Message ID: 999     Entry time: Fri Jan 17 08:44:09 2025
 Author: MV, IC, VK 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject:  
 Icon:  

08h43 Start ThomX: Modulator, frigo, laser, cycling all magnets

08h50 Chillers started

09h52 HV is 'On'

10h08 HV=1215V

10h25 RF Gun Phase is 153 dg., Sect Att. is 2.5 dB, Phase is 206 dg. Charges: -107 pC, -107 pC, -113 pC

10h30 Beam injected to the ring, Receipt from 16/01/2025  18:03 TL/BPM02 X=+2mm, without RF the ring orbit is low (all negative)

11h00 RF is 'On', 100kV

11h07 FR 150 kV; to minimize synchrotron oscillations TL/BPM02 X=+2 mm

11h33 Vacuum interlock, restarted

12h28 FPC table Scan

12h40 FPC table scan: sigma Y=171 um

13h33 FPC table scan: sigma Y=156 um

13h57 RF voltage set to 250kV

14h20 FPC table scan: sigma Y=179 um

14h25 The ring optics from 10-Jan-2025 11h03 loaded

Vertiacl tune studies. Steptune 0.05 several tilmes , vertical tune start to be pronounced; Tune correction towards the nominal one 0.64;

15h27 FPC table scan: sigma Y=126 um

16h00 FPC table scan: sigma Y=121 um

For all scans FPC power 90 kW, laser size was 70 um

17h35 Stop Thomx

 

Attachment 1: Screenshot_from_2025-01-17_17-26-25.png  176 kB  Uploaded Fri Jan 17 17:33:07 2025  | Show | Hide all | Show all
Attachment 2: Screenshot_from_2025-01-17_17-20-47.png  181 kB  Uploaded Fri Jan 17 17:33:07 2025  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2025-01-17_16-06-37.png  41 kB  Uploaded Fri Jan 17 17:33:07 2025  | Show | Hide all | Show all
Attachment 4: Screenshot_from_2025-01-17_15-35-59.png  48 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-17_15-35-59.png
Attachment 5: Screenshot_from_2025-01-17_15-06-53.png  312 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-17_15-06-53.png
Attachment 6: Screenshot_from_2025-01-17_15-06-25.png  310 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-17_15-06-25.png
Attachment 7: Screenshot_from_2025-01-17_14-35-44.png  334 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-17_14-35-44.png
Attachment 8: Screenshot_from_2025-01-17_14-21-51.png  42 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-17_14-21-51.png
Attachment 9: Screenshot_from_2025-01-17_14-20-32.png  42 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-17_14-20-32.png
Attachment 10: FIRSTvertSCQN.png  47 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
FIRSTvertSCQN.png
Attachment 11: Screenshot_from_2025-01-17_13-44-48.png  40 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-17_13-44-48.png
Attachment 12: Screenshot_from_2025-01-17_13-33-41.png  275 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-17_13-33-41.png
Attachment 13: Screenshot_from_2025-01-17_13-33-32.png  189 kB  Uploaded Fri Jan 17 17:33:07 2025  | Show | Hide all | Show all
Attachment 14: Screenshot_from_2025-01-17_12-53-41.png  86 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-17_12-53-41.png
Attachment 15: Screenshot_from_2025-01-17_12-36-29.png  264 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-17_12-36-29.png
Attachment 16: Screenshot_from_2025-01-17_11-53-49.png  177 kB  Uploaded Fri Jan 17 17:33:07 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-17_11-53-49.png
ELOG V3.1.4-395e101