HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 10 of 62  Not logged in ThomX    logo
Entry   ND, Manon Philit, Janine Issa; Shift summary 25/10 2024-10-25_12_25_26_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngscan_2024_10_25_16_36.pngscan_2024_10_25_16_41.pngscan_2024_10_25_16_51.png
Entry   ND, MEK; Conditionnement section condj1.pdf
Entry   ND, LS, MB, DN, MA, IC, VK, MEK, JNC, MJ, RC; X-rays attempt 22/06 10x
Entry   ND, LS, IC, VM, VK; Prise de donnee 27/4/2023 10x
Entry   ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
Entry   ND, LS, IC, VK, VM; Studies on the Ring revolution frequency 8x
    Reply   ND, LS, IC, VK, VM; RE: Studies on the Ring revolution frequency 
Entry   ND, LS; Prise de donnee 26/4/2023 2023-04-27_14_41_46_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png2023-04-27_14_43_34_el_dg_sst_01-ccd_01_RAW.png
Entry   ND, LS; ThomX operations 26/6 
Entry   ND, IC, VK, VM, ME; Shift 8/12 14x
Entry   ND, IC, VK, VM; Shift àf 3/11/2022 9x
Entry   ND, IC, VK, VM; Prise de donnee 6/01 9x
Entry   ND, IC, VK, VM; Optimisation LE scan_ext_kicker_from_-8150_to_-8050_step_5.pngscan_ext_kicker_from_-8100_to_-8080_step_1_v2.pngscan_EL_PS_DP_01.pngScreenshot_from_2025-01-09_17-49-53.pngScreenshot_from_2025-01-09_17-52-20.png
Entry   ND, Enzo Crou, Noé Idesheim, Jean-Nicolas Quenot; Prise de donnee 16/3/2023 17x
Entry   ND, Camille Cheney, Mohamed ; Prise de donnees 16/12 9x
Entry   ND, Anna K, Elene K, Marie L; Prise de donneees 5/02 mrsv_nobeam.pngmrsv_beam.png
Entry   ND, Anna K, Elene K; Data taking 26/01 7x
Entry   ND, AM, VC, ML, SC; Programme faisceau 15/9 2022-09-15_scan_charge_phase.png
Entry   ND VC; Shift summary 
Entry   ND + JM + HG; Prise de données 24/11  
ELOG V3.1.4-395e101