Message ID: 955     Entry time: Thu Nov 7 08:53:22 2024
 Author: IC, VK, VM, JN 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring 
 Important:
 Subject:  
 Icon:  

8h50 Start of the modumator and all subsystems

PC client 1 was frozen => we restarted

10h20 HV on 1215 V

RF gun phase 28 dg., Att. 0.0 dB, Charge -106 pC

The beam shape at screen TL/DG/SST.01 is very strange. Big change. Try to allign the QP1 QP3

Steerers: H [2.48 -4.46]; V [-1.86 2.29]

Section Att. 2.77 dB, Phase 208,  TL/BPM2 X= 0.1

11h45 Ring injection. Ri-c2/ps/str.06-h.01 and   Ri-c2/ps/str.06-v.01 tango servers were off

12h59 Measure Beem energy with TL Steerer: 53.2 MeV (screenshot), TL/BPPM2 X about zero.

12h53 Start ring RF

14h0 Section chiller 'off' (unknown reason), Energy start to drop . Switch to 'on'.

15h27 Modulator on Standby

16h30 HV on.

16h37 Modulator 'off' voluntary. Unknown reason.

17h55 HV 'on' 1215 V, Section Phase 217, -125 pC

18h30 'access controle' to install shunt resistances of 33 Ohm at four magnets (close placed).

18h55 HV 'on' 1215 V, Section Phase 217, -125 pC

Orbit at straight sections goes down on 2 mm.

19h13 Stop ThomX

 

 

 

Attachment 1: Screenshot_from_2024-11-07_10-57-55.png  202 kB  Uploaded Thu Nov 7 11:09:13 2024  | Show | Hide all | Show all
Attachment 2: TL_SST1_QP1QP3ZeroScreenshot_from_2024-11-07_10-58-30.png  330 kB  Uploaded Thu Nov 7 11:09:29 2024  | Hide | Hide all | Show all
TL_SST1_QP1QP3ZeroScreenshot_from_2024-11-07_10-58-30.png
Attachment 3: TLSST1QP1QP3onScreenshot_from_2024-11-07_11-00-47.png  390 kB  Uploaded Thu Nov 7 11:09:54 2024  | Hide | Hide all | Show all
TLSST1QP1QP3onScreenshot_from_2024-11-07_11-00-47.png
Attachment 4: Screenshot_from_2024-11-07_19-09-59.png  86 kB  Uploaded Thu Nov 7 19:11:42 2024  | Hide | Hide all | Show all
Screenshot_from_2024-11-07_19-09-59.png
Attachment 5: Screenshot_from_2024-11-07_19-01-44.png  90 kB  Uploaded Thu Nov 7 19:11:42 2024  | Show | Hide all | Show all
Attachment 6: Screenshot_from_2024-11-07_18-56-43.png  87 kB  Uploaded Thu Nov 7 19:11:42 2024  | Show | Hide all | Show all
ELOG V3.1.4-395e101