HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
Message ID: 942     Entry time: Wed Oct 23 17:30:58 2024
 Author: Entered by Super Team from 134.158.195.141 on Wed Oct 23 17:27:14 2024 
 Status: Under Process 
 Type: Shift summary 
 Category: Linac Commissionning 
 Important:
 Subject:  
 Icon:  

Gun phase 50 dg., At 0.5 dB; Sect phase 230 dg. At 2.65 dB; Sol. 220 A, Gun charge -131 pC, Linac -112 pC, TL  -120 pC.

Linac steerers: H [2.2 -3.83], V [-1.46 2.1].

It was atempt to measure dispersion xith TL/BPM2 and the section attenuator. See figure. 

It was atempt to measure dispersion xith TL/BPM2 and the section attenuator. See figure. It is unpossible  to check TL/BPM2 with the TL/SST.02 camera because a lot of bright spots on the image.

17h50 end of the shift.

Attachment 1: DispersionTLBPM2.png  18 kB  | Hide | Hide all