8h50 Start of the modumator and all subsystems
PC client 1 was frozen => we restarted
10h20 HV on 1215 V
RF gun phase 28 dg., Att. 0.0 dB, Charge -106 pC
The beam shape at screen TL/DG/SST.01 is very strange. Big change. Try to allign the QP1 QP3
Steerers: H [2.48 -4.46]; V [-1.86 2.29]
Section Att. 2.77 dB, Phase 208, TL/BPM2 X= 0.1
11h45 Ring injection. Ri-c2/ps/str.06-h.01 and Ri-c2/ps/str.06-v.01 tango servers were off
12h59 Measure Beem energy with TL Steerer: 53.2 MeV (screenshot), TL/BPPM2 X about zero.
12h53 Start ring RF
14h0 Section chiller 'off' (unknown reason), Energy start to drop . Switch to 'on'.
15h27 Modulator on Standby
16h30 HV on.
16h37 Modulator 'off' voluntary. Unknown reason.
17h55 HV 'on' 1215 V, Section Phase 217, -125 pC
18h30 'access controle' to install shunt resistances of 33 Ohm at four magnets (close placed).
18h55 HV 'on' 1215 V, Section Phase 217, -125 pC
Orbit at straight sections goes down on 2 mm.
19h13 Stop ThomX
|