8h50 Warming up the machine
Problem with the vaccum around the RF cavity (see screenshot attached). Intervention of vacuum team is needed.
Mohamed is installing the powermeter to monitor the incomingt RF power for the accelerating structure.
Laser camera should be checked before the beam start-up
Due to the vaccum cable connector we can not start the beam. |