Entry   Entered by SC from 134.158.195.141 on Thu Mar 30 13:34:57 2023; Faisceau Linac 
Entry   MJ KD; shift du 04 avril 2023 
Entry   KD, ND, Lisa; shift du 13 avril 2023 11x
Entry   KD VM VK JN SL; shift du 5 mai 2023 Screenshot_from_2023-05-05_17-25-28.pngScreenshot_from_2023-05-05_17-13-31.pngScreenshot_from_2023-05-05_17-13-41.pngScreenshot_from_2023-05-05_17-52-52.pngScreenshot_from_2023-05-05_17-50-31.png
Entry   ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
Entry   LS, ND, IC, VK; Ring operation 16/5 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png
Entry   MJ, KD; RF et anneau 24_4mm.png22_4mm.png
    Reply   MJ, KD; RE: RF et anneau 
Entry   ND, LS, MB, DN, MA, IC, VK, MEK, JNC, MJ, RC; X-rays attempt 22/06 10x
Entry   LS,ND; run du 30 juin 2023 health_check_2023_06_30_13_20.pngscan_charge_phase_min_280.0_max_320.0_10_54_10.png
Entry   Opérateurs ThomX; shift du 25 juillet 2023 13x
Entry   KD; shift du 26 juillet 2023 image_00123.jpgreference_spectrum_ThomX.bmpspectre_ref_diode.mca
Entry   KD; redémarrage machine 21/08/2023 2023-08-21_15_59_49_li_op_las_02_profile_laser_PC_log_scale_True_despeckle_False_Auto_scale_True.pngScreenshot_from_2023-08-21_17-54-55.png
Entry   RC, DN, VC, ND; Operations 21/09  scan_Laser_vs_RF_phase_2023_09_21_15_53.png
Entry   ND, Marie Labat; Reglage Cerenkov 29/9 health_check_2023_09_29_11_58.pngscan_Laser_vs_RF_phase_2023_09_29_12_02.png
Entry   VC, Marie Labat, ND; Mesures pour la streak signal_Cerenkov.jpg
Entry   KD, MJ, RC; shift du 15 novembre 2023 6x
Entry   VC/SC; Commissionning LE 
Entry   ND, Nida Riaz, Alfred Mishi; Shift summary 20/11/2023 health_check_2023_11_20_10_49.pngscan_Laser_vs_RF_phase_2023_11_20_10_58.pngcentrale_desactivee.jpg
Entry   VC-KD; commitionning 10x