Message ID: 834     Entry time: Thu Jan 25 08:49:29 2024
 Author: VC DN ND, IC, VM, KD, AS RC , VK... 
 Status: Under Process 
 Type: Shift summary 
 Category: Linac Commissionning | Ring Commissioning 
 Important:
 Subject: commitionning 
 Icon:  

8h45 demarrage chauffage Modulateur et frigo

Pb sur le serveur li/opt.02-las.01-asp.01 connection au device impossible  (pc laser demarré par Kevin)

8h50 demarrage chiller et cycling magnet   => OK

9h13 demarrage ampli laser PC

9h30 Git pull

10h20 Demarrage faisceau

10h27 Recette chargee: all_20240124_18_17_03

10h33 ajustement attenuateur laser de 320 a 350 pour augmenter la charge

Phase RF section 126

10h53 Etude de l'influence de la phase laser sur la phase RF.

10h55: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=0

10h58: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=10000

11h00: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=20000

11h02: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=30000

11h04: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=40000

11h07: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=50000

11h12: LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds=60000

Apparement LI/OP/OPT.02-LAS.01-SPS.01 PhaseShifterPhaseFemtoSeconds a un effet de quelques degres sur la phase RF...

11h18 Effet d'un balayage PhaseShiftFrequency dans LI/OP/OPT.02-LAS.01-SPS.01 sur la charge.

11h32 phase anneau initiale 2320, new phase: 4500

Tuning of the TL to transport the beam on axis after the first dipole (minimize the effect of passing the qudrupoles off-axis before the ring). TL dipole current change 159.3 to 160.8. Scanning of the dispersion at the entranct of the ring. After optimization, the storage was imroved.  The new receipt is

recipe_recipe_LI_TL_RI_all_20240125_17_12_13.txt

For this receipt the x- beam position @TL BPM2 should be 0 mm.

During the first 5-10 ms of storage the beam loss occurrs. To be investigated and studied.

The TbTX data for 1000 triggers has been analyzed to see the synchrotron phase (see the plot attached)

Amplitude deviation = 39.4266%
Frequency deviation = 0.18863%
Phase deviation = 47.4992 degrees
Average position deviation = 0.56405%

The TbTX data on the BPM2 taken on 24/01 and 25/01 was analyzed (see the plots attached, 'TbtX_BPM2_999turn_20 turn_24Jan25Jan_comparizon' file)

 

Plein de choses a ecrire... Acces PERLE, des rayons X,...

Une dizaine de personnes en SdC.

 

15h30 scan en temps du kicker d 'extraction.

Si le Kicker d 'extraction est trop tard il parasite le faisceau injecte.

Si le kicker d 'extraction est trop tot on sort de l acceptance longitudinale du BPM (cf images).

Un changement de temps de declenchement du BPM de la EL est a envisager mais cela affectera le BPM LI.

Suggestion de retard pour le kicker d 'extraction: -8.310us

Arret vers 17h30 par je-sas-pas-qui aui n'a pas poste le log.

Rayons X paramètres de fin de journée : (données écrite dans le e-log effacées)

** La table optique a été scannée mais aucun optimum "flagrant" n'a été trouvé

** flux "stable" en fin de journée. Le tube X a été dégagé des différentes structures qui obstruées le faisceau.

** image prise du centre du faisceau

** pré-alignement transfocateur avec image prise (pinholes + racks lentilles 22 et 17)

** trend de stabilité du flux. Il manque un facteur 10, fluctuation importantes d'un lock à l'autre (un facteur 2 sur le flux (entre 15 et 30 nA)

Paramètre synchro CFP/Anneau :

* delai trig/cfp (19.4ns),

* dephaseur 500MHz (7.2V),

* setpoint cavité CFP (0V) sur pente négative,

* phase rigol (0° voie1, 204° voie2).

