Message ID: 990     Entry time: Thu Jan 9 08:35:10 2025
 Author: IC, VK, VM, ND 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring 
 Important:
 Subject:  
 Icon:  

08h35 Start ThomX: Modulator, Frigo, All magnets.

08h40 Cicling all magnets, Start Chillers 

10h00 HV is 'On'

Modulator Interlocks at HV=1215V

10h25 HV=1215 V

Rec. from 20241219 18:14

Linac Steerers: H [2.38 -4.16],  V [-1.70 2.15]

RF Gun Phase is 199.0 dg., RF Gun Att. is 0 dB, (Dark Current is 18 mV, too low), Sect. Att. 2.53 dB, Sect. Phase is 221 dg.

Charges: -106 pC, -107 pC, -116 pC

10h50 Beam is injected to the ring

Trying the LOCO

12h35 Modulator Interlocks at HV=1215V, Went to 1200 V. Did not help even at 1000V (Maher's intervention needed).

13h00 This is the problem with triggering. When triggered internally, the modulator is working.

13h07 OK at HV=1215 V (Unknown reason). Nikolas said miss triggering is less than 5%

13h20 Linac frequency was changed a little bit to diminish miss triggering

18h00 Stop ThomX

 

 

Attachment 1: Screenshot_from_2025-01-09_16-00-44.png  60 kB  Uploaded Thu Jan 9 16:01:43 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-09_16-00-44.png
Attachment 2: Screenshot_from_2025-01-09_14-24-06.png  22 kB  Uploaded Thu Jan 9 16:01:43 2025  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2025-01-09_11-11-21Change_inRingChargedueLinacEnrgy.png  22 kB  Uploaded Thu Jan 9 16:01:43 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-09_11-11-21Change_inRingChargedueLinacEnrgy.png
Attachment 4: TL_SST01_Screenshot_from_2025-01-09_10-34-15.png  357 kB  Uploaded Thu Jan 9 16:01:43 2025  | Hide | Hide all | Show all
TL_SST01_Screenshot_from_2025-01-09_10-34-15.png
Attachment 5: Screenshot_from_2025-01-09_10-32-26.png  35 kB  Uploaded Thu Jan 9 16:01:43 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-09_10-32-26.png
Attachment 6: Screenshot_2025-01-09_10-30-03.png  123 kB  Uploaded Thu Jan 9 16:01:43 2025  | Hide | Hide all | Show all
Screenshot_2025-01-09_10-30-03.png
Attachment 7: Screenshot_from_2025-01-09_16-03-40.png  142 kB  Uploaded Thu Jan 9 16:05:16 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-09_16-03-40.png
Attachment 8: Screenshot_from_2025-01-09_16-31-08.png  84 kB  Uploaded Thu Jan 9 16:31:31 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-09_16-31-08.png
Attachment 9: Screenshot_from_2025-01-09_17-55-28.png  114 kB  Uploaded Thu Jan 9 18:01:51 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-09_17-55-28.png
Attachment 10: Screenshot_from_2025-01-09_17-52-20.png  62 kB  Uploaded Thu Jan 9 18:01:51 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-09_17-52-20.png
Attachment 11: Screenshot_from_2025-01-09_17-49-53.png  39 kB  Uploaded Thu Jan 9 18:01:51 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-09_17-49-53.png
Attachment 12: Screenshot_from_2025-01-09_17-39-00.png  56 kB  Uploaded Thu Jan 9 18:01:51 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-09_17-39-00.png
Attachment 13: Screenshot_from_2025-01-09_17-38-38.png  49 kB  Uploaded Thu Jan 9 18:01:51 2025  | Show | Hide all | Show all
Attachment 14: Screenshot_from_2025-01-09_17-38-03.png  139 kB  Uploaded Thu Jan 9 18:01:51 2025  | Hide | Hide all | Show all
Screenshot_from_2025-01-09_17-38-03.png
Attachment 15: TrendTBTSumScreenshot_from_2025-01-09_18-06-08.png  31 kB  Uploaded Thu Jan 9 18:07:22 2025  | Hide | Hide all | Show all
TrendTBTSumScreenshot_from_2025-01-09_18-06-08.png