 dans la journée ) sans aucun réflechi visible sur le scope ==> le vide de la section est stable au moment de la coupure HF (Trig se fait facilement au meme niveau de puissance)
Conclusion: * Le conditionnement a été effectué jusqu'à la largeur d'impulsion RF de 3 µs et une fréquence de répétition de 25 Hz et à la puissance nominale entrée section (Pis=24 MW) .
* Je considére que le conditionnement de la section RI est validé à cette étape .
|
|