Message ID: 744
Entry time: Fri Apr 28 09:20:00 2023
|
|
|
9:19: Mise en chauffe
10:24 Cycling magnets
10:50 Demarrage faisceau
11:21 load recipe_recipe_LI_TL_RI_all_20230317_15_52_23.txt
Beam to RI-C2/BPM.05
Problem with injection kicker. Not triggering and DS says Charging power supply is OFF. Maher came to solve the problem (14h). Most probably this was a reason of only 1 turn during the last days.
15h Studies on the DPI and SEPT on the injection (1st BPM x-orbit). Compared to yesterday run, we see the good response on change of the DPI ans SEPT. The first BPM is at +(4-6) mm.
Without injection kicker, beam is lost after ~1 turn.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|