8h45 Mise en chauffe refroidissement et modulateur

9h visite

on a du acquiter les vannes avec jive

10h30 demarrage faisceau

srt1 [H,V] 2.26 , -3.30
srt2 [H,V] -4.42 , 4.16

 

Scan de l'iris en fonction des steerers (cf image)

12h Pause

14h restart

Goal: transport the beam to the ring and start ring injection.

Start all the Ring elements.

Try to establish the beam transport.

Several problems: go to THOMX MPS mode (Noureddine fixed), several problem with modulator (Maher fixed).

Server 5 was restarted. We lost all the initial settings (temperature, phases, attenuator). Fo future, it is better to store these values in the config file to avoid the problem during the restart of the DS on client 5.

During all the day, continuos problem with shutter. We tried several times to reset it (with keys), it did not really help. It is impossible to transport the beam as the charge is low and the beam shape is very strange.

17h50 Finally got the reasonable beam at the ring rntrance

Injection. First turns.

Injection Kicker timing adjusted from -7.23 to -7.4 . Need to scan for optimum.

Few 100s turns in the ring.

18.40End of the Shift.

 

 

 

 

Attachment 1: Scan_Iris_220A.png  18 kB  Uploaded Tue Oct 1 13:06:21 2024  | Show | Hide all | Show all
Attachment 2: Scan_Iris_200A.png  18 kB  Uploaded Tue Oct 1 13:06:34 2024  | Show | Hide all | Show all
Attachment 3: TLSST3Screenshot_from_2024-10-01_17-44-44.png  379 kB  Uploaded Tue Oct 1 19:00:04 2024  | Hide | Hide all | Show all
TLSST3Screenshot_from_2024-10-01_17-44-44.png
Attachment 4: TLSST3Screenshot_from_2024-10-01_17-48-42.png  400 kB  Uploaded Tue Oct 1 19:00:12 2024  | Show | Hide all | Show all
Attachment 5: Screenshot_from_2024-10-01_17-58-36.png  57 kB  Uploaded Tue Oct 1 19:00:20 2024  | Show | Hide all | Show all
Attachment 6: RingScreenshot_from_2024-10-01_18-33-08.png  67 kB  Uploaded Tue Oct 1 19:38:05 2024  | Hide | Hide all | Show all
RingScreenshot_from_2024-10-01_18-33-08.png
Attachment 7: OscScreenshot_from_2024-10-01_18-35-00.png  155 kB  Uploaded Tue Oct 1 19:38:22 2024  | Show | Hide all | Show all
Attachment 8: Screenshot_from_2024-10-01_18-38-51.png  54 kB  Uploaded Tue Oct 1 19:39:03 2024  | Show | Hide all | Show all
ELOG V3.1.4-395e101