Message ID: 997     Entry time: Thu Jan 16 08:28:07 2025
 Author: VM, IC, VK 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject:  
 Icon:  

08h25 Start ThomX: Modulator, frigo

08h35 Start chilers, laser, cycling all magnets

10h05 HV is 'On'

RF gun phase is 161 dg., Dark current about 25 mV, Att. Sect. is 2.53 dB, phase is 213 dg., Charges: -101 pC, 99. pC, -109 pC

Linac steerers: H [2.63 -4.38], V [-2.03 2.47]

10h20 RF cavity; problem with amplifier: fixed

10h25 Beam injected to the ring without RF, RCDS on the transfer line

10h45 RF is 'On'  150kV, phase -58.5 dg. TL/BPM02 X=0 

10h55 Receipt saved (I dp in ring at 159.3 A)

LOCO

11h38 Jump in Vertical position at TL/BPM01 on +1mm. Storage drops

Change the linac steerer V1 to -2.23 TL/BPM01 Y=-0.5 mm

12h16 Start feedback on the TL/BPM.01 position X=0, Y=-0.5

14h30 Start cycling dipoles and quads of the ring

14h43 The receipt from 10h55 loaded. Storage restored

15h10 ring settings with I dp = 160.4 A loaded (from the receipt of 20250110_11_04)

18h05 Stop ThomX

 

 

 

 

 

 

Attachment 1: Screenshot_from_2025-01-16_17-16-28.png  267 kB  Uploaded Thu Jan 16 17:24:49 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-16_17-16-28.png
Attachment 2: Screenshot_from_2025-01-16_16-56-04.png  73 kB  Uploaded Thu Jan 16 17:24:49 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-16_16-56-04.png
Attachment 3: Screenshot_from_2025-01-16_11-33-59.png  172 kB  Uploaded Thu Jan 16 17:24:49 2025  | Show | Hide all | Show all
Attachment 4: Osc_StorageChargeCH4Screenshot_from_2025-01-16_11-27-32.png  187 kB  Uploaded Thu Jan 16 17:24:49 2025  | Show | Hide all | Show all
Attachment 5: Screenshot_from_2025-01-16_11-10-02.png  115 kB  Uploaded Thu Jan 16 17:24:49 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-16_11-10-02.png
Attachment 6: Screenshot_from_2025-01-16_11-07-11.png  137 kB  Uploaded Thu Jan 16 17:24:49 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-16_11-07-11.png
Attachment 7: Screenshot_from_2025-01-16_11-04-28.png  53 kB  Uploaded Thu Jan 16 17:24:49 2025  | Show | Hide all | Show all
Attachment 8: Screenshot_from_2025-01-16_11-01-48.png  49 kB  Uploaded Thu Jan 16 17:24:49 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-16_11-01-48.png
Attachment 9: Screenshot_from_2025-01-16_10-46-29.png  178 kB  Uploaded Thu Jan 16 17:24:49 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-16_10-46-29.png
Attachment 10: Screenshot_from_2025-01-16_10-46-15.png  219 kB  Uploaded Thu Jan 16 17:24:49 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-16_10-46-15.png
ELOG V3.1.4-395e101