Attachment 1: health_check_2024_01_25_10_20.png  16 kB  Uploaded Thu Jan 25 10:25:46 2024  | Hide | Hide all | Show all
health_check_2024_01_25_10_20.png
Attachment 2: scan_Laser_vs_RF_phase_2024_01_25_10_24.png  44 kB  Uploaded Thu Jan 25 10:26:08 2024  | Hide | Hide all | Show all
scan_Laser_vs_RF_phase_2024_01_25_10_24.png
Attachment 3: scan_Laser_vs_RF_phase_2024_01_25_10_55.png  42 kB  Uploaded Thu Jan 25 10:57:52 2024  | Hide | Hide all | Show all
scan_Laser_vs_RF_phase_2024_01_25_10_55.png
Attachment 4: scan_Laser_vs_RF_phase_2024_01_25_10_58.png  40 kB  Uploaded Thu Jan 25 10:59:28 2024  | Show | Hide all | Show all
Attachment 5: scan_Laser_vs_RF_phase_2024_01_25_11_00.png  37 kB  Uploaded Thu Jan 25 11:01:31 2024  | Hide | Hide all | Show all
scan_Laser_vs_RF_phase_2024_01_25_11_00.png
Attachment 6: scan_Laser_vs_RF_phase_2024_01_25_11_02.png  41 kB  Uploaded Thu Jan 25 11:04:27 2024  | Hide | Hide all | Show all
scan_Laser_vs_RF_phase_2024_01_25_11_02.png
Attachment 7: scan_Laser_vs_RF_phase_2024_01_25_11_04.png  42 kB  Uploaded Thu Jan 25 11:05:47 2024  | Hide | Hide all | Show all
scan_Laser_vs_RF_phase_2024_01_25_11_04.png
Attachment 8: scan_Laser_vs_RF_phase_2024_01_25_11_07.png  40 kB  Uploaded Thu Jan 25 11:07:59 2024  | Hide | Hide all | Show all
scan_Laser_vs_RF_phase_2024_01_25_11_07.png
Attachment 9: scan_Laser_vs_RF_phase_2024_01_25_11_12.png  41 kB  Uploaded Thu Jan 25 11:12:55 2024  | Hide | Hide all | Show all
scan_Laser_vs_RF_phase_2024_01_25_11_12.png
Attachment 10: Screenshot_from_2024-01-25_11-18-55.png  6 kB  Uploaded Thu Jan 25 11:19:06 2024  | Show | Hide all | Show all
Attachment 11: bpm_0_vs_ext_kicker_second_15h59.png  100 kB  Uploaded Thu Jan 25 16:02:57 2024  | Hide | Hide all | Show all
bpm_0_vs_ext_kicker_second_15h59.png
Attachment 12: Screenshot_from_2024-01-25_15-53-54.png  120 kB  Uploaded Thu Jan 25 16:03:07 2024  | Hide | Hide all | Show all
Screenshot_from_2024-01-25_15-53-54.png
Attachment 13: Screenshot_from_2024-01-25_15-58-31.png  120 kB  Uploaded Thu Jan 25 16:03:18 2024  | Hide | Hide all | Show all
Screenshot_from_2024-01-25_15-58-31.png
Attachment 14: bpm_0_vs_ext_kicker_second_16h22.png  85 kB  Uploaded Thu Jan 25 16:29:29 2024  | Hide | Hide all | Show all
bpm_0_vs_ext_kicker_second_16h22.png
Attachment 15: Screenshot_from_2024-01-25_17-14-11.png  73 kB  Uploaded Fri Jan 26 11:12:36 2024  | Hide | Hide all | Show all
Screenshot_from_2024-01-25_17-14-11.png
Attachment 16: Screenshot_from_2024-01-25_17-13-45.png  791 kB  Uploaded Fri Jan 26 11:13:22 2024  | Hide | Hide all | Show all
Screenshot_from_2024-01-25_17-13-45.png
Attachment 17: Screenshot_from_2024-01-25_17-12-36.png  786 kB  Uploaded Fri Jan 26 11:14:29 2024  | Hide | Hide all | Show all
Screenshot_from_2024-01-25_17-12-36.png
Attachment 18: Screenshot_from_2024-01-25_13-05-25.png  324 kB  Uploaded Fri Jan 26 11:16:47 2024  | Hide | Hide all | Show all
Screenshot_from_2024-01-25_13-05-25.png
Attachment 19: S_HisPhase.png  11 kB  Uploaded Mon Jan 29 09:18:18 2024  | Hide | Hide all | Show all
S_HisPhase.png
Attachment 20: S_Phase25012025.png  17 kB  Uploaded Mon Jan 29 09:18:39 2024  | Hide | Hide all | Show all
S_Phase25012025.png
Attachment 21: S_Ampl25012025.png  23 kB  Uploaded Mon Jan 29 09:19:10 2024  | Hide | Hide all | Show all
S_Ampl25012025.png
Attachment 22: figSRorbit_25012024.png  184 kB  Uploaded Mon Jan 29 09:23:12 2024  | Hide | Hide all | Show all
figSRorbit_25012024.png
Attachment 23: TbtX_BPM2_999turn_20_turn_24Jan25Jan_comparizon.pdf  756 kB  Uploaded Mon Jan 29 09:25:53 2024
Attachment 24: untitled.png  491 kB  Uploaded Mon Jan 29 17:07:59 2024  | Hide | Hide all | Show all
untitled.png
Attachment 25: mesures_X_stable_table_presque_opt2.dat  1.319 MB  Uploaded Mon Jan 29 17:07:59 2024  | Show | Hide all | Show all
Attachment 26: image_00140.tif  1.101 MB  Uploaded Mon Jan 29 17:07:59 2024
Attachment 27: image_00143.tif  1.101 MB  Uploaded Mon Jan 29 17:07:59 2024
ELOG V3.1.4-395e101