Message ID: 754     Entry time: Fri May 19 18:05:29 2023
 Author: VK, IC 
 Status:  
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject: RF frequency of the Ring 
 Icon:  

In the morning, after the start-up pf the machine, scan phase-charge and small tuning it was possible to store the beam with the settings from previous day.

The storage was optimize withthe dipole current of 159.9 (best storage up to now). RF cqvity voltqge 20-100 kV.

Work on the orbit correction and BPM.

The the dipole current was tuned to the nominal current 159.3 A with sufficient storage. AT ~18h the RF cavity went down.

To be continued.

Attachment 1: scan_charge_phase_min_0.0_max_360.0_10_43_35.png  47 kB  Uploaded Fri May 19 19:13:48 2023  | Show | Hide all | Show all
Attachment 2: Screenshot_from_2023-05-19_13-50-56.png  52 kB  Uploaded Fri May 19 19:14:10 2023  | Hide | Hide all | Show all
Screenshot_from_2023-05-19_13-50-56.png
Attachment 3: Screenshot_from_2023-05-19_13-56-41.png  266 kB  Uploaded Fri May 19 19:14:25 2023  | Show | Hide all | Show all
Attachment 4: Screenshot_from_2023-05-19_12-15-50.png  932 kB  Uploaded Fri May 19 19:14:46 2023  | Show | Hide all | Show all
ELOG V3.1.4-395e101