Message ID: 769     Entry time: Tue Jun 13 18:06:14 2023
 Author: VK, IC. VM, ND, LS 
 Status:  
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject: beam storage 
 Icon:  

The main idea fo this week is to prepare the beam for the search of the first X-rays.

Start without RF cavity. Study of the orbit. Orbit correction. We menage to correct hor. and vert. orbit.

We put the RF cavity ON. A lot of interlocks during the day. Difficult to operate i this conditions.

Optimization of the storage.

Orbit corresponds to the disperive orbit. Should look at this. Maybe tune the frequency.

Very good storage was obtained. The Ring dipoles were changed to 160 A to minimize synchrotron oscillations and so improve storage. The orbit did not change.

Beam physics measurements to be started.

Attachment 1: closed_orbit_13062023.png  182 kB  Uploaded Tue Jun 13 19:43:22 2023  | Show | Show all
Attachment 2: Screenshot_from_2023-06-13_18-27-36.png  65 kB  Uploaded Tue Jun 13 19:43:44 2023  | Show | Show all
Attachment 3: Screenshot_from_2023-06-13_18-25-45.png  358 kB  Uploaded Tue Jun 13 19:44:25 2023  | Show | Show all
Attachment 4: Screenshot_from_2023-06-13_17-23-16_WO_RF.png  335 kB  Uploaded Tue Jun 13 19:45:23 2023  | Show | Show all
ELOG V3.1.4-395e101