Message ID: 734     Entry time: Thu Apr 13 08:16:42 2023
 Author: KD, ND, Lisa 
 Status: Under Process 
 Type: Shift summary 
 Category: LI | TL | LE | Diag 
 Important:
 Subject: shift du 13 avril 2023 
 Icon:  

8h20 : mise en chauffe chiller/Frigo, Modulateur, Laser et PA.

9:30 Verification health check

- er/sy/rac.17-elr.01-rdp.03 ne demarre pas

9:50 Cyclage des aimants

10:30 Temperature chiller section > 31

11:00 Intervention vide:

- LI/VA/PEG.04 Tout semble normal malgr'e l' alarme sur l'atkpanel

- pour CFP: acces anneau, pas de fuite trouvee

11:17 Intervention MO+JNC pour probleme frigo => resolu.

11:45 Demarrage faisceau.

Charge 120pC => attenuation laser de 360 a 345 => charge 100pC

14:00 Transport faisceau.

Pb reglage en temps TL/DG/SST.01. Nouveau retard: 50e3us. Exposure: 0.04s

Phase section: 109

15:20 Sur EL/DG/SST.01 on voit que le faisceau est coupe pendant le transport... (cf copie d'ecran)

15:30 Reglage coupelle de Faraday EL/DG/FC.01.

Retard de ER/CA/WAC.03: -6.29us. Adaptation 50 ohm a faire.

Verifier qu'il ne se declenche que sur le canal exterieur et pas sur toutes les voies (par exemple apres coupure electrique).

16:15 Recette de transport jusqu'a EL/DG/FC sauvee dans TL+LE:Test recipes

16:30 Observation Cerenkov: Cf video sur https://photos.app.goo.gl/42HKzkkWm84QKhhEA

Passage a 5Hz.

Alignement OBL. Il reste du travail à faire (1/2 journée) pour atteindre la salle laser.

17:20 Arret ThomX

Attachment 1: health_check_2023_04_13_09_35.png  17 kB  Uploaded Thu Apr 13 10:36:08 2023  | Show | Hide all | Show all
Attachment 2: health_check_RF_Redpitaya_2023_04_13_09_46.png  32 kB  Uploaded Thu Apr 13 10:46:55 2023  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2023-04-13_09-49-05.png  46 kB  Uploaded Thu Apr 13 10:49:33 2023  | Show | Hide all | Show all
Attachment 4: Screenshot_from_2023-04-13_09-57-41.png  96 kB  Uploaded Thu Apr 13 10:57:49 2023  | Hide | Hide all | Show all
Screenshot_from_2023-04-13_09-57-41.png
Attachment 5: scan_charge_phase_min_0.0_max_360.0_10_12_20.png  48 kB  Uploaded Thu Apr 13 11:16:19 2023  | Hide | Hide all | Show all
scan_charge_phase_min_0.0_max_360.0_10_12_20.png
Attachment 6: scan_charge_phase_min_30.0_max_70.0_10_13_4.png  44 kB  Uploaded Thu Apr 13 11:16:29 2023  | Hide | Hide all | Show all
scan_charge_phase_min_30.0_max_70.0_10_13_4.png
Attachment 7: Screenshot_from_2023-04-13_10-46-51.png  92 kB  Uploaded Thu Apr 13 11:47:02 2023  | Hide | Hide all | Show all
Screenshot_from_2023-04-13_10-46-51.png
Attachment 8: Screenshot_from_2023-04-13_11-20-45.png  91 kB  Uploaded Thu Apr 13 12:20:54 2023  | Hide | Hide all | Show all
Screenshot_from_2023-04-13_11-20-45.png
Attachment 9: EL_FC_01_retard_6_09us.png  38 kB  Uploaded Thu Apr 13 16:47:10 2023  | Hide | Hide all | Show all
EL_FC_01_retard_6_09us.png
Attachment 10: EL_FC_01_retard_6_29us.png  36 kB  Uploaded Thu Apr 13 16:47:21 2023  | Show | Hide all | Show all
Attachment 11: 2023-04-13_15_49_56_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_1000.png  9.871 MB  Uploaded Thu Apr 13 16:50:16 2023  | Hide | Hide all | Show all
2023-04-13_15_49_56_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_1000.png
ELOG V3.1.4-395e101