The main idea fo this week is to prepare the beam for the search of the first X-rays.
Start without RF cavity. Study of the orbit. Orbit correction. We menage to correct hor. and vert. orbit.
We put the RF cavity ON. A lot of interlocks during the day. Difficult to operate i this conditions.
Optimization of the storage.
Orbit corresponds to the disperive orbit. Should look at this. Maybe tune the frequency.
Very good storage was obtained. The Ring dipoles were changed to 160 A to minimize synchrotron oscillations and so improve storage. The orbit did not change.
Beam physics measurements to be started. |