08h23 Start ThomX

09h40 HV is 'On'

10h24 RF Gun Phase 183 dg. Sect. Att. is 2.533, Phase 212 dg. Charges; -100.0 pC, -93.0 pC, -109.0 pC, Linac steerers H [2.68 -4.4], V [-2.0 2.19]

10h35 Loading receipt from 06/12/2024 11h30, Thereis storage at freq. 500.10045 MHz, 100 kV

12h34 RF Gun Phase 181 dg. Sect. Att. is 2.553, Phase 219 dg. Charges; -106.0 pC, -100.0 pC, -112.0 pC, Linac steerers H [2.68 -4.4], V [-2.0 2.19]

Adjusting the vertical orbit to BPM1 and BPM2 (-1 mm and -1.5 mm respectively) reduces the vertical spot size on the MSRV camera

Checking BBA

14h00 Controlled access to the bunker to check the X-line shutter

15h00 HV is 'ON'

17h15 Stop ThomX

 

Attachment 1: Screenshot_from_2024-12-13_11-28-46.png  439 kB  Uploaded Fri Dec 13 17:18:03 2024  | Hide | Hide all | Show all
Screenshot_from_2024-12-13_11-28-46.png
Attachment 2: Screenshot_from_2024-12-13_14-44-28.png  3.552 MB  Uploaded Fri Dec 13 17:18:03 2024  | Hide | Hide all | Show all
Screenshot_from_2024-12-13_14-44-28.png
Attachment 3: Screenshot_from_2024-12-13_14-46-59.png  2.606 MB  Uploaded Fri Dec 13 17:18:03 2024  | Show | Hide all | Show all
ELOG V3.1.4-395e101