Message ID: 770     Entry time: Wed Jun 14 18:18:32 2023
 Author: VK, IC. VM 
 Status:  
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject: Srart of the beam physics measurements 
 Icon:  

The main idea fo this week is to prepare the beam for the search of the first X-rays.

Start machine without RF cavity. During the day several reboot of the libera.02 (TL).

Study of the dispersion. Measurements of the horizontal dispersion by changing the injector energy (RF section attenuator).

Orbit correction.

Study of the tune. Tune response with the steptune. Tune measurements.

First try to measure the horizontal beta function at the quadrupoles.

RF Cavity ON. Good storage at 50 kV 500.38 MHz. Dispersive orbit. SHould understand how to reduce it. 

Different studies on the orbit.

Observations: position at the  TL/DG/BPM.02-LIB.02/SpX drifts a lot (a few mm range) all day long. We should correct it all the time to keep the beam orbit and storage.

Attachment 1: scan_charge_phase_min_0.0_max_360.0_11_27_6.png  47 kB  Uploaded Wed Jun 14 19:27:05 2023  | Hide | Hide all | Show all
scan_charge_phase_min_0.0_max_360.0_11_27_6.png
Attachment 2: dspersionHor5_14062023.png  220 kB  Uploaded Wed Jun 14 19:33:35 2023  | Show | Hide all | Show all
Attachment 3: TLSpXvsAtt5_14062023.png  59 kB  Uploaded Wed Jun 14 19:34:00 2023  | Show | Hide all | Show all
Attachment 4: TLSpXvsDP5_14062023.png  68 kB  Uploaded Wed Jun 14 19:34:21 2023  | Hide | Hide all | Show all
TLSpXvsDP5_14062023.png
Attachment 5: beta_measurements_14062023.png  295 kB  Uploaded Wed Jun 14 19:35:58 2023  | Hide | Hide all | Show all
beta_measurements_14062023.png
Attachment 6: Screenshot_from_2023-06-14_16-47-56.png  939 kB  Uploaded Wed Jun 14 19:36:15 2023  | Hide | Hide all | Show all
Screenshot_from_2023-06-14_16-47-56.png
Attachment 7: closed_orbit_withRF_14062023.png  96 kB  Uploaded Wed Jun 14 19:36:32 2023  | Show | Hide all | Show all
Attachment 8: Bpm_withRF_14062023.png  145 kB  Uploaded Wed Jun 14 19:36:51 2023  | Hide | Hide all | Show all
Bpm_withRF_14062023.png
Attachment 9: closed_orbit100turns_withRF_14062023.png  651 kB  Uploaded Wed Jun 14 19:37:14 2023  | Show | Hide all | Show all
Attachment 10: closed_orbit100turns_14062023.png  413 kB  Uploaded Wed Jun 14 19:37:39 2023  | Hide | Hide all | Show all
closed_orbit100turns_14062023.png
Attachment 11: closed_orbit_14062023.png  108 kB  Uploaded Wed Jun 14 19:38:17 2023  | Hide | Hide all | Show all
closed_orbit_14062023.png
Attachment 12: Bpm_14062023.png  139 kB  Uploaded Wed Jun 14 19:38:27 2023  | Hide | Hide all | Show all
Bpm_14062023.png
Attachment 13: Screenshot_from_2023-06-14_17-59-59.png  472 kB  Uploaded Wed Jun 14 19:39:14 2023  | Hide | Hide all | Show all
Screenshot_from_2023-06-14_17-59-59.png
Attachment 14: Screenshot_from_2023-06-14_16-59-38.png  126 kB  Uploaded Wed Jun 14 19:53:33 2023  | Hide | Hide all | Show all
Screenshot_from_2023-06-14_16-59-38.png
ELOG V3.1.4-395e101