7h50: mise en chauffe en remote (chiller, frigo, laser, modulateur)
Demarrage alignement sur l'axe du CdTe pour prendre un spectre 70 MeV
12h20 HV is 'Off', Stop RF to go to bunker
- SHUTTER ligne X en defaut - Essai de resoudre le probleme, sans succes -
Appel Harold
13h20 HV is 'On'
Investigation on the X-rays
Several vertical scans
In the single trigger mode the vertical scans give sigma ~70-80 um while in the normal mode (10 Hz injection) the scan is very wide. The results are in agreement with the shape of the beam on MRSV. Should be understood.
The storage is good at 70 MeV
18h10 End of the shift
|