HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
Message ID: 850     Entry time: Fri Mar 1 10:30:38 2024
 Author: VK, VM, IC 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring | Ring Commissioning 
 Important:
 Subject: Recomissioning of the SR, search for the revolution frequency  
 Icon:  

8h50 Start of the machine

Laser amplifier was somehow OFF. Very strange situation and not clear why it happen. To be understood.

Call Viktor, who came and start the laser.

Start the beam. No beam. No e- from gun. Call Vincent.

Many instabilities in e-beam signals.

Retuning Linac, attenuator =2.114  for 50 MeV (why ??? calibration problem ?)

Work on orbit correction, starting from natural one. Slight optics tuning. Frequency 500.067 MHz. The hor. tune is 0.18

Small horizontal, small vertical steerers.

At some aatenuator or frequency values, the energy jitter appears and a lot of mistriggers.

Good storage obtained. Recipie saved : recipe_recipe_LI_TL_RI_good_20240301_15_50_35.txt

For TL orbit and Ring Orbit see screenshots.

 

 

 

 

 

 

16.10 Stop machine. Ronic, Daniele need access for FP Cavity.

 

 

 

Attachment 1: Screenshot_from_2024-03-01_12-38-33.png  83 kB  Uploaded Fri Mar 1 16:18:50 2024  | Hide | Hide all | Show all
Screenshot_from_2024-03-01_12-38-33.png
Attachment 2: Screenshot_from_2024-03-01_12-42-10.png  87 kB  Uploaded Fri Mar 1 16:19:22 2024  | Hide | Hide all | Show all
Screenshot_from_2024-03-01_12-42-10.png
Attachment 3: Screenshot_from_2024-03-01_14-54-03.png  282 kB  Uploaded Fri Mar 1 16:19:53 2024  | Show | Hide all | Show all
Attachment 4: Screenshot_from_2024-03-01_15-23-58.png  128 kB  Uploaded Fri Mar 1 16:20:06 2024  | Hide | Hide all | Show all
Screenshot_from_2024-03-01_15-23-58.png
Attachment 5: Screenshot_from_2024-03-01_15-24-13.png  111 kB  Uploaded Fri Mar 1 16:20:32 2024  | Hide | Hide all | Show all
Screenshot_from_2024-03-01_15-24-13.png
Attachment 6: Screenshot_from_2024-03-01_12-38-33.png  83 kB  Uploaded Mon Mar 4 11:07:30 2024  | Show | Hide all | Show all
Attachment 7: closed_orbitGOOD_STORAGE_RF100kV_COR_01032024.png  179 kB  Uploaded Mon Mar 4 11:14:26 2024  | Hide | Hide all | Show all
closed_orbitGOOD_STORAGE_RF100kV_COR_01032024.png
Attachment 8: closed_orbitNATURAL_RF100kV_woCOR_01032024.png  171 kB  Uploaded Mon Mar 4 11:14:59 2024  | Hide | Hide all | Show all
closed_orbitNATURAL_RF100kV_woCOR_01032024.png
Attachment 9: closed_orbitNATURAL_woRF_01032024.png  151 kB  Uploaded Mon Mar 4 11:15:20 2024  | Hide | Hide all | Show all
closed_orbitNATURAL_woRF_01032024.png
Attachment 10: dspersionHor_01032024.png  399 kB  Uploaded Mon Mar 4 11:17:24 2024  | Hide | Hide all | Show all
dspersionHor_01032024.png
Attachment 11: TLSpXvsAtt_01032024.png  71 kB  Uploaded Mon Mar 4 11:18:22 2024  | Hide | Hide all | Show all
TLSpXvsAtt_01032024.png
Attachment 12: TLSpXvsDP_01032024.png  72 kB  Uploaded Mon Mar 4 11:18:43 2024  | Hide | Hide all | Show all
TLSpXvsDP_01032024.png
Attachment 13: Screenshot_from_2024-03-01_13-19-44.png  333 kB  Uploaded Mon Mar 4 11:23:32 2024  | Hide | Hide all | Show all
Screenshot_from_2024-03-01_13-19-44.png
ELOG V3.1.4-395e101