Entry   VC, KD, VM, ND, RC, MJ; shift  Screenshot_from_2025-02-18_17-52-13.pngScreenshot_from_2025-02-18_17-51-17.pngScreenshot_from_2025-02-18_17-49-55.pngScreenshot_from_2025-02-18_17-58-05.pngScreenshot_from_2025-02-18_17-59-46.png
demarrage machine 8h30

intervention Kicker.. 8h45 

10H30 fin intervention Kicker Ok
Entry   VM, IC, VK; 70 MeV WP 
10h30 Start beam

Since Friday evening the problem to store the beam at 70 MeV. There is 1 turn only. Probably some subsystem failure. At this moment the reason
is not found. Help is needed: synchronization/Diag/Magnets.
Entry   Entered by Super Team from 134.158.195.141 on Fri Feb 14 08:21:09 2025;  
08h20 Start ThomX: modulator, laser, fridge,cycling all magnets

08h25 chillers are started

09h50 Controlled access (Rhonic)
Entry   ND, SC, Marie Labat, IC, VM; Opérations caméra à balayage / MRSV 20x
8h50 Mise en chauffe modulateur

Changement de la carte mère pour la badgeuse de la ligne X

31.2degres, toujours dAlignement laser dans la casemate
Entry   KD MJ; shift du 12 février 2025 - Alignements 2025-02-12-Shift.pngaxes_BPM_calib.jpgaxes_BPM_nocalib.jpg
8h: mise en chauffe à distance (modulateur, frigo, chiller, laser)

9h30: laser semble pas aligné dans l'iris avec une forme assez étrange (trou au centre) ==> énergie sortie laser
PC 270uJ
Entry   ND, Marie Labat; Streak camera 20250211_173802.jpg20250211_174708.jpg
9:20 Start aligning

12:40 Alignement done for both linac and ring.

Health check: Archiving not working
Entry   ND, VC, HG, MJ; Test demarrage 10/02 7x
9:37 Mise en chauffe

Maher signal que des tests ont ete fait sur le canon, leger risque de claquage.

Pression SF6: 2938mbar
Entry   MV, IC, VK, RC;  Screenshot_from_2025-01-24_17-35-38_61p5MeV.pngScreenshot_from_2025-01-24_17-34-48_61p5MeV.pngScreenshot_from_2025-01-24_17-34-23_61p5MeV.png
08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)
Entry   MV, IC, VK, RC;  
08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)
Entry   Ring team; Ring Working Points 50 MeV/ 61.5 MeV / 70 MeV 8x
50 MeV

Configuration: good_20250123_17_53_01 "Working Point at 50 MeV for X_rays"

After RCDS optimization with X-rays good_20250124_15_05_25 "Updated WP with RCDS on X-rays 50 MeV "
Entry   MV, IC, VK, RC;  
08h41 Start Thomx: Modulator, Frigo, Laser

08h46 Start chillers, all magnets sycling

09h50 Start RF
Entry   MJ HG;  Q_vs_SolenoScan_at_17-21-28.png
** Alignement Q1Q3 du jour

str1H 0.69
str1V -3.03
Entry   MJ KD; align Q1Q3 et pt fonctionnement 61.5 MeV sst03_61_5MeV_2025-01-21_16-50-30.pngtbtsum_sansRF_61_5MeV.png
*** Alignement meca Q1Q3

9h30 : 1 tour de cle Q3 vers le mur ( = retour a la position initiale)
Mesure en faiseau Q1Q3 versus Q4Q7 + Mesures confrontees a simu dipole  ==>  14h : 1 Tour de cle Q3 vers le mur (+ 1/2 tour
Entry   KD; shift du 21 janvier 2025 
8h10 : mise en chauffe à distance (modulateur, laser, frigo/chiller)
Entry   MV, IC, VK;  16x
08h43 Start ThomX: Modulator, frigo, laser, cycling all magnets

08h50 Chillers started

09h52 HV is 'On'
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Jan 16 11:57:39 2025; Resultats Tour de cle Q1-Q3 - Shift 15/01 Tour_de_cle_Q1Q3.png
Prise de donnees axe Q1Q3 du 14/01

Steerers  Axe q1q3     : str1[H V] = [2.45 -1.83]  
                                     
Entry   VM, IC, VK;  10x
08h25 Start ThomX: Modulator, frigo

08h35 Start chilers, laser, cycling all magnets

10h05 HV is 'On'
Entry   MJ KD VC HG; shift du 15 janvier 2025 7x
8h15 : mise en chauffe de la machine à distance (modulateur, laser, frigo, chiller)

faisceau Linac et TL non déviée  => manip pour la comphéension des sauts.
Pos laser H4.374 V3.36
Entry   KD; alignement laser PhotoCathode 
Mesure de ce matin et changement point cathode [H,V] = [4.29,3.49]:

sortie laser : 275 - 280uJ

sortie ligne de transport : 184uJ
Entry   KD MJ VC HG; shift du 14 janvier 2025 
7h50 : mise en chauffe machine à distance (chiller, frigo, modulateur, laser)
9h15 re demarrage du serveur LI/OP/LAS.02 => External_trigger_multi  
redemarrage serveur feedback laser   astor/salle control/client5/ThomX_Photocathode