Message ID: 979     Entry time: Thu Dec 12 07:54:45 2024
 Author: KD, RC, MJ, VM, IC, VK 
 Status: Under Process 
 Type: Shift summary 
 Category: Linac Commissionning | Ring Commissioning 
 Important:
 Subject: shift du 12 décembre 2024 
 Icon:  

7h50: mise en chauffe en remote (chiller, frigo, laser, modulateur)

Demarrage alignement sur l'axe du CdTe pour prendre un spectre 70 MeV

12h20 HV is 'Off', Stop RF to go to bunker

- SHUTTER ligne X en defaut - Essai de resoudre le probleme, sans succes -
Appel Harold

13h20 HV is 'On'

Investigation on the X-rays

Several vertical scans

In the single trigger mode the vertical scans give sigma ~70-80 um while in the normal mode (10 Hz injection)  the scan is very wide. The results are in agreement with the shape of the beam on MRSV. Should be understood.

The storage is good at 70 MeV

18h10 End of the shift

 

Attachment 1: Screenshot_from_2024-12-12_17-36-05.png  68 kB  Uploaded Thu Dec 12 17:55:53 2024  | Hide | Hide all | Show all
Screenshot_from_2024-12-12_17-36-05.png
Attachment 2: Screenshot_from_2024-12-12_17-17-34.png  363 kB  Uploaded Thu Dec 12 17:58:56 2024  | Hide | Hide all | Show all
Screenshot_from_2024-12-12_17-17-34.png
Attachment 3: LightScreenshot_from_2024-12-12_13-55-06.png  319 kB  Uploaded Thu Dec 12 17:59:12 2024  | Hide | Hide all | Show all
LightScreenshot_from_2024-12-12_13-55-06.png
Attachment 4: Screenshot_from_2024-12-12_17-14-00.png  98 kB  Uploaded Thu Dec 12 18:03:33 2024  | Show | Hide all | Show all
Attachment 5: Screenshot_from_2024-12-12_12-19-34.png  105 kB  Uploaded Thu Dec 12 18:03:57 2024  | Show | Hide all | Show all
Attachment 6: Screenshot_from_2024-12-12_11-39-38.png  48 kB  Uploaded Thu Dec 12 18:04:08 2024  | Hide | Hide all | Show all
Screenshot_from_2024-12-12_11-39-38.png
Attachment 7: Screenshot_from_2024-12-12_14-38-20.png  131 kB  Uploaded Thu Dec 12 18:04:32 2024  | Hide | Hide all | Show all
Screenshot_from_2024-12-12_14-38-20.png
ELOG V3.1.4-395e101