Message ID: 744     Entry time: Fri Apr 28 09:20:00 2023
 Author: ND, LS, IC, VM, VK 
 Status: New Solution 
 Type: Shift summary 
 Category: Ring 
 Important:
 Subject: Prise de donnee 27/4/2023 
 Icon:  

9:19: Mise en chauffe

10:24 Cycling magnets

10:50 Demarrage faisceau

11:21 load recipe_recipe_LI_TL_RI_all_20230317_15_52_23.txt

Beam to RI-C2/BPM.05

Problem with injection kicker. Not triggering and DS says Charging power supply is OFF. Maher came to solve the problem (14h). Most probably this was a reason of only 1 turn during the last days.

15h Studies on the DPI and SEPT on the injection (1st BPM x-orbit). Compared to yesterday run, we see the good response on change of the DPI ans SEPT. The first BPM is at +(4-6) mm.

Without injection kicker, beam is lost after ~1 turn.

 

 

Attachment 1: scan_charge_phase_min_0.0_max_360.0_10_57_35.png  51 kB  Uploaded Fri Apr 28 11:58:00 2023  | Show | Hide all | Show all
Attachment 2: 2023-04-28_11_05_30_tl_dg_sst_02-ccd_01_RAW.png  663 kB  Uploaded Fri Apr 28 12:05:51 2023  | Hide | Hide all | Show all
2023-04-28_11_05_30_tl_dg_sst_02-ccd_01_RAW.png
Attachment 3: 2023-04-28_11_07_37_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png  164 kB  Uploaded Fri Apr 28 12:07:53 2023  | Show | Hide all | Show all
Attachment 4: Screenshot_from_2023-04-28_15-10-52.png  67 kB  Uploaded Fri Apr 28 16:11:51 2023  | Hide | Hide all | Show all
Screenshot_from_2023-04-28_15-10-52.png
Attachment 5: Screenshot_from_2023-04-28_15-13-24.png  70 kB  Uploaded Fri Apr 28 16:13:39 2023  | Show | Hide all | Show all
Attachment 6: LiSST01_2023-04-28_15-29-59.png  277 kB  Uploaded Fri Apr 28 16:34:27 2023  | Hide | Hide all | Show all
LiSST01_2023-04-28_15-29-59.png
Attachment 7: SST01_2023-04-28_15-26-21.png  290 kB  Uploaded Fri Apr 28 16:34:39 2023  | Show | Hide all | Show all
Attachment 8: SST02_2023-04-28_15-18-42.png  531 kB  Uploaded Fri Apr 28 16:34:52 2023  | Hide | Hide all | Show all
SST02_2023-04-28_15-18-42.png
Attachment 9: SST_03_2023-04-28_15-15-46.png  282 kB  Uploaded Fri Apr 28 16:35:03 2023  | Hide | Hide all | Show all
SST_03_2023-04-28_15-15-46.png
Attachment 10: BLM_MIX_2023-04-28_15-38-57.png  197 kB  Uploaded Fri Apr 28 16:39:51 2023  | Hide | Hide all | Show all
BLM_MIX_2023-04-28_15-38-57.png
ELOG V3.1.4-395e101