HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 15 of 62  Not logged in ThomX    logo
Entry   Entered by SC from 134.158.195.141 on Thu Mar 30 13:34:57 2023; Faisceau Linac 
Entry   MJ KD; shift du 04 avril 2023 
Entry   KD, ND, Lisa; shift du 13 avril 2023 11x
Entry   KD VM VK JN SL; shift du 5 mai 2023 Screenshot_from_2023-05-05_17-25-28.pngScreenshot_from_2023-05-05_17-13-31.pngScreenshot_from_2023-05-05_17-13-41.pngScreenshot_from_2023-05-05_17-52-52.pngScreenshot_from_2023-05-05_17-50-31.png
Entry   ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
Entry   LS, ND, IC, VK; Ring operation 16/5 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png
Entry   MJ, KD; RF et anneau 24_4mm.png22_4mm.png
    Reply   MJ, KD; RE: RF et anneau 
Entry   ND, LS, MB, DN, MA, IC, VK, MEK, JNC, MJ, RC; X-rays attempt 22/06 10x
Entry   LS,ND; run du 30 juin 2023 health_check_2023_06_30_13_20.pngscan_charge_phase_min_280.0_max_320.0_10_54_10.png
Entry   Opérateurs ThomX; shift du 25 juillet 2023 13x
Entry   KD; shift du 26 juillet 2023 image_00123.jpgreference_spectrum_ThomX.bmpspectre_ref_diode.mca
Entry   KD; redémarrage machine 21/08/2023 2023-08-21_15_59_49_li_op_las_02_profile_laser_PC_log_scale_True_despeckle_False_Auto_scale_True.pngScreenshot_from_2023-08-21_17-54-55.png
Entry   RC, DN, VC, ND; Operations 21/09  scan_Laser_vs_RF_phase_2023_09_21_15_53.png
Entry   ND, Marie Labat; Reglage Cerenkov 29/9 health_check_2023_09_29_11_58.pngscan_Laser_vs_RF_phase_2023_09_29_12_02.png
Entry   VC, Marie Labat, ND; Mesures pour la streak signal_Cerenkov.jpg
Entry   KD, MJ, RC; shift du 15 novembre 2023 6x
Entry   VC/SC; Commissionning LE 
Entry   ND, Nida Riaz, Alfred Mishi; Shift summary 20/11/2023 health_check_2023_11_20_10_49.pngscan_Laser_vs_RF_phase_2023_11_20_10_58.pngcentrale_desactivee.jpg
Entry   VC-KD; commitionning 10x