Message ID: 763     Entry time: Mon Jun 12 14:52:39 2023
 Author: VK, IC. VM 
 Status:  
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject: Reestablishing running conditions at 500.38 MHz 
 Icon:  

Goal of the shift: Reestablish the good storage at 500.38 and then try to optimize the storage and orbit.

Start up of the machine.

RF cavity start up by Mohamed. Water leakage. Jean-Noel will fix tomorrow mornig. Mohamed also says that aparently the sinal from ring syntetizer is a bit noisy, to be checked with Nicolas.

problem with trigger of the TL BPM. Nicola fixed the problem. The cable was broken.

Load of the machine setting from 19/05. The injection in the ring is very unstable from shot to shot due to the tuning of the cavity. Coming to 100 kV @500.38 MHz synchronized with the ring. RF cavity works stable.

Beam on TL BPM.02 drifts a lot and very fast. See screenshots.

With the previous setting, we did not get the previous orbit. After small reoptimization we received the resonable storage. Still we should work on the orbit correction.

The main idea fo this week is to prepare the beam for the search of the first X-rays.

 

Attachment 1: scan_charge_phase_min_0.0_max_360.0_14_32_59.png  50 kB  Uploaded Mon Jun 12 18:46:47 2023  | Show | Hide all | Show all
Attachment 2: Screenshot_from_2023-06-12_15-23-07.png  83 kB  Uploaded Mon Jun 12 18:47:02 2023  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2023-06-12_15-40-14.png  84 kB  Uploaded Mon Jun 12 18:47:17 2023  | Show | Hide all | Show all
Attachment 4: Screenshot_from_2023-06-12_17-38-24.png  112 kB  Uploaded Mon Jun 12 18:47:33 2023  | Show | Hide all | Show all
Attachment 5: Screenshot_from_2023-06-12_17-32-48.png  61 kB  Uploaded Mon Jun 12 18:47:44 2023  | Hide | Hide all | Show all
Screenshot_from_2023-06-12_17-32-48.png
ELOG V3.1.4-395e101