Message ID: 750     Entry time: Fri May 5 08:47:28 2023
 Author: KD VM VK JN SL 
 Status: Under Process 
 Type: Shift summary 
 Category: Ring Commissioning 
 Important:
 Subject: shift du 5 mai 2023 
 Icon:  

8h30 : accès casemate controlé 

==> septum et kickers OFF et cavité RF OFF

==> problème cavité RF, mux 3 défaut de communication

==> impossible d'acquité les interlocks et redémarrer la cavité.

Morning restart of machine was easy for the same parameters from day before.

 

Problem with network was fixed by G. Philippon, it was due to the limited number of allowed ports in the new swith that was recently replaced.

Still we cannot start RF Cavity with Jean Noel. Ampli is working, but no communication of Consigne from Tango to LLRF hardware.

14.30 Cavity on, getting power.

Frequency 500.41->500.4094, and phase manual optimisation.

Power in cavity is changing from 60 kV to 80kV for  80kV setpoint.

Saving data for postprocess. Orbit correction.

Beam is stable and stored. Orbit is positive. energy is about 50.075MeV, ring dipoles 160A. Sextupoles on.

Extraction kicker started to extract just before injection.

 

 

 

 

 

 

 

 

 

 

Attachment 1: Screenshot_from_2023-05-05_17-25-28.png  82 kB  Uploaded Fri May 5 19:01:01 2023  | Hide | Hide all | Show all
Screenshot_from_2023-05-05_17-25-28.png
Attachment 2: Screenshot_from_2023-05-05_17-13-31.png  788 kB  Uploaded Fri May 5 19:01:28 2023  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2023-05-05_17-13-41.png  795 kB  Uploaded Fri May 5 19:02:12 2023  | Show | Hide all | Show all
Attachment 4: Screenshot_from_2023-05-05_17-52-52.png  27 kB  Uploaded Fri May 5 19:05:15 2023  | Hide | Hide all | Show all
Screenshot_from_2023-05-05_17-52-52.png
Attachment 5: Screenshot_from_2023-05-05_17-50-31.png  135 kB  Uploaded Fri May 5 19:05:28 2023  | Show | Hide all | Show all
ELOG V3.1.4-395e101